Job Info for 0720-03-143

County: HARRIS Highway: SH 249 Date: 08/07/2018 (6 years ago) Engineer's Estimate: $3,915,081 Control Number: 0720-03-143
Project: STP 1802(437)HES District: HOUSTON Time: 362 WORKING DAYS Type: INTERCONNECT SIGNALS
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,915,081.14
ALLSTATE SIGNAL & CONSTRUCTION, LLC   $3,528,350.31 1
-9.88% | -$386,730.83
VACA UNDERGROUND UTILITIES INC   $3,874,881.15 2
-1.03% | -$40,199.99
9.82% | $346,530.84
FLORIDA TRAFFIC CONTROL DEVICES, INC.   $3,940,500.28 3
0.65% | $25,419.14
11.68% | $412,149.97
1.69% | $65,619.13
CREACOM, INC.   $4,714,570.06 4
20.42% | $799,488.92
33.62% | $1,186,219.75
19.64% | $774,069.78
Subcontractor Percentage Amount
TCH DIRECTIONAL DRILLING 13.68% $482,678.32
CHIRON COMMUNICATION SERVICES, LLC 6.11% $215,582.20
LONESTAR TRAFFIC SAFETY, LLC 1.14% $40,223.19
Total: 20.93% $738,483.71

Bid Items

Items: 22, 0 filtered
HARRIS SH 249  |  HOUSTON  |  0720-03-143  |  08/07/2018  |  $3,915,081  |  STP 1802(437)HES  |  INTERCON SIG  |  362 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ALLSTATE SIGNAL & CONSTRUCTION, LLC VACA UNDERGROUND UTILITIES INC FLORIDA TRAFFIC CONTROL DEVICES, INC. CREACOM, INC.
500 6001 MOBILIZATION LS 1.000 $356,000.000 $75,000.000 $260,000.000 $298,899.340 $471,442.460
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 30.000 $1,000.000 $2,219.000 $2,000.000 $841.020 $6,221.160
618 6046 CONDT (PVC) (SCH 80) (2") LF 68,926.000 $6.750 $8.180 $6.000 $10.650 $12.470
618 6047 CONDT (PVC) (SCH 80) (2") (BORE) LF 23,300.000 $12.200 $10.240 $8.000 $14.120 $20.390
618 6070 CONDT (RM) (2") LF 1,725.000 $18.500 $22.720 $22.000 $18.140 $20.660
618 6071 CONDT (RM) (2") (BORE) LF 80.000 $18.000 $25.000 $45.000 $21.160 $62.480
620 6002 ELEC CONDR (NO.14) INSULATED LF 92,292.000 $0.650 $0.720 $1.000 $0.680 $0.450
636 6001 ALUMINUM SIGNS (TY A) SF 74.250 $23.150 $28.750 $40.000 $23.310 $26.540
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 8.000 $461.300 $100.000 $800.000 $956.960 $552.180
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 2.000 $300.000 $300.000 $525.000 $819.260 $426.160
644 6076 REMOVE SM RD SN SUP&AM EA 5.000 $76.150 $50.000 $250.000 $199.510 $143.250
685 6004 INSTL RDSD FLSH BCN ASSM (SOLAR PWRD) EA 8.000 $5,566.000 $6,002.000 $5,000.000 $5,131.110 $4,663.460
6007 6011 FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER) LF 2,249.000 $3.600 $7.550 $24.750 $9.760 $19.330
6007 6013 FIBER OPTIC CBL (SNGLE-MODE)(36 FIBER) LF 96,596.000 $3.100 $2.310 $3.400 $1.110 $1.090
6007 6089 FO SPLICE ENCLOSURE (TYPE 2) EA 48.000 $1,370.000 $1,573.000 $900.000 $905.270 $825.400
6007 6094 FIBER OPTIC FUSION SPLICE EA 1,872.000 $69.800 $47.960 $40.000 $30.370 $12.080
6007 6098 FIBER OPTIC PATCH PANEL (36 POSITION) EA 2.000 $23,888.000 $1,344.000 $3,015.000 $775.760 $1,421.580
6016 6010 ITS MULTI-DUCT CND (PVC-80) LF 64,027.000 $15.000 $14.380 $17.000 $15.930 $17.550
6016 6011 ITS MULTI-DUCT CND (PVC-80)(BORE) LF 20,388.000 $24.850 $20.450 $23.000 $21.900 $25.920
6016 6013 ITS MULTI-DUCT CND (RMC) LF 2,076.000 $52.150 $62.770 $56.000 $95.610 $51.110
6027 6003 CONDUIT (PREPARE) LF 2,575.000 $0.650 $1.500 $1.000 $1.730 $2.210
6186 6002 ITS GND BOX(PCAST) TY 1 (243636)W/APRN EA 195.000 $2,597.850 $2,795.000 $3,000.000 $2,585.030 $3,162.570
Totals: $3,915,081.14 $3,528,350.32 $3,874,881.15 $3,940,500.29 $4,714,570.06