PREPARING ROW
|
STA
|
40.000
|
$5,000.000
|
$1,500.000
|
$3,350.000
|
$7,500.000
|
$1,200.000
|
$7,000.000
|
$2,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
6.050
|
$8.490
|
$500.000
|
$100.000
|
$356.310
|
$50.000
|
$100.000
|
$127.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
547.230
|
$16.140
|
$4.000
|
$5.000
|
$7.320
|
$10.000
|
$1.000
|
$6.000
|
|
|
REMOVING CONC (SAWCUT)
|
LF
|
1,075.000
|
$13.720
|
$2.000
|
$4.000
|
$11.590
|
$3.000
|
$10.000
|
$2.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
47.400
|
$3.870
|
$105.000
|
$12.000
|
$13.150
|
$20.000
|
$40.000
|
$9.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
22,500.000
|
$11.700
|
$9.750
|
$3.500
|
$2.850
|
$14.000
|
$6.000
|
$11.000
|
|
|
BACKFILL (TY A OR B)
|
CY
|
19,018.000
|
$9.590
|
$0.500
|
$5.400
|
$3.400
|
$15.000
|
$1.000
|
$18.900
|
|
|
BLOCK SODDING
|
SY
|
33,880.000
|
$3.900
|
$3.850
|
$4.000
|
$4.990
|
$3.650
|
$1.000
|
$4.000
|
|
|
FERTILIZER
|
AC
|
6.900
|
$620.000
|
$792.000
|
$800.000
|
$1,139.290
|
$750.000
|
$800.000
|
$1,140.000
|
|
|
VEGETATIVE WATERING
|
MG
|
828.000
|
$14.000
|
$29.560
|
$45.000
|
$56.060
|
$20.000
|
$20.000
|
$78.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
13,042.000
|
$3.500
|
$5.560
|
$6.100
|
$5.020
|
$3.000
|
$6.000
|
$10.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
176.000
|
$285.000
|
$205.900
|
$300.000
|
$359.840
|
$305.000
|
$300.000
|
$289.000
|
|
|
CEM TRT(PLNT MX) (CL L)(TY E)(GR 4)(6")
|
SY
|
13,042.000
|
$6.500
|
$20.000
|
$19.200
|
$21.100
|
$20.000
|
$22.000
|
$11.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
711.000
|
$109.230
|
$142.000
|
$140.000
|
$152.470
|
$142.000
|
$140.000
|
$125.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
12,872.000
|
$75.000
|
$84.000
|
$87.000
|
$80.000
|
$80.000
|
$90.000
|
$90.000
|
|
|
STRUCT EXCAV
|
CY
|
10.810
|
$10.000
|
$500.000
|
$1.000
|
$4.500
|
$75.000
|
$50.000
|
$749.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
5,784.950
|
$8.000
|
$2.500
|
$1.000
|
$1.000
|
$5.000
|
$10.000
|
$36.000
|
|
|
CEM STABIL BKFL
|
CY
|
623.180
|
$89.100
|
$50.000
|
$59.000
|
$0.570
|
$70.000
|
$50.000
|
$69.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
8.620
|
$58.000
|
$50.000
|
$59.000
|
$57.000
|
$70.000
|
$50.000
|
$143.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,047.000
|
$3.000
|
$2.000
|
$1.000
|
$0.010
|
$1.000
|
$1.000
|
$3.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
34.000
|
$835.790
|
$978.000
|
$905.000
|
$830.000
|
$820.000
|
$900.000
|
$817.000
|
|
|
CL C CONC (INLET)
|
CY
|
24.000
|
$1,100.000
|
$731.550
|
$550.000
|
$447.550
|
$500.000
|
$800.000
|
$329.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.000
|
$475.790
|
$374.000
|
$510.000
|
$2,602.300
|
$600.000
|
$600.000
|
$605.000
|
|
|
RIPRAP (CONC) (CL B) (6")
|
CY
|
14.400
|
$433.530
|
$318.000
|
$485.000
|
$1,116.270
|
$300.000
|
$600.000
|
$365.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
614.000
|
$94.240
|
$87.000
|
$105.000
|
$116.320
|
$65.000
|
$200.000
|
$160.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
234.000
|
$122.010
|
$114.000
|
$130.000
|
$147.270
|
$95.000
|
$200.000
|
$185.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
199.000
|
$152.000
|
$155.000
|
$170.000
|
$213.570
|
$120.000
|
$200.000
|
$240.000
|
|
|
INLET (STG II)(TY AAD)
|
EA
|
1.000
|
$4,480.000
|
$2,690.000
|
$5,200.000
|
$5,364.910
|
$4,500.000
|
$8,000.000
|
$7,256.000
|
|
|
INLET (STG II)(TY AD)
|
EA
|
7.000
|
$3,400.000
|
$2,770.000
|
$3,700.000
|
$3,718.180
|
$2,800.000
|
$4,800.000
|
$5,426.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
10.000
|
$2,676.230
|
$3,270.000
|
$1,450.000
|
$1,418.860
|
$1,500.000
|
$2,500.000
|
$3,551.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$2,520.000
|
$2,620.000
|
$1,710.000
|
$1,721.360
|
$3,500.000
|
$7,000.000
|
$3,663.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$3,270.000
|
$2,110.000
|
$2,181.230
|
$1,900.000
|
$3,800.000
|
$3,663.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,752.660
|
$3,270.000
|
$3,410.000
|
$3,584.000
|
$3,000.000
|
$3,800.000
|
$4,880.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$4,400.000
|
$2,835.000
|
$4,000.000
|
$4,179.250
|
$4,500.000
|
$8,000.000
|
$6,245.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$6,000.000
|
$3,490.000
|
$4,700.000
|
$4,962.360
|
$5,000.000
|
$5,500.000
|
$5,066.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$5,077.690
|
$3,490.000
|
$5,300.000
|
$5,662.540
|
$4,200.000
|
$5,500.000
|
$6,245.000
|
|
|
SET (TY II) (48 IN) (CMP) (4: 1) (P)
|
EA
|
1.000
|
$2,000.000
|
$4,585.000
|
$6,410.000
|
$6,865.250
|
$6,000.000
|
$9,000.000
|
$8,652.000
|
|
|
SET (REMOV & REINSTALL)
|
EA
|
1.000
|
$1,000.000
|
$1,540.000
|
$1,300.000
|
$1,148.760
|
$700.000
|
$2,500.000
|
$534.000
|
|
|
PIPE (PVC) (SCH 40) (20 IN)
|
LF
|
6.000
|
$346.140
|
$81.000
|
$370.000
|
$126.050
|
$150.000
|
$200.000
|
$151.000
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$500.000
|
$600.000
|
$680.000
|
$962.340
|
$200.000
|
$500.000
|
$847.000
|
|
|
REMOV STR (PIPE)
|
LF
|
150.200
|
$26.000
|
$18.000
|
$15.000
|
$32.160
|
$5.000
|
$10.000
|
$31.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$380,820.000
|
$320,000.000
|
$345,000.000
|
$119,680.150
|
$350,000.000
|
$340,000.000
|
$434,273.810
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$1,100.000
|
$2,000.000
|
$779.450
|
$1,250.000
|
$8,000.000
|
$2,668.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
180.000
|
$33.820
|
$36.310
|
$40.000
|
$56.010
|
$32.000
|
$30.000
|
$32.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
180.000
|
$12.000
|
$1.530
|
$11.000
|
$17.140
|
$0.890
|
$10.000
|
$13.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
15.750
|
$10.000
|
$1.560
|
$30.000
|
$48.030
|
$20.000
|
$20.000
|
$108.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
13,580.000
|
$3.600
|
$3.570
|
$3.700
|
$4.710
|
$3.500
|
$3.500
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
13,580.000
|
$0.900
|
$1.020
|
$0.500
|
$1.110
|
$1.000
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
256.000
|
$7.000
|
$6.110
|
$5.000
|
$8.580
|
$5.500
|
$6.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
256.000
|
$1.330
|
$1.030
|
$1.600
|
$3.320
|
$1.000
|
$1.000
|
$7.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,260.000
|
$8.700
|
$12.000
|
$16.000
|
$17.330
|
$4.000
|
$20.000
|
$18.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,260.000
|
$7.480
|
$1.000
|
$12.000
|
$4.160
|
$4.000
|
$1.000
|
$13.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,260.000
|
$8.700
|
$1.000
|
$16.000
|
$17.330
|
$15.570
|
$15.000
|
$18.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
2,453.000
|
$6.000
|
$4.250
|
$5.000
|
$4.110
|
$5.000
|
$5.000
|
$5.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
369.000
|
$80.000
|
$100.000
|
$75.000
|
$110.320
|
$150.000
|
$100.000
|
$68.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
1,982.000
|
$69.360
|
$56.000
|
$63.000
|
$54.330
|
$45.000
|
$63.000
|
$62.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
642.000
|
$25.760
|
$21.000
|
$24.100
|
$57.820
|
$28.000
|
$25.000
|
$29.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,470.000
|
$1,100.000
|
$1,519.360
|
$1,707.720
|
$1,500.000
|
$1,800.000
|
$1,761.000
|
|
|
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
|
EA
|
1.000
|
$35,000.000
|
$22,000.000
|
$39,423.290
|
$35,500.000
|
$40,000.000
|
$32,000.000
|
$33,910.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
425.000
|
$9.850
|
$18.750
|
$13.500
|
$15.000
|
$12.150
|
$13.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 40) (3") (STL ENCSE)
|
LF
|
780.000
|
$30.420
|
$45.500
|
$31.590
|
$64.000
|
$28.420
|
$30.000
|
$63.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
270.000
|
$9.350
|
$19.900
|
$15.260
|
$21.000
|
$13.730
|
$15.000
|
$21.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
115.000
|
$20.000
|
$30.000
|
$19.910
|
$27.000
|
$17.910
|
$20.000
|
$27.000
|
|
|
CONDT (PVC) (SCH 80) (3") (CONC ENCSE)
|
LF
|
1,820.000
|
$41.000
|
$22.000
|
$17.360
|
$23.000
|
$15.620
|
$17.000
|
$23.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,425.000
|
$1.200
|
$1.330
|
$1.600
|
$1.800
|
$1.440
|
$1.500
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,850.000
|
$1.400
|
$1.500
|
$1.690
|
$1.850
|
$1.520
|
$1.600
|
$2.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
115.000
|
$1.900
|
$1.570
|
$1.690
|
$1.900
|
$1.520
|
$1.600
|
$2.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
230.000
|
$1.750
|
$1.790
|
$1.980
|
$2.000
|
$1.780
|
$2.000
|
$2.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
1.000
|
$1,200.000
|
$907.000
|
$1,029.210
|
$1,100.000
|
$926.000
|
$1,000.000
|
$1,105.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
1.000
|
$5,571.880
|
$6,275.000
|
$6,570.920
|
$6,800.000
|
$6,000.000
|
$6,500.000
|
$6,429.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$750.000
|
$897.920
|
$739.120
|
$900.000
|
$800.000
|
$900.000
|
$849.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
1,440.000
|
$1.270
|
$1.680
|
$1.830
|
$1.800
|
$1.650
|
$1.750
|
$2.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
10.000
|
$5.000
|
$6.120
|
$6.670
|
$6.750
|
$6.000
|
$6.500
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
32.000
|
$6.000
|
$6.120
|
$6.670
|
$6.750
|
$6.000
|
$6.500
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
6,112.000
|
$0.050
|
$0.080
|
$0.090
|
$0.100
|
$0.080
|
$0.100
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
196.000
|
$0.100
|
$0.100
|
$0.110
|
$0.120
|
$0.100
|
$0.200
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
390.000
|
$0.250
|
$0.160
|
$0.180
|
$0.200
|
$0.160
|
$0.200
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
36.000
|
$0.400
|
$0.240
|
$0.270
|
$0.300
|
$0.240
|
$0.300
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$10.000
|
$5.100
|
$5.560
|
$6.100
|
$5.000
|
$6.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$20.000
|
$5.100
|
$5.560
|
$6.100
|
$5.000
|
$6.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$12.000
|
$5.100
|
$5.560
|
$6.100
|
$5.000
|
$6.000
|
$10.000
|
|
|
REMOVAL OF CONDUIT
|
LF
|
750.000
|
$4.700
|
$11.000
|
$5.960
|
$6.400
|
$5.360
|
$6.000
|
$6.000
|
|
|
REMOVAL OF CABLES
|
LF
|
2,970.000
|
$0.700
|
$0.710
|
$0.510
|
$1.650
|
$0.460
|
$0.500
|
$2.000
|
|
|
GROUTING
|
CF
|
80.840
|
$64.650
|
$100.000
|
$47.730
|
$13.850
|
$6.680
|
$35.000
|
$73.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
135.000
|
$2.000
|
$21.580
|
$22.900
|
$130.000
|
$20.600
|
$22.000
|
$129.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(36 FIBER)
|
LF
|
4,870.000
|
$2.000
|
$2.420
|
$2.310
|
$4.750
|
$2.080
|
$2.200
|
$5.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
4,870.000
|
$4.800
|
$6.600
|
$4.520
|
$5.750
|
$4.070
|
$4.400
|
$6.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
368.000
|
$45.000
|
$31.880
|
$41.120
|
$60.000
|
$37.000
|
$40.000
|
$58.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(BORE)
|
LF
|
780.000
|
$36.990
|
$75.390
|
$41.480
|
$72.000
|
$37.320
|
$40.000
|
$70.000
|
|
|
ITS MULTI-DUCT CND (PVC-80)
|
LF
|
1,820.000
|
$35.000
|
$28.970
|
$24.550
|
$26.000
|
$22.090
|
$24.000
|
$25.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
730.000
|
$0.750
|
$4.730
|
$0.880
|
$4.300
|
$0.790
|
$1.000
|
$4.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
9.000
|
$375.000
|
$275.160
|
$148.930
|
$408.000
|
$134.000
|
$140.000
|
$358.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
5,022.000
|
$0.750
|
$2.090
|
$2.280
|
$2.500
|
$2.050
|
$2.500
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
1,090.000
|
$0.770
|
$2.300
|
$2.500
|
$2.700
|
$2.250
|
$2.500
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
196.000
|
$1.280
|
$4.590
|
$5.000
|
$5.500
|
$4.500
|
$5.000
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
390.000
|
$2.500
|
$6.630
|
$7.220
|
$7.900
|
$6.500
|
$7.000
|
$5.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
36.000
|
$6.400
|
$13.260
|
$14.450
|
$15.800
|
$13.000
|
$14.000
|
$13.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
888.000
|
$0.770
|
$2.300
|
$2.500
|
$2.700
|
$2.250
|
$2.500
|
$3.000
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
2.000
|
$156.000
|
$331.500
|
$361.230
|
$390.000
|
$325.000
|
$350.000
|
$369.000
|
|
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
|
EA
|
2.000
|
$300.000
|
$362.100
|
$394.570
|
$433.000
|
$355.000
|
$400.000
|
$352.000
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
2.000
|
$220.000
|
$341.700
|
$372.340
|
$408.000
|
$335.000
|
$350.000
|
$379.000
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$195.000
|
$100.000
|
$250.000
|
$190.000
|
$65.000
|
$250.000
|
$177.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
2.000
|
$3,600.000
|
$5,150.000
|
$6,646.500
|
$9,000.000
|
$6,000.000
|
$6,500.000
|
$8,030.000
|
|
|
RELOCATE HIGH MAST LIGHTING ASSEMBLY
|
EA
|
1.000
|
$24,000.000
|
$22,000.000
|
$14,886.820
|
$10,000.000
|
$14,000.000
|
$15,000.000
|
$11,204.000
|
|
|
SANITARY SEWER (21 IN) (PVC) (SDR 35)
|
LF
|
6.000
|
$12.000
|
$81.000
|
$370.000
|
$515.000
|
$180.000
|
$200.000
|
$236.000
|
|
Totals: |
$3,571,759.541
|
$3,336,063.585
|
$3,474,504.513
|
$3,480,000.004
|
$3,533,069.411
|
$3,777,754.330
|
$4,348,048.830
|