Job Info for 0500-03-637

County: HARRIS Highway: IH 45 Date: 08/06/2020 (4 years ago) Engineer's Estimate: $1,685,149 Control Number: 0500-03-637
Project: C 500-3-637 District: HOUSTON Time: 75 WORKING DAYS Type: LANDSCAPE AND SCENIC ENHANCEMENT

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,685,148.60
BOYER, INC.   $1,555,526.00 1
-7.69% | -$129,622.60
TEXAS WALL & LANDSCAPE   $1,933,638.55 2
14.75% | $248,489.95
24.31% | $378,112.55

Bid Items

Items: 30, 0 filtered
HARRIS IH 45  |  HOUSTON  |  0500-03-637  |  08/06/2020  |  $1,685,149  |  C 500-3-637  |  LANDSCAPE AND SCENIC ENHAN  |  75 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate BOYER, INC. TEXAS WALL & LANDSCAPE
100 6006 PREP ROW (TREE)(LESS THAN 24" DIA) EA 266.000 $425.000 $150.000 $300.000
100 6013 PREP ROW (TREE) (2" TO 12" DIA) EA 347.000 $250.000 $310.000 $240.000
161 6009 EROSION CONTROL COMPOST CY 8,301.000 $25.000 $16.000 $15.000
161 6012 GENERAL USE COMPOST CY 4,135.000 $30.000 $16.000 $15.000
168 6001 VEGETATIVE WATERING MG 1,518.000 $45.000 $95.000 $30.000
180 6002 WILDFLOWER SEEDING (MIX 1) AC 8.870 $1,250.000 $1,004.000 $1,100.000
180 6003 WILDFLOWER SEEDING (MIX 2) AC 8.870 $1,250.000 $1,445.000 $1,250.000
192 6003 PLANT MATERIAL (3-GAL) EA 3,259.000 $15.000 $14.000 $21.000
192 6012 MULCH CY 11,475.000 $12.000 $13.000 $22.000
192 6021 PLANT MATERIAL (5 GAL) (TREE) EA 7,284.000 $20.000 $17.000 $22.000
192 6023 PLANT MATERIAL (15 GAL) (TREE) EA 1,470.000 $100.000 $75.000 $100.000
192 6059 PALM MATERIAL (TYPE I) EA 23.000 $95.000 $57.000 $1,400.000
192 6060 PALM MATERIAL (TYPE II) EA 171.000 $95.000 $57.000 $1,300.000
192 6061 PALM MATERIAL (TYPE III) EA 16.000 $95.000 $57.000 $1,500.000
192 6065 PLANT BED PREP (TYPE III) SY 75,286.000 $2.000 $0.280 $1.250
193 6001 PLANT MAINTENANCE MO 1.000 $18,500.000 $221,000.980 $60,000.000
193 6002 PLANT MAINTENANCE CYC 8.000 $9,000.000 $18,500.000 $9,500.000
500 6001 MOBILIZATION LS 1.000 $108,750.000 $108,792.000 $85,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $3,500.000 $1,650.000 $11,000.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 560.000 $4.000 $4.250 $8.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 560.000 $1.000 $0.240 $0.500
1006 6001 LANDSCAPE SOIL AMENDMENT (TYPE I) SY 75,286.000 $0.200 $0.320 $0.250
1006 6002 LANDSCAPE SOIL AMENDMENT (TYPE II) SY 75,286.000 $0.150 $0.270 $0.250
1022 6001 LANDSCAPE TREATMENT(TY 1) EA 8,754.000 $1.500 $1.000 $1.000
1022 6002 LANDSCAPE TREATMENT(TY 2) EA 43,160.000 $0.400 $0.500 $0.800
1022 6003 LANDSCAPE TREATMENT(TY 3) EA 1.000 $90,000.000 $267.000 $96,000.000
1022 6004 LANDSCAPE TREATMENT(TY 4) EA 1.000 $37,000.000 $9,250.000 $35,000.000
1022 6005 LANDSCAPE TREATMENT (TY 5) EA 12,013.000 $0.500 $0.090 $0.350
6185 6002 TMA (STATIONARY) DAY 10.000 $340.000 $330.000 $1,000.000
6185 6005 TMA (MOBILE OPERATION) DAY 10.000 $80.000 $401.000 $1,000.000
Totals: $1,685,148.60 $1,555,526.00 $1,933,638.55