PREPARING ROW
|
STA
|
304.000
|
$10,000.000
|
$36,400.000
|
$33,333.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
302,701.000
|
$5.900
|
$7.000
|
$5.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
8,389.000
|
$6.000
|
$5.000
|
$5.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
4,208.000
|
$9.000
|
$8.000
|
$6.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
35,303.000
|
$7.890
|
$4.000
|
$9.000
|
|
|
REMOVING CONC (COPING)
|
LF
|
198.000
|
$15.040
|
$50.000
|
$25.000
|
|
|
REMOVE CONC BARRIER W/CHAIN LINK FENCE
|
LF
|
186.000
|
$16.250
|
$25.000
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-22")
|
SY
|
337,561.000
|
$3.000
|
$2.000
|
$5.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
148,065.000
|
$9.500
|
$10.000
|
$4.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
32,755.540
|
$80.000
|
$10.000
|
$8.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
378,288.000
|
$8.000
|
$9.000
|
$11.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
4,476.480
|
$15.000
|
$9.000
|
$6.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
47,286.000
|
$39.330
|
$40.000
|
$33.000
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
8,821.000
|
$41.220
|
$40.000
|
$33.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
108,382.000
|
$0.920
|
$1.000
|
$0.570
|
|
|
BLOCK SODDING
|
SY
|
342,741.000
|
$2.950
|
$2.850
|
$2.760
|
|
|
STRAW OR HAY MULCH
|
SY
|
333,944.000
|
$0.220
|
$0.100
|
$0.210
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
225,562.000
|
$0.120
|
$0.150
|
$0.060
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
108,382.000
|
$0.180
|
$0.180
|
$0.130
|
|
|
FERTILIZER
|
AC
|
140.000
|
$710.320
|
$500.000
|
$567.360
|
|
|
VEGETATIVE WATERING
|
MG
|
16,778.000
|
$15.430
|
$18.000
|
$10.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
458,748.000
|
$2.500
|
$1.650
|
$2.760
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
6,231.000
|
$180.000
|
$200.000
|
$182.150
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
447,743.000
|
$9.500
|
$4.000
|
$6.750
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
24,660.000
|
$80.000
|
$58.000
|
$80.340
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
82,793.000
|
$60.000
|
$50.000
|
$55.060
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
341,569.000
|
$70.000
|
$40.000
|
$66.060
|
|
|
CONC PAV (JOINT REINF) (6")
|
SY
|
9,143.000
|
$55.000
|
$40.000
|
$67.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
3,022.000
|
$100.000
|
$105.000
|
$104.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(15")
|
SY
|
2,620.000
|
$135.000
|
$106.000
|
$108.000
|
|
|
STRUCT EXCAV
|
CY
|
8,821.000
|
$2.070
|
$7.000
|
$6.000
|
|
|
CEM STABIL BKFL
|
CY
|
36,499.450
|
$50.000
|
$39.700
|
$30.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
531.000
|
$50.000
|
$213.900
|
$140.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
2,452.000
|
$50.000
|
$39.700
|
$30.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
47,073.950
|
$1.000
|
$1.400
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
103,026.000
|
$21.030
|
$1.000
|
$3.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
1,067.000
|
$94.370
|
$100.000
|
$46.550
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
3,740.000
|
$129.530
|
$125.000
|
$127.580
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
7,422.000
|
$127.300
|
$150.000
|
$180.320
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
7,967.000
|
$162.300
|
$250.000
|
$260.560
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
1,362.000
|
$163.510
|
$300.000
|
$327.280
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
84.000
|
$96.430
|
$65.000
|
$103.520
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
115.000
|
$114.250
|
$95.000
|
$184.400
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
2,992.000
|
$272.090
|
$250.000
|
$385.770
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
28.000
|
$394.740
|
$566.790
|
$566.790
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
988.000
|
$613.460
|
$628.210
|
$628.210
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
13.200
|
$230.000
|
$271.470
|
$271.470
|
|
|
CL C CONC (ABUT)
|
CY
|
591.800
|
$804.680
|
$1,000.000
|
$1,000.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
236.900
|
$1,861.940
|
$1,200.000
|
$2,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
750.900
|
$662.150
|
$1,200.000
|
$1,000.000
|
|
|
CL C CONC (CAP)(EXTEND)
|
CY
|
22.400
|
$2,095.770
|
$1,500.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
396.400
|
$823.880
|
$1,200.000
|
$1,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
23.200
|
$315.000
|
$200.000
|
$550.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
792.200
|
$693.610
|
$800.000
|
$1,450.000
|
|
|
CL C CONC (SIGN FOOTING)
|
CY
|
274.400
|
$558.560
|
$800.000
|
$800.000
|
|
|
REINF CONC SLAB
|
SF
|
113,225.000
|
$11.060
|
$13.000
|
$15.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
79,799.000
|
$25.000
|
$21.000
|
$24.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
3,658.000
|
$9.000
|
$11.000
|
$12.000
|
|
|
REINF CONC SLAB (SLAB BEAM)(EXT SLAB)
|
SF
|
4,134.000
|
$35.000
|
$10.000
|
$24.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
19,078.000
|
$15.000
|
$11.000
|
$12.250
|
|
|
RETAINING WALL (MSE) (WAVE SCHEME)
|
SF
|
116,117.000
|
$30.000
|
$30.000
|
$27.690
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
612.000
|
$149.600
|
$85.000
|
$100.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
153.000
|
$148.550
|
$100.000
|
$100.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
8,216.550
|
$75.000
|
$100.000
|
$100.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
11,402.950
|
$133.790
|
$110.000
|
$100.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
5,848.500
|
$92.890
|
$120.000
|
$100.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1,612.000
|
$350.000
|
$450.000
|
$380.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
1,173.000
|
$425.000
|
$450.000
|
$400.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
1,110.000
|
$500.000
|
$450.000
|
$380.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
468.970
|
$156.000
|
$150.000
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
392.000
|
$480.000
|
$450.000
|
$475.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
728.000
|
$5.140
|
$12.000
|
$15.000
|
|
|
RAIL (TY T221)
|
LF
|
52.000
|
$100.000
|
$60.000
|
$500.000
|
|
|
RAIL (TY SSTR)
|
LF
|
5,778.600
|
$37.000
|
$40.000
|
$47.000
|
|
|
RAIL (TY C221)
|
LF
|
52.000
|
$191.000
|
$100.000
|
$650.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
96.000
|
$145.000
|
$135.000
|
$250.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
62,646.700
|
$31.000
|
$35.000
|
$47.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
771.000
|
$148.180
|
$110.770
|
$650.000
|
|
|
RETROFIT RAIL (TY C221)
|
LF
|
418.000
|
$125.000
|
$130.770
|
$750.000
|
|
|
RETROFIT RAIL (ADD HSS)
|
LF
|
826.000
|
$74.230
|
$150.000
|
$250.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
1,052.000
|
$102.390
|
$100.000
|
$130.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
1,194.550
|
$430.000
|
$211.850
|
$158.370
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
826.990
|
$280.000
|
$211.800
|
$169.600
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
602.600
|
$261.000
|
$240.700
|
$190.720
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
1,303.500
|
$310.000
|
$284.400
|
$238.030
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
4,123.820
|
$330.410
|
$320.250
|
$261.230
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
368.100
|
$282.000
|
$350.100
|
$286.910
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
360.000
|
$348.240
|
$431.000
|
$356.140
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,989.310
|
$73.000
|
$125.750
|
$71.820
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
13,590.940
|
$76.000
|
$68.900
|
$61.040
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
5,886.200
|
$91.000
|
$77.100
|
$70.750
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
5,957.400
|
$125.000
|
$108.950
|
$94.030
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
2,811.670
|
$152.000
|
$149.250
|
$117.200
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
5,053.780
|
$180.000
|
$180.150
|
$132.180
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
3,017.130
|
$260.000
|
$255.200
|
$183.040
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$6,714.450
|
$7,116.000
|
$6,017.660
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$11,050.000
|
$12,240.000
|
$13,805.870
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
3.000
|
$16,000.000
|
$19,159.000
|
$14,547.150
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
42.000
|
$5,937.240
|
$10,549.000
|
$9,095.080
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
45.000
|
$5,068.520
|
$5,310.000
|
$5,799.350
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
3.000
|
$3,877.300
|
$6,195.000
|
$5,551.810
|
|
|
INLET (COMPL)(TY AZR)
|
EA
|
21.000
|
$7,282.850
|
$8,647.000
|
$5,484.750
|
|
|
INLET (COMPL)(TY AZR2G)
|
EA
|
8.000
|
$7,500.000
|
$10,700.000
|
$5,632.970
|
|
|
MANH (COMPL)(TY A)
|
EA
|
43.000
|
$6,388.960
|
$6,849.000
|
$7,344.630
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
103.000
|
$6,065.720
|
$7,591.000
|
$6,652.060
|
|
|
INLET (COMPL)(TY AZ2G)
|
EA
|
53.000
|
$9,173.830
|
$7,436.000
|
$6,115.600
|
|
|
INLET (COMPL) (EXT) (TY CI)
|
EA
|
102.000
|
$3,800.000
|
$953.000
|
$2,494.790
|
|
|
HEADWALL (CH - FW - 0) (DIA= 18 IN)
|
EA
|
8.000
|
$3,800.000
|
$2,500.000
|
$4,114.510
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$7,000.000
|
$45,331.000
|
$25,647.830
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (P)
|
EA
|
1.000
|
$7,362.520
|
$7,108.000
|
$7,797.610
|
|
|
SET (TY I)(S= 7 FT)(HW= 3 FT)(3:1) (P)
|
EA
|
2.000
|
$9,500.000
|
$8,728.000
|
$7,798.920
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,150.000
|
$961.000
|
$1,659.960
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$1,500.000
|
$1,256.000
|
$2,050.760
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$7,000.000
|
$1,251.000
|
$2,020.150
|
|
|
ADJUSTING MANHOLES & INLETS
|
EA
|
2.000
|
$941.550
|
$1,482.000
|
$5,000.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
6.000
|
$438.300
|
$1,455.000
|
$1,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
124.000
|
$475.000
|
$232.000
|
$600.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
16.000
|
$550.000
|
$267.000
|
$600.000
|
|
|
REMOV STR (SET)
|
EA
|
42.000
|
$500.000
|
$132.000
|
$605.050
|
|
|
REMOV STR (HEADWALL)
|
EA
|
5.000
|
$2,000.000
|
$2,098.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
26,079.000
|
$17.000
|
$23.350
|
$15.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
4,701.000
|
$43.000
|
$54.300
|
$30.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
13.000
|
$45,000.000
|
$20,000.000
|
$1,000.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
2,923.000
|
$40.570
|
$30.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$11,200,000.000
|
$12,150,016.000
|
$11,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
48.000
|
$15,000.000
|
$5,000.000
|
$4,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
853.000
|
$41.090
|
$28.000
|
$29.900
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
853.000
|
$10.160
|
$10.000
|
$7.770
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
1,791.000
|
$41.440
|
$18.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,791.000
|
$9.210
|
$10.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
64,970.000
|
$2.300
|
$2.000
|
$2.100
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
64,970.000
|
$0.660
|
$0.500
|
$0.440
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
3,818.000
|
$3.190
|
$4.000
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,213.000
|
$4.160
|
$5.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,031.000
|
$0.780
|
$0.500
|
$0.890
|
|
|
CONSTRUCTING DETOURS
|
SY
|
45,779.000
|
$65.000
|
$35.500
|
$42.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
53,610.000
|
$5.530
|
$4.000
|
$9.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
8,080.000
|
$8.500
|
$4.000
|
$9.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
500.000
|
$19.050
|
$4.000
|
$9.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
125,640.000
|
$12.270
|
$4.000
|
$6.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
16,780.000
|
$3.600
|
$4.000
|
$6.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,320.000
|
$4.380
|
$4.000
|
$6.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
53,610.000
|
$15.750
|
$4.000
|
$6.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
8,080.000
|
$5.960
|
$4.000
|
$6.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
500.000
|
$6.830
|
$4.000
|
$6.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
2,207.000
|
$51.000
|
$40.000
|
$55.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
795.000
|
$42.330
|
$60.000
|
$66.410
|
|
|
PERM CTB (SGL SLOPE) (TY 2) (42 )
|
LF
|
21,639.000
|
$120.000
|
$35.000
|
$66.400
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
45,538.000
|
$7.500
|
$5.000
|
$5.000
|
|
|
CONC CURB (U-TURN)
|
LF
|
109.000
|
$35.000
|
$37.000
|
$25.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
2,035.000
|
$35.000
|
$7.000
|
$10.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
2,007.000
|
$100.000
|
$80.000
|
$49.920
|
|
|
CONC SIDEWALKS (5")
|
SY
|
15,221.000
|
$55.000
|
$70.000
|
$47.830
|
|
|
CURB RAMPS (TY 1)
|
EA
|
17.000
|
$2,150.000
|
$1,800.000
|
$2,114.540
|
|
|
CURB RAMPS (TY 5)
|
EA
|
7.000
|
$2,850.000
|
$2,400.000
|
$2,214.540
|
|
|
CURB RAMPS (TY 7)
|
EA
|
38.000
|
$2,200.000
|
$1,900.000
|
$2,314.540
|
|
|
CURB RAMPS (TY 21)
|
EA
|
6.000
|
$1,400.000
|
$2,600.000
|
$2,314.530
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,125.000
|
$27.000
|
$23.300
|
$23.300
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$1,550.000
|
$1,650.000
|
$1,650.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
67.000
|
$1,450.000
|
$1,060.000
|
$1,060.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,689.000
|
$2.650
|
$3.350
|
$0.850
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$2,600.000
|
$2,830.000
|
$2,830.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY III)
|
EA
|
56.000
|
$2,635.790
|
$2,860.000
|
$2,860.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
36.000
|
$2,193.130
|
$1,300.000
|
$1,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
20.000
|
$818.290
|
$610.000
|
$610.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
39.000
|
$22,870.000
|
$23,600.000
|
$23,600.000
|
|
|
REMOVE RD IL ASM (BRIDGE MOUNT)
|
EA
|
12.000
|
$447.600
|
$150.000
|
$150.000
|
|
|
REMOVE RD IL ASM (CTB MOUNT)
|
EA
|
23.000
|
$286.570
|
$150.000
|
$150.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
56.000
|
$1,020.140
|
$2,650.000
|
$150.000
|
|
|
HI MST IL POLE (125 FT)(100 MPH)
|
EA
|
26.000
|
$35,200.000
|
$39,260.920
|
$39,260.920
|
|
|
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
|
EA
|
26.000
|
$26,800.000
|
$20,196.000
|
$20,196.000
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
44,694.000
|
$8.290
|
$10.040
|
$10.040
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
18,516.000
|
$10.200
|
$8.690
|
$8.690
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
3,917.000
|
$14.300
|
$13.630
|
$13.630
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,395.000
|
$12.300
|
$14.820
|
$14.820
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
2,605.000
|
$20.850
|
$25.800
|
$25.800
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
8,580.000
|
$16.400
|
$19.110
|
$19.110
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
315.000
|
$20.900
|
$21.750
|
$21.750
|
|
|
CONDT (RM) (2")
|
LF
|
60.000
|
$28.600
|
$33.960
|
$33.960
|
|
|
CONDT (RM) (3")
|
LF
|
860.000
|
$45.970
|
$47.030
|
$47.030
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
33,304.000
|
$1.050
|
$1.040
|
$1.040
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
20,996.000
|
$1.090
|
$1.220
|
$1.220
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
41,992.000
|
$1.300
|
$1.440
|
$1.440
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
3,120.000
|
$1.150
|
$1.500
|
$1.500
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
1,100.000
|
$1.550
|
$2.450
|
$2.450
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
2,530.000
|
$1.780
|
$2.750
|
$2.750
|
|
|
TRAY CABLE (3 CONDR) (10 AWG)
|
LF
|
320.000
|
$1.730
|
$2.300
|
$2.300
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
4,300.000
|
$1.800
|
$1.940
|
$1.940
|
|
|
GROUND BOX TY A (122311)
|
EA
|
10.000
|
$632.460
|
$725.000
|
$725.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
116.000
|
$1,120.000
|
$870.000
|
$870.000
|
|
|
REMOVE GROUND BOX
|
EA
|
27.000
|
$180.000
|
$50.000
|
$50.000
|
|
|
TIMBER POLE (CL 2) 50 FT
|
EA
|
1.000
|
$1,200.000
|
$1,200.000
|
$1,200.000
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
|
EA
|
9.000
|
$7,247.610
|
$7,345.000
|
$6,845.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
3.000
|
$3,895.000
|
$6,335.000
|
$5,835.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
7.000
|
$3,200.640
|
$6,020.000
|
$5,520.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
1,889.000
|
$22.800
|
$17.100
|
$17.100
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
360.000
|
$26.790
|
$30.000
|
$30.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
4,209.000
|
$19.400
|
$22.810
|
$24.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$470.210
|
$460.000
|
$425.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
73.000
|
$476.430
|
$635.000
|
$627.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
8.000
|
$689.240
|
$800.000
|
$769.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
10.000
|
$1,602.240
|
$1,800.000
|
$1,776.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
8.000
|
$1,585.740
|
$1,900.000
|
$1,776.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
7,795.000
|
$4.620
|
$4.250
|
$4.250
|
|
|
REMOVE LRSA
|
EA
|
38.000
|
$1,607.250
|
$1,750.000
|
$750.000
|
|
|
INS OH SN SUP(35 FT BAL TEE)
|
EA
|
1.000
|
$26,055.080
|
$39,475.000
|
$39,475.000
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
10.000
|
$12,705.000
|
$11,970.000
|
$11,970.000
|
|
|
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
|
EA
|
18.000
|
$16,238.000
|
$13,856.000
|
$13,856.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$6,870.000
|
$5,500.000
|
$3,000.000
|
|
|
SIGN WALKWAY (36 IN) WITH HNDRL
|
LF
|
31.000
|
$270.310
|
$274.000
|
$274.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
854.000
|
$18.430
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
16.000
|
$23.570
|
$25.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
360.000
|
$16.000
|
$25.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
312.000
|
$32.340
|
$35.000
|
$31.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
44,416.000
|
$0.750
|
$0.890
|
$0.890
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
2,014.000
|
$1.980
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
238,604.000
|
$0.630
|
$0.890
|
$0.890
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
30,568.000
|
$1.320
|
$1.700
|
$1.700
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
5.000
|
$138.810
|
$150.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
5.000
|
$180.680
|
$175.000
|
$175.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
232,661.000
|
$0.620
|
$0.890
|
$0.890
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,206.000
|
$2.600
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,734.000
|
$5.300
|
$6.000
|
$6.000
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,206.000
|
$0.600
|
$0.750
|
$0.750
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,734.000
|
$1.000
|
$1.500
|
$1.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
29.000
|
$202.920
|
$175.000
|
$175.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
8.000
|
$337.140
|
$350.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
1.000
|
$333.050
|
$350.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
31.000
|
$248.590
|
$200.000
|
$200.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
322.000
|
$4.000
|
$8.500
|
$8.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
24.000
|
$4.090
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
4,205.000
|
$4.330
|
$4.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
29,497.000
|
$0.470
|
$0.250
|
$0.250
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
7,633.000
|
$0.430
|
$0.500
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
3,571.000
|
$1.050
|
$0.750
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,517.000
|
$1.700
|
$1.500
|
$1.500
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
7.000
|
$38.250
|
$25.000
|
$25.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
3.000
|
$44.090
|
$35.000
|
$35.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$42.010
|
$35.000
|
$35.000
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
2.000
|
$120.000
|
$100.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
233,831.000
|
$0.160
|
$0.010
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
28,972.000
|
$0.110
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
15,604.000
|
$0.200
|
$0.030
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,814.000
|
$0.350
|
$0.040
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
31.000
|
$12.110
|
$3.000
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
8.000
|
$12.860
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
1.000
|
$15.760
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
33.000
|
$12.110
|
$5.000
|
$5.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
3.000
|
$28,365.000
|
$30,199.500
|
$30,199.500
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
8.000
|
$3,180.000
|
$4,750.000
|
$2,250.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
8.000
|
$29,340.000
|
$35,501.840
|
$35,501.840
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
39.000
|
$175.000
|
$219.000
|
$219.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
11.000
|
$175.000
|
$219.000
|
$219.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
39.000
|
$175.000
|
$219.000
|
$219.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
11.000
|
$175.000
|
$219.000
|
$219.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
43.000
|
$175.000
|
$219.000
|
$219.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
14.000
|
$175.000
|
$219.000
|
$219.000
|
|
|
PED SIG SEC (LED)(2 INDICATIONS)
|
EA
|
40.000
|
$500.000
|
$25.000
|
$25.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
28.000
|
$460.000
|
$998.290
|
$998.290
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
37.000
|
$95.000
|
$109.000
|
$109.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
9.000
|
$115.000
|
$129.000
|
$129.000
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
2.000
|
$190.000
|
$129.000
|
$129.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
11,660.000
|
$1.150
|
$1.520
|
$1.520
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
11,715.000
|
$1.550
|
$1.940
|
$1.940
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
8,565.000
|
$2.050
|
$2.510
|
$2.510
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$8,355.000
|
$9,892.000
|
$9,892.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
39.000
|
$1,675.480
|
$1,223.590
|
$1,223.590
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
40.000
|
$660.000
|
$778.000
|
$778.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
7.000
|
$3,055.000
|
$1,255.000
|
$1,255.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
16.000
|
$1,700.000
|
$2,500.000
|
$5,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
48.000
|
$1,400.000
|
$2,000.000
|
$1,500.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
48.000
|
$1,000.000
|
$3,000.000
|
$500.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
48.000
|
$1,000.000
|
$2,200.000
|
$1,000.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
1,272.000
|
$265.000
|
$481.470
|
$520.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,991.000
|
$33.430
|
$107.000
|
$75.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
|
LF
|
32,058.000
|
$1.040
|
$1.330
|
$1.330
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
6,532.000
|
$1.390
|
$1.440
|
$1.440
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
32,449.000
|
$2.230
|
$3.560
|
$3.560
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
2.000
|
$4,000.000
|
$1,800.000
|
$1,800.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
624.000
|
$29.110
|
$65.600
|
$65.600
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
25,860.000
|
$0.900
|
$2.000
|
$2.000
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
7.000
|
$6,000.000
|
$6,660.000
|
$6,660.000
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$1,367.000
|
$2,750.000
|
$250.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
44,994.000
|
$12.670
|
$18.350
|
$18.350
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
2,425.000
|
$32.280
|
$34.240
|
$34.240
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
860.000
|
$64.200
|
$103.540
|
$103.540
|
|
|
COMMUNICATION HUB BUILDING
|
EA
|
1.000
|
$23,000.000
|
$22,830.000
|
$22,830.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
15,560.000
|
$0.600
|
$2.500
|
$2.500
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
1.000
|
$8,668.000
|
$3,250.000
|
$3,250.000
|
|
|
CTMS RELOCATION (CCTV)
|
EA
|
1.000
|
$6,500.000
|
$4,750.000
|
$2,250.000
|
|
|
CTMS RELOCATION (DMS)
|
EA
|
1.000
|
$7,500.000
|
$11,298.000
|
$8,798.000
|
|
|
FIBER OPTIC VIDEO DATA TRANSMITTER
|
EA
|
7.000
|
$1,146.000
|
$1,075.000
|
$1,075.000
|
|
|
FIBER OPTIC VIDEO DATA RECEIVER
|
EA
|
7.000
|
$1,146.000
|
$1,075.000
|
$1,075.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
74,951.000
|
$1.000
|
$0.450
|
$0.450
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
37,642.000
|
$1.000
|
$0.470
|
$0.470
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
713.000
|
$1.800
|
$0.650
|
$0.650
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
26,694.000
|
$2.000
|
$0.750
|
$0.750
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
9,631.000
|
$5.000
|
$2.500
|
$2.500
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
2,603.000
|
$2.300
|
$2.500
|
$2.500
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
45.000
|
$10.000
|
$8.000
|
$8.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
82,883.000
|
$0.850
|
$0.450
|
$0.450
|
|
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
|
LF
|
2,278.000
|
$1.500
|
$0.750
|
$0.750
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
1,164.000
|
$1.710
|
$2.500
|
$2.500
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
35.000
|
$4.720
|
$8.000
|
$8.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
37,642.000
|
$0.840
|
$0.450
|
$0.450
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
3.000
|
$6,460.000
|
$6,650.000
|
$6,650.000
|
|
|
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
|
EA
|
6.000
|
$5,635.000
|
$2,625.000
|
$2,625.000
|
|
|
ITS POLE (55 FT)(110 MPH)
|
EA
|
7.000
|
$11,605.000
|
$17,917.000
|
$17,917.000
|
|
|
ITS POLE (55 FT)(REM)
|
EA
|
2.000
|
$1,500.000
|
$2,000.000
|
$500.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
7.000
|
$4,840.000
|
$3,980.000
|
$3,980.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)(REM)
|
EA
|
1.000
|
$275.000
|
$1,750.000
|
$250.000
|
|
|
TMA (STATIONARY)
|
DAY
|
344.000
|
$131.440
|
$10.000
|
$162.380
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
40.000
|
$2,500.000
|
$2,947.000
|
$2,947.000
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
16.000
|
$385.000
|
$1,475.000
|
$1,475.000
|
|
|
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
|
EA
|
6.000
|
$440.000
|
$1,583.340
|
$1,583.340
|
|
|
ITS RVSD (DATA COLLECT ONLY) SYS
|
EA
|
5.000
|
$8,769.000
|
$5,680.000
|
$5,680.000
|
|
|
VIVDS TEMPORARY
|
EA
|
8.000
|
$12,160.000
|
$12,750.000
|
$12,750.000
|
|
|
INSTALLATION OF CELLULAR MODEM
|
EA
|
5.000
|
$50.000
|
$250.000
|
$250.000
|
|
|
WWD CELLULAR MODEM
|
EA
|
3.000
|
$3,740.000
|
$250.000
|
$250.000
|
|
Totals: |
$123,933,207.353
|
$110,766,237.712
|
$121,750,128.202
|