HARRIS IH 610 (0271-17-176)

Items: 109

County: HARRIS
Length: N/A
Highway: IH 610
District: HOUSTON
Control Number: 0271-17-176
DBE Goal: N/A
Project: BR 2022(925)
Guaranty: N/A
Time: 272 WORKING DAYS
Engineer's Estimate: $2,130,053.57
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
HAMOON BAHRAMI
BRETT MCLEOD
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,130,053.57
$3,121,846.99
Over/Under Est: 46.56% $991,793.42
$3,277,738.24
Over/Under Est: 53.88% $1,147,684.67
Amt Left: 4.99% $155,891.25
Over/Under Est: 68.67% $1,462,796.65
Amt Left: 15.09% $471,003.23
Delta: -9.61% -$315,111.98
Subcontractor Percentage Amount
HB FARMER FOUNDATION, LLC 11.72% $382,959.19
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.20% $39,210.84
REPUBLIC TRAFFIC SAFETY, INC. 1.18% $38,557.32
THIRD COAST SERVICES LLC 0.92% $30,061.64
WILLOW CITY SIGN & RAIL, INC. 0.67% $21,892.72
PRIMATE CONSTRUCTION, LP 0.42% $13,723.79
Total: 16.11% $526,405.50

Bid Items & Bid Tabulations

109 Total 0 of 109
HARRIS  |  IH 610  |  HOUSTON  |  0271-17-176  |  08/03/2022  |  $2,130,053.57  |  BR 2022(925)  |  BRIDGE REPL  |  272 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HARPER BROTHERS CONSTRUCTION LLC
NBG CONSTRUCTORS, INC.
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 14.000 $7,500.000 $1,400.000 $8,000.000 $25,000.000
REMOVING CONC (PAV)
SY 1,079.000 $6.500 $9.000 $25.000 $14.000
REMOVING CONC (SIDEWALKS)
SY 257.000 $15.000 $5.000 $10.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 52.000 $18.000 $3.550 $15.000 $13.000
REMOVING CONC (CURB)
LF 200.000 $10.000 $1.000 $5.000 $11.000
EXCAVATION (ROADWAY)
CY 74.000 $8.750 $100.000 $40.000 $300.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 190.000 $12.000 $80.000 $60.000 $75.000
BLOCK SODDING
SY 786.000 $4.500 $18.670 $7.000 $9.500
DRILL SEEDING (TEMP) (WARM)
SY 393.000 $0.120 $7.490 $2.600 $2.550
DRILL SEEDING (TEMP) (COOL)
SY 393.000 $0.100 $7.660 $2.600 $2.550
FERTILIZER
AC 0.330 $625.000 $9,746.580 $3,100.000 $3,035.000
VEGETATIVE WATERING
MG 0.020 $18.000 $4,755.000 $5,000.000 $5,000.000
CONC PVMT (CONT REINF)(FAST TRK)(12")
SY 886.000 $115.000 $200.000 $200.000 $185.000
CONC PVMT (CONT REINF - CRCP) (6")
SY 75.000 $110.000 $200.000 $200.000 $100.000
CEM STABIL BKFL
CY 36.000 $72.000 $100.000 $100.000 $105.000
TEMPORARY SPL SHORING
SF 240.000 $16.000 $125.000 $65.000 $40.000
DRILL SHAFT (24 IN)
LF 690.000 $180.000 $275.000 $300.000 $185.000
DRILL SHAFT (36 IN)
LF 832.000 $250.000 $475.000 $600.000 $400.000
CL C CONC (ABUT)
CY 41.000 $1,000.000 $1,900.000 $2,400.000 $1,800.000
CL C CONC (CAP)
CY 83.200 $1,200.000 $2,000.000 $2,500.000 $2,000.000
CL C CONC (COLUMN)
CY 61.200 $1,300.000 $1,750.000 $2,200.000 $2,000.000
REINF CONC SLAB (SLAB BEAM)
SF 10,200.000 $23.000 $30.000 $18.000 $25.000
BRIDGE SIDEWALK
SF 2,380.000 $10.000 $12.000 $18.000 $13.000
APPROACH SLAB
CY 102.500 $520.000 $1,200.000 $1,000.000 $550.000
PRESTR CONC SLAB BEAM (4SB12)
LF 1,005.000 $195.000 $270.000 $200.000 $250.000
PRESTR CONC SLAB BEAM (5SB12)
LF 1,172.500 $200.000 $270.000 $200.000 $255.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 29.000 $450.000 $800.000 $900.000 $700.000
RAIL (TY C221)
LF 364.000 $150.000 $200.000 $200.000 $145.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 180.000 $160.000 $200.000 $200.000 $202.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $80,000.000 $300,000.000 $300,000.000 $433,000.000
MOBILIZATION
LS 1.000 $186,404.870 $111,000.000 $320,000.000 $355,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $7,600.000 $4,000.000 $1,000.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 70.000 $34.500 $53.640 $60.000 $53.640
ROCK FILTER DAMS (REMOVE)
LF 70.000 $10.000 $18.670 $12.000 $18.670
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 111.000 $25.000 $44.510 $50.000 $44.510
CONSTRUCTION EXITS (REMOVE)
SY 111.000 $6.500 $14.750 $10.000 $14.750
TEMP SEDMT CONT FENCE (INSTALL)
LF 270.000 $2.000 $9.050 $8.000 $9.050
TEMP SEDMT CONT FENCE (REMOVE)
LF 270.000 $0.500 $2.770 $0.500 $2.770
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 36.000 $3.500 $8.310 $10.000 $8.310
BIODEG EROSN CONT LOGS (REMOVE)
LF 36.000 $0.750 $3.230 $1.000 $1.000
CONSTRUCTING DETOURS
SY 496.000 $60.000 $105.000 $130.000 $125.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 390.000 $47.000 $66.000 $35.000 $50.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 40.000 $40.000 $27.000 $25.000 $60.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $62.000 $27.000 $25.000 $60.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 270.000 $8.000 $17.000 $5.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 20.000 $8.000 $23.000 $5.000 $60.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $11.000 $23.000 $5.000 $60.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 390.000 $12.000 $20.000 $7.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 40.000 $12.000 $28.000 $7.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $10.000 $28.000 $7.000 $20.000
CONC CURB (DOWEL)
LF 627.000 $8.500 $25.000 $12.000 $14.000
CONC CURB (SLOTTED)
LF 91.000 $9.000 $20.000 $13.000 $14.000
CONC SIDEWALKS (4")
SY 142.000 $55.000 $150.000 $110.000 $50.000
CURB RAMPS (TY 7)
EA 3.000 $3,000.000 $3,000.000 $1,800.000 $1,700.000
REMOVE METAL BEAM GUARD FENCE
LF 160.000 $3.000 $10.000 $10.000 $3.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,500.000 $4,350.000 $4,500.000 $3,600.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $950.000 $1,500.000 $1,500.000 $900.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
EA 1.000 $7,950.000 $9,000.000 $13,000.000 $1,000.000
CONDT (PVC) (SCH 80) (2")
LF 670.000 $12.000 $19.250 $23.000 $22.000
ELEC CONDR (NO.6) BARE
LF 670.000 $2.000 $1.900 $2.000 $2.000
GROUND BOX TY D (162922)
EA 1.000 $2,000.000 $1,275.000 $1,300.000 $1,300.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,300.000 $1,675.000 $1,700.000 $1,450.000
ALUMINUM SIGNS (TY A)
SF 6.000 $35.000 $29.000 $20.000 $22.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $625.000 $700.000 $625.000 $675.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $700.000 $875.000 $700.000 $895.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,130.000 $1,500.000 $1,100.000 $1,330.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $480.000 $650.000 $700.000 $760.000
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 466.000 $2.500 $4.000 $4.500 $4.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,246.000 $0.800 $1.650 $2.000 $1.650
WK ZN PAV MRK REMOV (W)(ARROW)
EA 8.000 $160.000 $205.000 $220.000 $205.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 4.000 $190.000 $205.000 $250.000 $225.000
WK ZN PAV MRK REMOV (Y)4"(DOT)
LF 163.000 $0.500 $4.000 $4.500 $4.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 1,756.000 $0.840 $1.650 $1.800 $1.650
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $135.000 $250.000 $275.000 $250.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $202.000 $250.000 $290.000 $285.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $150.000 $265.000 $270.000 $265.000
PAVEMENT SEALER 4"
LF 1,138.000 $0.130 $0.020 $0.030 $0.020
PAVEMENT SEALER 8"
LF 160.000 $0.250 $0.040 $0.050 $0.040
PAVEMENT SEALER 12"
LF 155.000 $0.750 $0.060 $0.070 $0.060
PAVEMENT SEALER 24"
LF 71.000 $1.750 $0.120 $0.130 $0.120
PAVEMENT SEALER (ARROW)
EA 2.000 $27.000 $20.000 $20.000 $20.000
PAVEMENT SEALER (WORD)
EA 2.000 $30.000 $20.000 $20.000 $20.000
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $35.000 $20.000 $20.000 $20.000
ELIM EXT PAV MRK & MRKS (4")
LF 380.000 $0.300 $0.750 $0.800 $0.750
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 2.000 $95.000 $45.000 $50.000 $45.000
PAV SURF PREP FOR MRK (4")
LF 1,138.000 $0.050 $0.020 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 160.000 $0.050 $0.040 $0.040 $0.040
PAV SURF PREP FOR MRK (12")
LF 155.000 $0.300 $0.080 $0.080 $0.080
PAV SURF PREP FOR MRK (24")
LF 71.000 $0.700 $0.160 $0.160 $0.160
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $10.000 $5.000 $5.000 $5.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $20.000 $5.000 $5.000 $5.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $10.000 $5.000 $5.000 $5.000
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $600.000 $975.000 $1,250.000 $1,050.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 29.000 $1.500 $2.000 $2.100 $6.000
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
LF 29.000 $1.750 $2.500 $2.600 $7.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 656.000 $3.000 $3.250 $3.500 $3.000
PED POLE ASSEMBLY
EA 2.000 $1,800.000 $2,800.000 $3,000.000 $2,780.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $775.000 $895.000 $900.000 $1,100.000
REMOVE PED POLE ASSM
EA 1.000 $700.000 $765.000 $1,000.000 $690.000
REMOVE GROUND BOX
EA 3.000 $230.000 $250.000 $300.000 $460.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $15,000.000 $22,000.000 $12,000.000 $17,704.800
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 331.000 $0.500 $3.250 $3.300 $3.250
MULTIPOLYMER PAV MRK (W)(4")(BRK)
LF 280.000 $0.950 $3.250 $3.300 $3.250
MULTIPOLYMER PAV MRK (W)(4")(DOT)
LF 91.000 $2.000 $3.500 $3.600 $3.500
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 160.000 $1.000 $4.300 $4.500 $4.300
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 166.000 $3.000 $7.000 $7.300 $7.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 71.000 $6.000 $14.000 $15.000 $14.000
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 274.000 $0.500 $3.250 $3.300 $3.250
MULTIPOLYMER PAV MRK (BLK)(4")(BRK)
LF 240.000 $0.500 $3.750 $3.800 $3.750
Totals: $2,130,053.570 $3,121,846.991 $3,277,738.240 $3,592,850.220