County: HARRIS Highway: IH 610 Date: 05/03/2024 (6 months ago) Engineer's Estimate: $2,535,943 Control Number: 0271-16-168
Project: F 2B24(027) District: HOUSTON Time: 32 WORKING DAYS Type: REHABILITATE BRIDGE
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,535,942.87
ISI CONTRACTING, INC.   $1,546,772.65 1
-39.01% | -$989,170.22
MC2 CIVIL, LLC   $1,550,500.38 2
-38.86% | -$985,442.49
0.24% | $3,727.73
RAGLE CONSTRUCTION, INC.   $1,636,335.38 3
-35.47% | -$899,607.49
5.79% | $89,562.73
5.54% | $85,835.00
MB WESTERN INDUSTRIAL CONTRACTING CO.   $2,434,111.40 4
-4.02% | -$101,831.47
57.37% | $887,338.75
48.75% | $797,776.02

Bid Items

Items: 40, 0 filtered
HARRIS IH 610  |  HOUSTON  |  0271-16-168  |  05/03/2024  |  $2,535,943  |  F 2B24(027)  |  REHAB BRIDGE  |  32 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ISI CONTRACTING, INC. MC2 CIVIL, LLC RAGLE CONSTRUCTION, INC. MB WESTERN INDUSTRIAL CONTRACTING CO.
104 6027 REMOVING CONC (APPR SLAB) SY 756.000 $19.000 $25.000 $200.000 $100.000 $105.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 1,060.000 $8.990 $8.000 $20.000 $7.600 $20.000
422 6015 APPROACH SLAB CY 152.000 $713.000 $3,000.000 $2,500.000 $4,150.000 $1,000.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 10.000 $266.670 $150.000 $200.000 $250.000 $355.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 35.000 $572.510 $491.000 $1,500.000 $717.000 $760.000
438 6007 CLEANING AND SEALING JOINTS (CL 5) LF 200.000 $31.160 $115.000 $50.000 $48.000 $80.000
500 6001 MOBILIZATION LS 1.000 $186,943.230 $150,000.000 $225,000.000 $160,000.000 $400,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $11,172.000 $8,200.000 $75,000.000 $78,400.000 $20,000.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $2,032.400 $2,500.000 $3,000.000 $2,000.000 $3,000.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 938.000 $5.200 $9.000 $15.000 $1.000 $10.000
658 6067 INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2 EA 34.000 $8.000 $17.000 $50.000 $40.000 $50.000
658 6068 INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2 EA 4.000 $17.330 $83.000 $50.000 $40.000 $50.000
662 6052 WK ZN PAV MRK REMOV (REFL) TY II-C-R EA 150.000 $6.010 $0.010 $6.000 $6.000 $10.000
662 6064 WK ZN PAV MRK REMOV (W)6"(BRK) LF 3,000.000 $2.000 $0.010 $1.350 $1.350 $2.000
662 6067 WK ZN PAV MRK REMOV (W)6"(SLD) LF 4,075.000 $1.570 $0.010 $1.350 $1.350 $2.000
662 6098 WK ZN PAV MRK REMOV (Y)6"(SLD) LF 4,000.000 $1.530 $0.010 $1.350 $1.350 $2.000
666 6193 REFL PAV MRK TY II (W) (ENTR GORE) EA 4.000 $450.000 $983.000 $340.000 $340.000 $550.000
666 6194 REFL PAV MRK TY II (W) (EXIT GORE) EA 4.000 $450.000 $983.000 $360.000 $360.000 $600.000
672 6010 REFL PAV MRKR TY II-C-R EA 723.000 $6.510 $9.000 $6.000 $6.000 $10.000
677 6002 ELIM EXT PAV MRK & MRKS (6") LF 64,757.000 $0.670 $1.400 $0.340 $0.340 $0.500
677 6005 ELIM EXT PAV MRK & MRKS (12") LF 605.000 $1.930 $3.600 $1.650 $1.650 $2.500
677 6013 ELIM EXT PAV MRK & MRKS (ENTR GORE) EA 4.000 $153.750 $983.300 $790.000 $787.810 $1,280.000
677 6014 ELIM EXT PAV MRK & MRKS (EXIT GORE) EA 4.000 $153.750 $983.300 $970.000 $968.690 $1,600.000
678 6002 PAV SURF PREP FOR MRK (6") LF 64,757.000 $0.070 $0.400 $0.020 $0.020 $0.200
678 6006 PAV SURF PREP FOR MRK (12") LF 605.000 $0.200 $0.900 $0.040 $0.040 $0.700
678 6017 PAV SURF PREP FOR MRK (ENTR GORE) EA 4.000 $47.000 $174.000 $100.000 $100.000 $165.000
678 6018 PAV SURF PREP FOR MRK (EXIT GORE) EA 4.000 $47.250 $174.000 $100.000 $100.000 $165.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 938.000 $23.330 $26.000 $25.000 $21.000 $75.000
770 6011 REM / REPL TIMBER / STL POST W/CONC FND EA 34.000 $72.500 $124.000 $50.000 $65.000 $120.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 2.000 $2,883.330 $2,533.000 $4,500.000 $3,500.000 $7,500.000
778 6075 CONC RAIL REPAIR(REMOVE AND REPL RAIL) LF 830.000 $1,618.750 $50.000 $200.000 $50.000 $1,350.000
785 6010 BRIDGE JOINT REPLACEMENT (ARMOR) LF 544.000 $486.670 $300.000 $150.000 $291.000 $300.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 500.000 $560.000 $215.000 $25.000 $67.000 $50.000
6038 6004 MULTIPOLYMER PAV MRK (W)(6")(SLD) LF 18,501.000 $1.640 $2.100 $0.880 $0.880 $1.500
6038 6005 MULTIPOLYMER PAV MRK (W)(6")(BRK) LF 13,875.000 $1.890 $2.300 $0.880 $0.880 $1.500
6038 6011 MULTIPOLYMER PAV MRK (W)(12")(SLD) LF 605.000 $5.000 $4.100 $6.000 $6.000 $10.000
6038 6017 MULTIPOLYMER PAV MRK (Y)(6")(SLD) LF 18,506.000 $1.590 $2.300 $0.880 $0.880 $1.500
6038 6024 MULTIPOLYMER PAV MRK (BLK)(6")(BRK) LF 13,875.000 $1.550 $1.200 $0.880 $0.880 $1.500
6185 6002 TMA (STATIONARY) DAY 256.000 $115.000 $650.000 $100.000 $333.000 $200.000
6185 6003 TMA (MOBILE OPERATION) HR 200.000 $20.000 $200.000 $100.000 $79.000 $20.000
Totals: $2,535,942.87 $1,546,772.65 $1,550,500.38 $1,636,335.38 $2,434,111.40