PREPARING ROW
|
STA
|
87.520
|
$20,000.000
|
$457,038.410
|
$520,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
146,944.000
|
$12.000
|
$1.190
|
$15.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
23,897.000
|
$15.000
|
$1.070
|
$8.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
15.000
|
$11.000
|
$4.430
|
$300.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
2,980.000
|
$8.000
|
$1.910
|
$9.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
3,330.000
|
$6.000
|
$1.760
|
$3.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
3,686.000
|
$14.000
|
$8.330
|
$12.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
4,621.000
|
$60.000
|
$31.850
|
$300.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
604.000
|
$10.000
|
$2.750
|
$120.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
8.000
|
$25.000
|
$5.840
|
$120.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
14,087.000
|
$11.000
|
$15.670
|
$17.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
3,037.000
|
$25.000
|
$2.640
|
$35.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
1,109.000
|
$30.000
|
$2.330
|
$30.000
|
|
|
REMOVE HOV TRAFFIC GATE
|
EA
|
3.000
|
$2,000.000
|
$5,000.000
|
$3,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
146,944.000
|
$0.890
|
$4.570
|
$9.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
53,412.000
|
$25.000
|
$15.710
|
$25.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
528,844.000
|
$25.000
|
$15.480
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
88,278.000
|
$40.000
|
$26.540
|
$25.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
33,689.000
|
$50.000
|
$61.930
|
$70.000
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
5,334.000
|
$60.000
|
$62.540
|
$80.000
|
|
|
EROSION CONTROL COMPOST
|
CY
|
560.000
|
$22.000
|
$72.800
|
$50.000
|
|
|
BLOCK SODDING
|
SY
|
98,332.000
|
$6.400
|
$4.470
|
$3.750
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
49,169.000
|
$0.300
|
$0.220
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
3,673.000
|
$60.000
|
$70.410
|
$28.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
51,921.000
|
$4.300
|
$3.960
|
$4.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
698.000
|
$310.000
|
$345.560
|
$450.000
|
|
|
CEM TRT(PLNT MX) (CL L)(TY A)(GR 4)(6")
|
SY
|
21,374.000
|
$53.000
|
$30.200
|
$30.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
52,437.000
|
$14.000
|
$21.160
|
$10.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
3,210.320
|
$118.000
|
$172.800
|
$105.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
687.000
|
$70.000
|
$92.020
|
$95.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
18,336.000
|
$70.000
|
$96.500
|
$100.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
8,317.000
|
$75.000
|
$104.420
|
$75.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (14")
|
SY
|
31,688.000
|
$80.000
|
$119.090
|
$100.000
|
|
|
CONC PAV (JOINT REINF) (6")
|
SY
|
17,912.000
|
$65.000
|
$73.280
|
$50.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
34.000
|
$120.000
|
$400.000
|
$1,500.000
|
|
|
STRUCT EXCAV
|
CY
|
5,334.000
|
$60.000
|
$26.790
|
$30.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
20,614.000
|
$11.000
|
$4.600
|
$5.250
|
|
|
CEM STABIL BKFL
|
CY
|
9,659.000
|
$85.000
|
$62.070
|
$78.400
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
12,754.000
|
$6.000
|
$7.290
|
$11.350
|
|
|
TEMPORARY SPL SHORING
|
SF
|
394,416.000
|
$17.000
|
$22.360
|
$40.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
13,962.000
|
$32.000
|
$18.590
|
$30.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
196.000
|
$138.000
|
$81.800
|
$150.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
6,461.000
|
$272.000
|
$218.080
|
$230.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
9,020.000
|
$252.000
|
$225.220
|
$330.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
520.000
|
$365.000
|
$510.000
|
$430.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
8,279.000
|
$396.000
|
$460.590
|
$630.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
11,236.000
|
$593.000
|
$531.760
|
$730.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
3,159.000
|
$566.000
|
$687.960
|
$830.000
|
|
|
DRILL SHAFT (66 IN)
|
LF
|
340.000
|
$604.000
|
$741.670
|
$930.000
|
|
|
DRILL SHAFT (72 IN)
|
LF
|
47,220.000
|
$700.000
|
$852.070
|
$900.000
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
6,639.000
|
$1,250.000
|
$1,073.610
|
$1,500.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
75.000
|
$623.000
|
$590.000
|
$590.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
300.000
|
$872.000
|
$690.000
|
$690.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
48.000
|
$339.000
|
$320.000
|
$320.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (42 IN)
|
LF
|
34.000
|
$302.000
|
$430.000
|
$430.000
|
|
|
CL B CONC (FLUME)
|
CY
|
77.000
|
$1,000.000
|
$440.120
|
$700.000
|
|
|
CL C CONC (ABUT)
|
CY
|
523.300
|
$1,200.000
|
$1,874.360
|
$1,700.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
21,198.500
|
$1,200.000
|
$1,385.850
|
$1,800.000
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
5,458.900
|
$1,710.000
|
$800.150
|
$1,100.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
34.000
|
$1,200.000
|
$676.290
|
$500.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
759.900
|
$1,400.000
|
$1,093.540
|
$1,500.000
|
|
|
CL C CONC (MISC)
|
CY
|
3.200
|
$1,375.000
|
$1,352.090
|
$6,000.000
|
|
|
CL F CONC (CAP)(MASS)
|
CY
|
399.200
|
$850.000
|
$1,420.130
|
$1,700.000
|
|
|
CL F CONC (FOOTING)(MASS)
|
CY
|
3,400.900
|
$1,300.000
|
$1,050.640
|
$1,700.000
|
|
|
CL H CONC (PT CAP)(MASS)
|
CY
|
510.500
|
$850.000
|
$1,149.440
|
$2,000.000
|
|
|
CL C CONC (SIGN FOOTING)
|
CY
|
156.600
|
$1,171.000
|
$1,242.420
|
$1,500.000
|
|
|
CL F CONC (CAP)(INVT)
|
CY
|
7,306.900
|
$1,200.000
|
$933.690
|
$1,000.000
|
|
|
CL F CONC (CAP)(INVT)(MASS)
|
CY
|
20,233.200
|
$1,200.000
|
$887.470
|
$1,200.000
|
|
|
CL F CONC (CAP)(STRDL)
|
CY
|
142.300
|
$1,200.000
|
$1,950.160
|
$2,000.000
|
|
|
CL F CONC (CAP)(CBNT)(MASS)
|
CY
|
111.400
|
$1,200.000
|
$2,249.120
|
$1,700.000
|
|
|
REINF CONC SLAB
|
SF
|
1,884,129.000
|
$26.000
|
$25.680
|
$20.000
|
|
|
BRIDGE MEDIAN
|
SF
|
11,960.000
|
$14.000
|
$12.300
|
$15.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
25,918.000
|
$28.000
|
$11.300
|
$20.000
|
|
|
RETAINING WALL (MSE)(HORIZONTAL SCHEME)
|
SF
|
67,007.000
|
$54.000
|
$48.900
|
$70.000
|
|
|
RET WALL (SOIL NAILED)(FASCIA)(HOR SCH)
|
SF
|
5,402.000
|
$76.000
|
$99.680
|
$60.000
|
|
|
RET WALL(DS)(FASCIA)(HORIZ SCH)
|
SF
|
19,350.000
|
$75.000
|
$95.760
|
$80.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,656.100
|
$218.000
|
$215.100
|
$125.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
5,507.190
|
$206.000
|
$211.190
|
$135.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,773.650
|
$90.000
|
$209.410
|
$145.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
2,309.800
|
$110.000
|
$201.260
|
$150.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
229,597.980
|
$115.000
|
$195.390
|
$155.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
5,329.840
|
$130.000
|
$203.200
|
$170.000
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
1,390.240
|
$300.000
|
$217.500
|
$195.000
|
|
|
CONC STR REPR(REMOVE AND REPL PEDESTAL)
|
CY
|
1.310
|
$300.000
|
$5,000.000
|
$50,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
205.720
|
$600.000
|
$341.090
|
$700.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1,995.000
|
$605.000
|
$275.070
|
$700.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
463.000
|
$670.000
|
$275.070
|
$700.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
18.000
|
$550.000
|
$584.900
|
$700.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
690.360
|
$467.000
|
$341.090
|
$700.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
281.400
|
$650.000
|
$379.600
|
$700.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
183.000
|
$590.000
|
$418.110
|
$1,500.000
|
|
|
STR STEEL (ROLLED BEAM)
|
LB
|
71,450.000
|
$2.400
|
$3.960
|
$4.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
2,655.000
|
$23.000
|
$22.480
|
$10.000
|
|
|
STR STEEL (DIAPHRAGM & STIFFENER)
|
LB
|
5,172.000
|
$2.400
|
$8.480
|
$4.000
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
411.000
|
$2.400
|
$30.390
|
$4.000
|
|
|
STR STEEL (MULTI GIRDER PLATE CAP)
|
LB
|
843,900.000
|
$2.400
|
$3.590
|
$4.000
|
|
|
RAIL (TY T223)
|
LF
|
278.800
|
$166.000
|
$128.180
|
$95.000
|
|
|
RAIL (TY SSTR)
|
LF
|
33,658.200
|
$55.000
|
$50.840
|
$55.000
|
|
|
RAIL (TY C221)
|
LF
|
1,481.800
|
$94.000
|
$92.710
|
$160.000
|
|
|
RAIL (TY C223)
|
LF
|
265.800
|
$206.000
|
$163.810
|
$170.000
|
|
|
RAIL (HANDRAIL)(TY D)
|
LF
|
2,075.000
|
$126.000
|
$104.750
|
$200.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
1,456.000
|
$125.000
|
$124.750
|
$200.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
2,012.700
|
$51.000
|
$55.820
|
$55.000
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
23,456.900
|
$150.000
|
$144.280
|
$300.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS) (MOD)
|
LF
|
1,350.400
|
$83.000
|
$144.320
|
$300.000
|
|
|
RAIL (TY T222)(MOD)
|
LF
|
20.700
|
$197.000
|
$257.470
|
$300.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
315.000
|
$249.000
|
$91.530
|
$300.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
7,687.500
|
$214.000
|
$262.720
|
$200.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
16.000
|
$178.000
|
$138.300
|
$331.050
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
46.000
|
$486.000
|
$427.910
|
$537.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
1,108.000
|
$664.000
|
$489.850
|
$583.450
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,212.000
|
$118.000
|
$86.760
|
$157.450
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
5,307.000
|
$128.000
|
$100.280
|
$166.100
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,108.000
|
$156.000
|
$109.990
|
$161.900
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,421.000
|
$160.000
|
$151.760
|
$231.200
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
1,322.000
|
$275.000
|
$190.810
|
$289.350
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
255.000
|
$306.000
|
$214.270
|
$342.550
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
487.000
|
$366.000
|
$317.330
|
$414.750
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
155.000
|
$140.000
|
$114.570
|
$398.900
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
268.000
|
$175.000
|
$122.050
|
$228.550
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
122.000
|
$225.000
|
$125.980
|
$292.950
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
661.000
|
$300.000
|
$180.630
|
$353.900
|
|
|
RC PIPE (CL IV)(42 IN)
|
LF
|
21.000
|
$350.000
|
$293.320
|
$998.050
|
|
|
RC PIPE (CL IV)(48 IN)
|
LF
|
140.000
|
$400.000
|
$318.270
|
$637.400
|
|
|
RC PIPE (CL IV) (60 IN)
|
LF
|
146.000
|
$550.000
|
$461.720
|
$783.150
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
14.000
|
$4,417.000
|
$7,090.180
|
$6,340.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
2.000
|
$5,869.000
|
$7,764.010
|
$6,728.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX5FT)
|
EA
|
2.000
|
$8,784.000
|
$8,415.010
|
$8,178.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$8,197.000
|
$10,745.030
|
$10,133.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX6FT)
|
EA
|
5.000
|
$13,971.000
|
$11,981.140
|
$12,005.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX6FT)
|
EA
|
3.000
|
$10,502.000
|
$13,114.610
|
$13,758.000
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
2.000
|
$11,671.000
|
$32,763.280
|
$30,309.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
16.000
|
$9,282.000
|
$12,536.910
|
$9,994.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
6.000
|
$6,757.000
|
$12,699.600
|
$11,623.000
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
46.000
|
$7,720.000
|
$12,131.570
|
$9,959.000
|
|
|
INLET (COMPL)(TY AZR)
|
EA
|
25.000
|
$9,243.000
|
$12,834.540
|
$10,906.000
|
|
|
INLET (COMPL)(TY AZR2G)
|
EA
|
3.000
|
$10,756.000
|
$15,055.880
|
$12,175.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
47.000
|
$9,019.000
|
$16,559.300
|
$10,025.000
|
|
|
MANH (COMPL)(TY B)
|
EA
|
2.000
|
$15,397.000
|
$31,572.630
|
$16,193.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
40.000
|
$7,083.000
|
$11,161.730
|
$10,916.000
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
5.000
|
$9,127.000
|
$18,028.840
|
$18,714.000
|
|
|
INLET (COMPL)(TY AZ2G)
|
EA
|
5.000
|
$10,290.000
|
$10,605.440
|
$11,542.000
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
41.000
|
$1,704.000
|
$3,695.250
|
$1,694.000
|
|
|
INLET (COMPL) (EXT) (TY CI)
|
EA
|
4.000
|
$1,260.000
|
$4,648.880
|
$1,694.000
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
1.000
|
$19,006.000
|
$26,263.600
|
$57,893.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
4.000
|
$9,500.000
|
$7,163.530
|
$11,672.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,066.000
|
$1,839.610
|
$1,007.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,329.000
|
$1,946.550
|
$1,107.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,983.000
|
$2,288.790
|
$1,503.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,404.000
|
$3,869.800
|
$3,266.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$13,000.000
|
$4,361.760
|
$3,942.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$5,045.000
|
$6,376.290
|
$4,780.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$6,272.000
|
$6,284.810
|
$7,135.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$7,304.000
|
$10,336.980
|
$7,490.000
|
|
|
SET (TY II) (54 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$9,951.000
|
$12,301.850
|
$14,507.000
|
|
|
SET (TY II) (60 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$12,500.000
|
$25,016.980
|
$18,309.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
154.000
|
$4,565.000
|
$4,581.000
|
$6,000.000
|
|
|
ADJUSTING MANHOLES(CAP)
|
EA
|
1.000
|
$400.000
|
$4,895.090
|
$4,250.000
|
|
|
PIPE (PVC) (SCH 40) (8 IN)
|
LF
|
8,780.000
|
$60.000
|
$130.510
|
$60.000
|
|
|
REMOV STR (INLET)
|
EA
|
82.000
|
$760.000
|
$2,530.220
|
$471.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
23.000
|
$853.000
|
$2,209.080
|
$709.000
|
|
|
REMOV STR (PIPE)
|
LF
|
21,192.000
|
$23.000
|
$36.620
|
$26.050
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$60,516.000
|
$46,988.750
|
$25,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
5.000
|
$68,428.000
|
$80,058.390
|
$150,000.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
3.000
|
$300,000.000
|
$206,810.350
|
$400,000.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$100,000.000
|
$1,073,492.290
|
$4,500,000.000
|
|
|
REMOVE STR (BRIDGE)
|
LF
|
4,636.000
|
$523.000
|
$529.040
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$31,068,913.000
|
$40,000,000.000
|
$50,120,677.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
53.000
|
$20,000.000
|
$1,354.020
|
$30,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
421.000
|
$79.000
|
$35.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
421.000
|
$32.000
|
$15.000
|
$17.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,792.000
|
$35.000
|
$30.000
|
$39.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,792.000
|
$7.000
|
$15.000
|
$13.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
3,618.000
|
$3.900
|
$9.130
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
26,564.000
|
$3.400
|
$3.500
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
31,804.000
|
$1.300
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,072.000
|
$5.900
|
$5.500
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,879.000
|
$6.000
|
$7.500
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,951.000
|
$1.800
|
$2.000
|
$3.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
5,240.000
|
$6.300
|
$4.000
|
$13.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,028.000
|
$111.000
|
$194.380
|
$185.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
32,032.700
|
$67.000
|
$86.040
|
$50.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
5,040.000
|
$48.000
|
$85.710
|
$40.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
320.000
|
$57.000
|
$95.030
|
$40.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
90,450.000
|
$6.700
|
$9.780
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
10,680.000
|
$6.500
|
$15.600
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
800.000
|
$7.400
|
$23.730
|
$5.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
30,030.000
|
$17.000
|
$10.560
|
$6.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
5,040.000
|
$14.000
|
$16.670
|
$5.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
320.000
|
$16.000
|
$23.630
|
$5.000
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
7,713.000
|
$56.000
|
$96.680
|
$65.000
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
7,390.000
|
$20.000
|
$10.570
|
$5.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
6,435.000
|
$67.000
|
$70.400
|
$80.000
|
|
|
PERM CTB (SGL SLOPE) (TY 2) (42 )
|
LF
|
279.000
|
$200.000
|
$70.400
|
$85.000
|
|
|
PERM CONC TRF BARR (SGL SLP) (TY 3 SPL)
|
LF
|
123.000
|
$75.000
|
$339.630
|
$230.000
|
|
|
PERM CTB (TRAN SSCB TO CTB) (MOD)
|
LF
|
30.000
|
$200.000
|
$446.690
|
$530.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) SPECIAL
|
LF
|
103.000
|
$200.000
|
$585.640
|
$530.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
2,092.000
|
$153.000
|
$105.700
|
$95.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
6,916.000
|
$7.300
|
$3.400
|
$8.120
|
|
|
CONC CURB (U-TURN)
|
LF
|
455.000
|
$55.000
|
$81.210
|
$50.560
|
|
|
CONC CURB (DOWEL)
|
LF
|
2,197.000
|
$13.000
|
$25.370
|
$10.550
|
|
|
CONC SIDEWALKS (5")
|
SY
|
1,932.000
|
$177.000
|
$47.310
|
$90.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
5.000
|
$2,295.000
|
$2,035.540
|
$2,600.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
1.000
|
$2,544.000
|
$2,145.570
|
$3,200.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$3,300.000
|
$2,970.790
|
$3,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
6.000
|
$2,351.000
|
$2,035.540
|
$2,800.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
7.000
|
$2,373.000
|
$2,035.540
|
$2,800.000
|
|
|
CONC MEDIAN
|
LF
|
455.000
|
$20.000
|
$242.060
|
$115.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
962.500
|
$36.000
|
$27.260
|
$29.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
21.000
|
$2,076.000
|
$2,438.000
|
$2,412.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
7.000
|
$1,854.000
|
$1,255.000
|
$1,110.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,794.000
|
$5.000
|
$2.300
|
$4.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
17.000
|
$262.000
|
$200.000
|
$255.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,390.000
|
$3,200.000
|
$2,785.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$335.000
|
$200.000
|
$530.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
26.000
|
$2,417.000
|
$3,124.000
|
$2,550.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
12.000
|
$1,436.000
|
$1,500.000
|
$835.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
2.000
|
$20,900.000
|
$32,650.000
|
$27,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
16.000
|
$24,116.000
|
$28,300.000
|
$28,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
3.000
|
$25,350.000
|
$54,600.000
|
$44,900.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
597.000
|
$27.000
|
$36.730
|
$32.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
121.000
|
$1,123.000
|
$1,350.000
|
$1,350.000
|
|
|
HI MST IL POLE (100 FT)(100 MPH)
|
EA
|
12.000
|
$36,570.000
|
$37,000.000
|
$37,300.000
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
12.000
|
$32,197.000
|
$34,600.000
|
$34,600.000
|
|
|
CONDT (PVC) (SCH 40) (1") (BORE)
|
LF
|
1,013.000
|
$22.000
|
$12.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
245.000
|
$11.000
|
$15.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
33,274.000
|
$12.000
|
$14.000
|
$14.000
|
|
|
CONDT (PVC) (SCH 40) (3") (STL ENCSE)
|
LF
|
5,060.000
|
$46.000
|
$85.000
|
$85.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
14,079.000
|
$14.000
|
$12.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
5,545.000
|
$15.000
|
$14.000
|
$14.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,650.000
|
$22.000
|
$19.000
|
$19.000
|
|
|
CONDT (RM) (2")
|
LF
|
6,660.000
|
$26.000
|
$28.000
|
$28.000
|
|
|
CONDT (RM) (3")
|
LF
|
4,865.000
|
$54.000
|
$49.000
|
$49.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
24,781.000
|
$0.770
|
$1.200
|
$1.200
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
1,700.000
|
$1.200
|
$1.400
|
$1.400
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
3,400.000
|
$1.300
|
$1.250
|
$1.250
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
3,205.000
|
$1.300
|
$1.400
|
$1.400
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
6,410.000
|
$1.400
|
$1.600
|
$1.600
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
18,686.000
|
$1.800
|
$1.750
|
$1.750
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
33,612.000
|
$1.700
|
$1.800
|
$1.800
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,127.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
3,194.000
|
$1.900
|
$2.100
|
$2.100
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
3,556.000
|
$2.700
|
$2.750
|
$2.750
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
7,902.000
|
$2.900
|
$3.000
|
$3.000
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
4,784.000
|
$3.000
|
$3.200
|
$3.200
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
13,969.000
|
$3.100
|
$3.800
|
$3.800
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
49.000
|
$1,110.000
|
$888.000
|
$888.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
113.000
|
$1,276.000
|
$999.000
|
$999.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
2.000
|
$392.000
|
$350.000
|
$650.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$8,363.000
|
$8,000.000
|
$8,300.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$6,246.000
|
$8,000.000
|
$8,300.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
1.000
|
$6,375.000
|
$8,000.000
|
$8,300.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
1.000
|
$5,834.000
|
$8,200.000
|
$8,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
150.000
|
$36.000
|
$82.100
|
$74.670
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
4,024.250
|
$28.000
|
$24.000
|
$24.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
16.000
|
$628.000
|
$433.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
35.000
|
$768.000
|
$598.700
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
5.000
|
$1,030.000
|
$526.000
|
$670.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,246.000
|
$709.500
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
2.000
|
$1,023.000
|
$969.000
|
$940.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(T-2EXT)
|
EA
|
1.000
|
$1,624.000
|
$1,823.900
|
$1,910.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
92.000
|
$131.000
|
$55.000
|
$130.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
9.000
|
$525.000
|
$756.630
|
$450.000
|
|
|
IN SRSS & AM (RAIL)(90 MPH)(P MOUNT)
|
EA
|
18.000
|
$4,484.000
|
$3,501.500
|
$2,960.000
|
|
|
IN SRSS & AM (RAIL)(90 MPH)(T MOUNT)
|
EA
|
57.000
|
$5,311.000
|
$3,676.000
|
$3,085.000
|
|
|
IN SRSS & AM (RAIL)(90 MPH)(U MOUNT)
|
EA
|
3.000
|
$9,500.000
|
$3,660.000
|
$3,160.000
|
|
|
INS OH SN SUP(20 FT CANT)
|
EA
|
1.000
|
$23,997.000
|
$71,400.000
|
$71,400.000
|
|
|
INS OH SN SUP(25 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$23,613.000
|
$32,000.000
|
$32,000.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
1.000
|
$12,382.000
|
$77,200.000
|
$77,200.000
|
|
|
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
|
EA
|
3.000
|
$23,985.000
|
$36,600.000
|
$36,600.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
2.000
|
$43,181.000
|
$79,400.000
|
$79,400.000
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$26,889.000
|
$43,500.000
|
$43,500.000
|
|
|
INS OH SN SUP(40 FT BRDG)
|
EA
|
1.000
|
$45,945.000
|
$147,800.000
|
$147,800.000
|
|
|
INS OH SN SUP(45 FT BRDG)
|
EA
|
1.000
|
$50,000.000
|
$149,800.000
|
$149,800.000
|
|
|
INS OH SN SUP(45 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$40,000.000
|
$55,500.000
|
$55,500.000
|
|
|
INS OH SN SUP(85 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$75,921.000
|
$97,500.000
|
$97,500.000
|
|
|
INS OH SN SUP(90 FT BRDG)
|
EA
|
1.000
|
$60,100.000
|
$190,200.000
|
$190,200.000
|
|
|
INS OH SN SUP(105 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$106,631.000
|
$130,200.000
|
$130,200.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
12.000
|
$3,451.000
|
$3,500.000
|
$8,791.000
|
|
|
INS OH SN SUP(45 FT CANT)
|
EA
|
1.000
|
$45,000.000
|
$85,400.000
|
$85,400.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
94.000
|
$14.000
|
$7.500
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
353.000
|
$18.000
|
$7.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
38.000
|
$8.000
|
$22.000
|
$34.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
9,182.000
|
$0.390
|
$0.890
|
$0.890
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
22,548.000
|
$0.420
|
$0.750
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
3,096.000
|
$0.770
|
$1.150
|
$1.150
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
15,989.000
|
$0.420
|
$0.750
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
60,251.000
|
$2.000
|
$1.200
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
139,518.000
|
$1.600
|
$0.810
|
$0.810
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
24,515.000
|
$2.400
|
$2.500
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
133,788.000
|
$1.600
|
$0.810
|
$0.810
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(DOT)
|
LF
|
145.000
|
$2.100
|
$1.700
|
$1.700
|
|
|
WK ZN PAV MRK REMOV (W)12"(DOT)
|
LF
|
3,365.000
|
$2.600
|
$5.100
|
$5.100
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
46.000
|
$550.000
|
$400.000
|
$400.000
|
|
PREFAB PAV MRK TY B (W)(DBL ARROW)
|
EA
|
5.000
|
$925.000
|
$526.000
|
$526.000
|
|
PREFAB PAV MRK TY B (W)(U-LT ARROW)
|
EA
|
2.000
|
$900.000
|
$689.000
|
$689.000
|
|
PREFAB PAV MRK TY B (W)(NUMBER)
|
EA
|
6.000
|
$550.000
|
$600.000
|
$600.000
|
|
PREFAB PAV MRK TY B (W)(WORD)
|
EA
|
40.000
|
$798.000
|
$567.000
|
$567.000
|
|
PREFAB PAV MRK TY C (W) (SYMBOL)
|
EA
|
14.000
|
$93.000
|
$189.000
|
$189.000
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
14.000
|
$1,950.000
|
$3,800.000
|
$3,800.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2.000
|
$6.800
|
$5.700
|
$5.700
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,119.000
|
$6.900
|
$5.450
|
$5.450
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
91,907.000
|
$0.600
|
$0.390
|
$0.390
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,758.000
|
$0.930
|
$0.780
|
$0.780
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
601.000
|
$1.300
|
$1.850
|
$1.850
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
26.000
|
$50.000
|
$44.000
|
$44.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
6.000
|
$65.000
|
$61.000
|
$61.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
520,210.000
|
$0.070
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
41,543.000
|
$0.090
|
$0.070
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
10,508.000
|
$0.200
|
$0.310
|
$0.310
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
335.000
|
$0.500
|
$0.530
|
$0.530
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
46.000
|
$5.000
|
$13.000
|
$13.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
5.000
|
$10.000
|
$18.250
|
$18.250
|
|
|
PAV SURF PREP FOR MRK (U/LT ARROW)
|
EA
|
2.000
|
$18.000
|
$18.250
|
$18.250
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
6.000
|
$10.000
|
$15.250
|
$15.250
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
40.000
|
$15.000
|
$15.250
|
$15.250
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
14.000
|
$13.000
|
$18.250
|
$18.250
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
14.000
|
$20.000
|
$57.000
|
$57.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
2.000
|
$41,610.000
|
$42,500.000
|
$42,500.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
21.000
|
$3,361.000
|
$400.000
|
$2,900.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$53,542.000
|
$160,000.000
|
$160,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
26.000
|
$258.000
|
$265.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
9.000
|
$254.000
|
$265.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
26.000
|
$300.000
|
$265.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
9.000
|
$254.000
|
$265.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
26.000
|
$258.000
|
$265.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
12.000
|
$252.000
|
$265.000
|
$265.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
4.000
|
$773.000
|
$750.000
|
$750.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
18.000
|
$154.000
|
$220.000
|
$220.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
14.000
|
$134.000
|
$180.000
|
$180.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
9,210.000
|
$1.900
|
$1.900
|
$1.900
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
9,242.000
|
$2.300
|
$2.650
|
$2.650
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
13,021.000
|
$3.100
|
$3.000
|
$3.000
|
|
|
TRF SIG CBL (TY A)(18 AWG)(2 CONDR)
|
LF
|
105.000
|
$2.400
|
$8.000
|
$8.000
|
|
|
TRF SIG CBL (TY A)(18 AWG)(3 CONDR)
|
LF
|
3,830.000
|
$3.000
|
$2.750
|
$2.750
|
|
|
TRF SIG CBL (TY B)(12 AWG)(9 CONDR)
|
LF
|
194.000
|
$2.400
|
$8.000
|
$8.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
1.000
|
$10,703.000
|
$11,000.000
|
$11,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
2.000
|
$12,500.000
|
$12,500.000
|
$12,500.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-32')
|
EA
|
2.000
|
$14,000.000
|
$17,000.000
|
$17,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
5.000
|
$2,637.000
|
$2,900.000
|
$2,900.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
4.000
|
$800.000
|
$1,000.000
|
$1,000.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
3.000
|
$3,168.000
|
$3,000.000
|
$3,000.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
15.000
|
$2,516.000
|
$4,500.000
|
$4,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
15.000
|
$2,046.000
|
$4,000.000
|
$3,000.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
53.000
|
$2,808.000
|
$2,500.000
|
$4,500.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
53.000
|
$1,517.000
|
$3,000.000
|
$4,500.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
CYC
|
53.000
|
$2,202.000
|
$2,300.000
|
$4,500.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
53.000
|
$2,371.000
|
$3,500.000
|
$3,000.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
53.000
|
$2,384.000
|
$3,000.000
|
$3,200.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
53.000
|
$1,391.000
|
$3,500.000
|
$3,000.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
53.000
|
$1,741.000
|
$3,000.000
|
$1,800.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
69,867.000
|
$1.200
|
$0.750
|
$1.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
0.200
|
$2,000.000
|
$4,951.750
|
$153,300.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
300.000
|
$100.000
|
$401.430
|
$235.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
300.000
|
$200.000
|
$67.500
|
$150.000
|
|
|
TREATMENT FOR ASR-AFFECTED STRUCTURES
|
SF
|
12,000.000
|
$15.000
|
$15.000
|
$30.000
|
|
|
TREE PROTECTION
|
EA
|
20.000
|
$1,128.000
|
$399.530
|
$1,600.000
|
|
|
TREE PROTECTION
|
AC
|
1.000
|
$18,214.000
|
$6,020.310
|
$38,000.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
892.000
|
$558.000
|
$803.600
|
$250.000
|
|
|
INTRLCK ART CONC BLKS (6" MIN)
|
SF
|
1,240,726.000
|
$3.000
|
$7.350
|
$7.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
237.000
|
$6,000.000
|
$7,126.950
|
$8,000.000
|
|
|
ORNAMENTAL STEEL FENCE
|
LF
|
1,089.500
|
$3,000.000
|
$300.000
|
$145.000
|
|
|
ASBESTOS ABATEMENT (COATINGS)
|
SF
|
10,200.000
|
$30.000
|
$14.300
|
$14.300
|
|
|
PATCHING MILLED CONCRETE RUMBLE STRIPS
|
LF
|
4,276.000
|
$17.000
|
$27.000
|
$36.000
|
|
|
LEAD CONTAINING COATING MANAGEMENT
|
SF
|
17,125.000
|
$100.000
|
$1.000
|
$92.260
|
|
|
REMOVE UNDERGROUND CONDUIT
|
LF
|
4,234.000
|
$9.000
|
$2.000
|
$2.000
|
|
|
REMOVE GROUND BOX
|
EA
|
41.000
|
$543.000
|
$150.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,388.000
|
$75.000
|
$200.000
|
$10.000
|
|
|
COMM CABLE (UNDRGRND)(22 AWG)(6 PAIR)
|
LF
|
1,742.000
|
$4.000
|
$5.000
|
$5.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
|
LF
|
23,149.000
|
$2.100
|
$4.500
|
$4.500
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
47,325.000
|
$4.100
|
$5.000
|
$5.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
864.000
|
$45.000
|
$65.000
|
$65.000
|
|
|
ITS GRND MNT CAB (TY 4) (CONF 2)
|
EA
|
1.000
|
$16,596.000
|
$12,000.000
|
$12,000.000
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
6.000
|
$712.000
|
$4,900.000
|
$6,400.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
32,212.000
|
$18.000
|
$21.250
|
$21.250
|
|
|
ITS MULTI-DUCT CND (PVC-40)(STL ENCSE)
|
LF
|
4,985.000
|
$65.000
|
$90.000
|
$90.000
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
4,404.000
|
$115.000
|
$133.000
|
$133.000
|
|
|
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
|
LF
|
57,013.000
|
$11.000
|
$11.750
|
$11.750
|
|
|
CONDUIT (PREPARE)
|
LF
|
3,756.000
|
$2.600
|
$2.000
|
$2.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
18.000
|
$274.000
|
$400.000
|
$400.000
|
|
|
CTMS RELOCATION (HUB BLDG)
|
EA
|
1.000
|
$10,000.000
|
$14,500.000
|
$14,800.000
|
|
|
CTMS RELOCATION (ELEC CONDUCTOR CABLE)
|
LF
|
360.000
|
$8.000
|
$6.000
|
$6.000
|
|
|
CTMS RELOCATION (COMMUNICATION CABLE)
|
LF
|
120.000
|
$8.000
|
$12.000
|
$12.000
|
|
|
CTMS RELOCATION (DMS)
|
EA
|
1.000
|
$5,000.000
|
$24,000.000
|
$29,000.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
62,255.000
|
$1.000
|
$0.780
|
$0.780
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
15,100.000
|
$1.600
|
$1.000
|
$1.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
1,529.000
|
$2.800
|
$1.850
|
$1.850
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
13,932.000
|
$2.000
|
$1.650
|
$1.650
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
5,044.000
|
$3.500
|
$2.750
|
$2.750
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
1,501.000
|
$3.400
|
$3.000
|
$3.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
53,794.000
|
$1.600
|
$0.780
|
$0.780
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
1,714.000
|
$5.300
|
$5.350
|
$5.350
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
335.000
|
$10.000
|
$8.350
|
$8.350
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
6,256.000
|
$1.200
|
$1.000
|
$1.000
|
|
|
RELOCATE EXISTING OVERHEAD SIGNS
|
EA
|
1.000
|
$1,107.000
|
$2,400.000
|
$2,400.000
|
|
|
SHIFT OVERHEAD SIGN PANELS
|
EA
|
1.000
|
$1,408.000
|
$1,800.000
|
$1,800.000
|
|
|
REMOVE OVERHEAD SIGN PANELS
|
EA
|
1.000
|
$1,441.000
|
$2,600.000
|
$2,600.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
2.000
|
$8,621.000
|
$7,800.000
|
$7,800.000
|
|
|
ITS POLE (30 FT)(REL)
|
EA
|
2.000
|
$8,000.000
|
$4,900.000
|
$6,400.000
|
|
|
ITS POLE (55 FT)(REL)
|
EA
|
5.000
|
$10,000.000
|
$5,400.000
|
$6,900.000
|
|
|
ITS POLE (55 FT)(REM)
|
EA
|
1.000
|
$5,000.000
|
$2,400.000
|
$3,900.000
|
|
|
ITS POLE (8 FT)(COSS/OSB)
|
EA
|
1.000
|
$7,699.000
|
$10,500.000
|
$10,500.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)(REL)
|
EA
|
7.000
|
$10,000.000
|
$1,900.000
|
$1,900.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)(REM)
|
EA
|
1.000
|
$5,000.000
|
$1,800.000
|
$1,800.000
|
|
|
MODIFY EXISTING ELECTRICAL SERVICE
|
EA
|
6.000
|
$7,000.000
|
$1,600.000
|
$1,600.000
|
|
|
REMOVE EXISTING CABLES (FIBER)
|
LF
|
82,466.000
|
$0.530
|
$0.700
|
$0.700
|
|
|
REMOVE EXISTING CABLES (POWER)
|
LF
|
27,618.000
|
$3.500
|
$0.500
|
$0.500
|
|
|
REMOVE EXISTING CABLES (COMMUNICATION)
|
LF
|
1,432.000
|
$0.520
|
$1.900
|
$1.900
|
|
|
TMA (STATIONARY)
|
DAY
|
89.000
|
$151.000
|
$878.970
|
$380.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)
|
EA
|
1.000
|
$5,900.000
|
$5,500.000
|
$5,500.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
74.000
|
$4,123.000
|
$5,100.000
|
$5,100.000
|
|
|
ITS RVSD (DC ONLY) (RELOCATE)
|
EA
|
3.000
|
$1,186.000
|
$1,500.000
|
$1,500.000
|
|
|
TEMP CON EQUIP ALERT (2 SYS)
|
DAY
|
1,388.000
|
$28.000
|
$36.030
|
$37.000
|
|
|
SMART WORK ZONE ITS SYSTEM
|
LS
|
1.000
|
$540,000.000
|
$329,296.110
|
$330,000.000
|
|
|
REMOVE HIGH MAST LIGHTING ASSEMBLY
|
EA
|
16.000
|
$8,250.000
|
$3,650.000
|
$8,650.000
|
|
|
REMOVE EXIST SAN SWR PIPE (10")
|
LF
|
20.000
|
$35.000
|
$30.000
|
$68.350
|
|
|
REMOVE EXIST SAN SWR PIPE (8IN)
|
LF
|
214.000
|
$28.000
|
$30.000
|
$65.500
|
|
|
JCK TUN BOR OR AUG CSG (STL) (16IN)
|
LF
|
60.000
|
$221.000
|
$2,230.000
|
$1,183.300
|
|
|
REMOVING FIRE HYDRANT
|
EA
|
2.000
|
$4,000.000
|
$500.000
|
$729.500
|
|
|
ABAN/REM/DIS EXIST LINE (ALL TY/SIZ)
|
LF
|
120.000
|
$17.000
|
$50.000
|
$47.000
|
|
|
WATER MAIN PIPE (DI)(16IN)(RESTR JT)
|
LF
|
120.000
|
$200.000
|
$200.000
|
$2,410.400
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
1.000
|
$1,310.000
|
$4,000.000
|
$28,912.000
|
|
Totals: |
$344,977,611.520
|
$407,810,028.433
|
$459,501,382.240
|