Show Job Controls
Bid Cobra

HARRIS SS 261 (0110-06-155)

Items: 90

County: HARRIS
Length: N/A
Highway: SS 261
District: HOUSTON
Control Number: 0110-06-155
DBE Goal: 0.0%
Project: STP 2B24(342)VRU
Guaranty: N/A
Time: 149 WORKING DAYS
Engineer's Estimate: $1,065,254.99
Date: 08/02/2024 (1 year ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$1,065,254.99
Over/Under Est: -6.31% -$67,171.68
Subcontractor Percentage Amount
AAA ASPHALT PAVING, INC. 23.12% $235,702.44
BATTERSON, LLP 3.70% $37,720.55
Total: 26.82% $273,422.99

Bid Items & Bid Tabulations

90 Total 0 of 90
HARRIS  |  SS 261  |  HOUSTON  |  0110-06-155  |  08/02/2024  |  $1,065,254.99  |  STP 2B24(342)VRU  |  HAZARD ELIM & SAFETY  |  149 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATEWIDE TRAFFIC SIGNAL COMPANY
PREPARING ROW
STA 3.000 $1,231.230 $5,700.000
REMOVING CONC (CURB)
LF 45.000 $8.690 $9.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 222.000 $25.000 $30.000
SUBGRADE WIDENING (DENS CONT)
STA 3.000 $890.080 $1,805.000
BLOCK SODDING
SY 136.000 $6.710 $31.000
FERTILIZER
AC 0.030 $2,692.460 $10,000.000
VEGETATIVE WATERING
MG 3.000 $28.000 $75.000
LIME TRT (EXST MATL) (6")
SY 318.000 $8.000 $40.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 4.000 $366.040 $670.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 318.000 $10.780 $41.200
ASPHALT STAB BASE (GR 2)(PG 64)
TON 17.000 $135.000 $350.000
CONC PVMT (CONT REINF - CRCP) (9")
SY 289.000 $300.000 $160.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 12.000 $262.790 $195.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 98.000 $300.000 $380.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 66.000 $450.000 $450.000
RIPRAP (CONC)(6 IN)
CY 3.000 $610.000 $1,600.000
MOBILIZATION
LS 1.000 $85,000.000 $25,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $13,000.000 $900.000
CONC CURB (MONO) (TY II)
LF 275.000 $13.180 $26.000
CONC SIDEWALKS (6")
SY 21.000 $64.000 $160.000
CURB RAMPS (TY 3)
EA 4.000 $2,690.000 $5,720.000
CURB RAMPS (TY 7)
EA 10.000 $2,950.000 $5,460.000
CURB RAMPS (TY 21)
EA 4.000 $2,700.000 $6,900.000
CURB RAMPS (TY 22)
EA 1.000 $2,700.000 $8,760.000
CONDT (PVC) (SCH 80) (2")
LF 360.000 $9.500 $23.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 95.000 $16.720 $23.000
CONDT (PVC) (SCH 80) (3")
LF 285.000 $25.000 $33.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 155.000 $38.410 $33.000
CONDT (PVC) (SCH 80) (4")
LF 110.000 $36.680 $59.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 380.000 $35.000 $59.000
ELEC CONDR (NO.8) BARE
LF 1,515.000 $1.680 $1.500
ELEC CONDR (NO.4) INSULATED
LF 505.000 $2.500 $3.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 1,490.000 $2.800 $3.500
GROUND BOX TY D (162922)W/APRON
EA 20.000 $1,260.000 $4,000.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $6,937.560 $5,900.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(U)
EA 1.000 $9,310.870 $11,800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $668.670 $1,250.000
REMOVE SM RD SN SUP&AM
EA 9.000 $98.920 $80.000
INSTL OM ASSM (OM-4)(FLX)GND
EA 12.000 $4,289.290 $110.000
PAVEMENT SEALER (ARROW)
EA 10.000 $25.000 $65.000
PAVEMENT SEALER (WORD)
EA 10.000 $25.000 $65.000
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $10.000 $93.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 10.000 $210.000 $260.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $251.640 $425.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $280.000 $310.000
REFL PAV MRKR TY II-A-A
EA 8.000 $6.650 $11.000
REFL PAV MRKR TY II-C-R
EA 46.000 $4.750 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 100.000 $0.750 $1.050
ELIM EXT PAV MRK & MRKS (6")
LF 1,700.000 $0.600 $1.050
ELIM EXT PAV MRK & MRKS (8")
LF 482.000 $1.320 $1.550
ELIM EXT PAV MRK & MRKS (12")
LF 1,140.000 $1.400 $2.100
ELIM EXT PAV MRK & MRKS (24")
LF 184.000 $2.100 $4.150
ELIM EXT PAV MRK & MRKS (ARROW)
EA 9.000 $60.000 $105.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 2.000 $45.000 $160.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 8.000 $60.050 $105.000
PAV SURF PREP FOR MRK (6")
LF 3,296.000 $0.080 $0.020
PAV SURF PREP FOR MRK (8")
LF 702.000 $0.150 $0.030
PAV SURF PREP FOR MRK (24")
LF 1,163.000 $0.400 $0.090
PAV SURF PREP FOR MRK (ARROW)
EA 10.000 $11.000 $15.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $5.000 $15.000
PAV SURF PREP FOR MRK (WORD)
EA 10.000 $12.000 $15.000
INSTALL HWY TRF SIG (SYSTEM)
EA 2.000 $35,832.000 $56,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $522.000 $9,650.000
VEH SIG SEC (12")LED(GRN)
EA 25.000 $255.000 $260.000
VEH SIG SEC (12")LED(GRN ARW)
EA 9.000 $255.000 $260.000
VEH SIG SEC (12")LED(YEL)
EA 25.000 $255.000 $260.000
VEH SIG SEC (12")LED(YEL ARW)
EA 5.000 $255.000 $260.000
VEH SIG SEC (12")LED(RED)
EA 25.000 $255.000 $260.000
VEH SIG SEC (12")LED(RED ARW)
EA 7.000 $255.000 $260.000
PED SIG SEC (LED)(COUNTDOWN)
EA 20.000 $900.000 $730.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 8.000 $200.000 $295.000
BACKPLATE W/REFL BRDR(3 SEC)
EA 22.000 $160.000 $205.000
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
LF 3,450.000 $2.110 $1.350
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 3,645.000 $2.830 $2.100
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 5,950.000 $3.000 $2.500
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 5.000 $11,750.000 $10,100.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 2.000 $17,448.780 $12,000.000
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 3.000 $32,232.230 $28,000.000
PED POLE ASSEMBLY
EA 19.000 $3,000.000 $2,260.000
PED DETECT PUSH BUTTON (APS)
EA 20.000 $800.000 $745.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $4,000.000 $3,700.000
REMOVE LUMINAIRE POLE
EA 2.000 $707.540 $750.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 880.000 $1.600 $2.060
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 1,640.000 $1.300 $2.060
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 702.000 $2.100 $3.100
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 1,163.000 $9.380 $10.300
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 776.000 $1.200 $2.060
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 2.000 $8,000.000 $9,300.000
VIVDS PROSR SYS (INSTALL ONLY)
EA 2.000 $1,171.400 $840.000
VIVDS CAM ASSY (INSTALL ONLY)
EA 8.000 $475.000 $840.000
Totals: $1,065,254.994 $998,083.310