HARRIS IH 45 (0110-05-126)

Items: 126

County: HARRIS
Length: N/A
Highway: IH 45
District: HOUSTON
Control Number: 0110-05-126
DBE Goal: N/A
Project: C 110-5-126
Guaranty: N/A
Time: 591 WORKING DAYS
Engineer's Estimate: $5,866,750.69
Date: 12/01/2021 (4 years ago)
Contract Number: N/A
Type: REPLACE SB FRONTAGE ROAD BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (7)
E
Engineer's Estimate
$5,866,750.69
Over/Under Est: 13.92% $816,783.11
Over/Under Est: 27.36% $1,605,188.96
Amt Left: 11.8% $788,405.85
$7,669,149.14
Over/Under Est: 30.72% $1,802,398.45
Amt Left: 14.75% $985,615.34
Delta: -2.64% -$197,209.49
Over/Under Est: 32.75% $1,921,195.80
Amt Left: 16.52% $1,104,412.69
Delta: -1.55% -$118,797.35
Over/Under Est: 38.63% $2,266,612.90
Amt Left: 21.69% $1,449,829.79
Delta: -4.44% -$345,417.10
Over/Under Est: 45.88% $2,691,932.73
Amt Left: 28.06% $1,875,149.62
Delta: -5.23% -$425,319.83
Over/Under Est: 92.68% $5,437,062.53
Amt Left: 69.13% $4,620,279.42
Delta: -32.07% -$2,745,129.80

Bid Items & Bid Tabulations

126 Total 0 of 126
HARRIS  |  IH 45  |  HOUSTON  |  0110-05-126  |  12/01/2021  |  $5,866,750.69  |  C 110-5-126  |  REPLACE SB FRONTAGE ROAD BRIDGE AND...  |  591 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ARANDA BROTHERS CONSTRUCTION CO., INC.
SER CONSTRUCTION PARTNERS, LLC
NBG CONSTRUCTORS, INC.
RAGLE CONSTRUCTION, INC.
JAMES CONSTRUCTION GROUP, LLC
STERLING DELAWARE HOLDING COMPANY, INC.
ARCHER WESTERN CONSTRUCTION, LLC
PREPARING ROW
STA 19.000 $2,000.000 $4,532.000 $5,300.000 $30,000.000 $25,000.000 $42,700.000 $41,500.000 $2,960.000
REMOVING CONC (PAV)
SY 7,437.000 $7.000 $5.000 $8.000 $8.000 $7.700 $4.830 $6.500 $5.360
REMOVING CONC (RIPRAP)
SY 1,388.000 $8.000 $5.000 $2.650 $5.000 $7.500 $8.720 $2.500 $4.590
REMOVING CONC (DRIVEWAYS)
SY 158.000 $7.000 $5.000 $5.500 $15.000 $15.000 $15.320 $4.000 $8.980
REMOVING CONC (APPR SLAB)
SY 169.000 $30.000 $5.000 $8.900 $10.000 $25.000 $28.160 $15.000 $12.710
REMOVING STAB BASE AND ASPH PAV (7")
SY 7,316.000 $5.000 $5.000 $5.300 $5.000 $2.500 $2.960 $3.600 $6.870
EXCAVATION (ROADWAY)
CY 1,382.000 $15.000 $13.000 $20.200 $20.000 $45.000 $8.480 $40.000 $23.430
EXCAVATION (CHANNEL)
CY 25,000.000 $7.000 $12.750 $14.400 $1.000 $8.000 $18.100 $23.000 $32.630
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,472.000 $12.000 $16.500 $4.750 $4.000 $1.000 $52.390 $35.000 $49.900
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 1,989.000 $36.000 $65.000 $63.000 $37.000 $25.000 $44.390 $57.000 $67.960
BLOCK SODDING
SY 7,965.000 $4.000 $6.000 $4.700 $3.250 $4.250 $4.620 $3.150 $4.340
STRAW OR HAY MULCH
SY 7,965.000 $1.400 $0.500 $0.200 $0.250 $0.240 $0.680 $0.240 $0.360
DRILL SEED (TEMP)(WARM OR COOL)
SY 7,965.000 $0.120 $0.450 $0.170 $0.250 $0.220 $0.600 $0.220 $0.190
FERTILIZER
AC 3.300 $750.000 $1,600.000 $750.000 $600.000 $600.000 $994.000 $600.000 $1,275.510
VEGETATIVE WATERING
MG 394.000 $15.000 $80.000 $10.000 $30.000 $30.000 $50.560 $22.000 $70.180
LIME TRT (EXST MATL) (6")
SY 5,545.000 $3.500 $4.500 $5.900 $6.500 $4.500 $5.700 $9.000 $14.120
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 75.000 $180.000 $185.000 $225.000 $210.000 $197.000 $210.550 $200.000 $208.950
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 5,545.000 $8.400 $17.500 $18.200 $30.000 $15.000 $17.650 $23.000 $16.860
ASPHALT STAB BASE (GR 4)(PG 64)
TON 272.000 $85.000 $180.000 $148.000 $160.000 $157.750 $194.520 $145.000 $457.190
CONC PVMT (CONT REINF - CRCP) (10")
SY 4,815.000 $70.000 $71.000 $71.000 $85.000 $70.000 $84.770 $104.000 $164.960
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 2,803.000 $175.000 $105.000 $105.000 $95.000 $100.000 $119.320 $115.000 $142.040
CONC PVMT (CONT REINF)(FAST TRK)(15")
SY 531.000 $220.000 $115.000 $133.000 $160.000 $130.000 $154.040 $150.000 $291.120
CEM STABIL BKFL
CY 1,306.000 $45.000 $65.000 $46.000 $55.000 $35.000 $39.550 $46.000 $115.980
CEMENT STAB BACKFILL (INLET OR MH)
CY 187.000 $45.000 $65.000 $46.000 $55.000 $35.000 $42.760 $46.000 $116.940
TRENCH EXCAVATION PROTECTION
LF 1,557.000 $1.750 $2.000 $0.110 $10.500 $5.000 $1.090 $1.000 $6.950
DRILL SHAFT (18 IN)
LF 122.000 $95.000 $145.100 $120.000 $80.000 $105.000 $55.780 $118.000 $70.820
DRILL SHAFT (30 IN)
LF 804.000 $185.000 $210.000 $182.000 $225.000 $175.000 $141.700 $210.000 $210.990
DRILL SHAFT (42 IN)
LF 1,050.000 $235.000 $420.000 $372.000 $430.000 $225.000 $276.920 $321.000 $393.610
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 7.000 $71.650 $200.000 $95.000 $90.000 $90.000 $90.000 $79.000 $473.600
CL C CONC (ABUT)
CY 67.600 $940.000 $950.000 $1,370.000 $1,500.000 $1,400.000 $2,000.000 $1,650.000 $1,878.060
CL C CONC (CAP)
CY 77.100 $950.000 $1,050.000 $1,520.000 $1,500.000 $1,700.000 $2,000.000 $1,250.000 $2,230.080
CL C CONC (COLUMN)
CY 61.700 $934.310 $900.000 $1,620.000 $1,000.000 $1,400.000 $2,000.000 $1,500.000 $2,638.850
REINF CONC SLAB
SF 18,625.000 $15.000 $16.800 $24.500 $18.000 $20.000 $29.900 $23.000 $37.520
BRIDGE SIDEWALK
SF 3,339.000 $10.000 $7.250 $8.000 $6.000 $9.500 $20.500 $8.000 $24.610
RETAINING WALL (MSE)
SF 9,312.000 $35.000 $41.000 $72.000 $60.000 $55.000 $39.480 $60.000 $64.120
PRESTR CONC GIRDER (TX54)
LF 2,446.350 $130.000 $220.000 $353.000 $205.000 $185.000 $178.850 $258.000 $385.520
RIPRAP (CONC)(4 IN)
CY 88.000 $400.000 $370.000 $395.000 $400.000 $445.000 $468.470 $461.000 $915.440
RIPRAP (CONC)(5 IN)
CY 418.000 $500.000 $395.000 $395.000 $400.000 $415.000 $377.420 $520.000 $874.440
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 47.400 $440.000 $385.000 $400.000 $650.000 $495.000 $505.230 $520.000 $1,029.130
RIPRAP (MOW STRIP)(4 IN)
CY 36.000 $450.000 $380.000 $470.000 $600.000 $475.000 $536.760 $750.000 $793.540
STR STEEL (MISC NON - BRIDGE)
LB 318.000 $9.750 $20.000 $13.000 $15.000 $15.000 $17.380 $28.000 $27.050
RAIL (TY T223)
LF 427.000 $120.000 $115.000 $142.000 $85.000 $105.000 $68.210 $117.000 $222.310
RAIL (TY C223)
LF 1,119.000 $125.000 $145.000 $187.000 $125.000 $135.000 $125.000 $138.000 $237.510
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 132.000 $113.000 $110.000 $95.000 $125.000 $85.000 $125.000 $175.000 $144.280
CONC BOX CULV (5 FT X 4 FT)
LF 740.000 $300.000 $550.000 $368.000 $700.000 $425.000 $379.230 $350.000 $658.580
CONC BOX CULV (6 FT X 4 FT)
LF 777.000 $370.000 $575.000 $443.000 $600.000 $505.000 $448.980 $440.000 $760.680
RC PIPE (CL III)(18 IN)
LF 51.000 $76.000 $105.000 $92.000 $225.000 $80.000 $73.940 $125.000 $188.000
RC PIPE (CL III)(24 IN)
LF 6.000 $150.000 $130.000 $142.000 $375.000 $120.000 $184.850 $295.000 $573.840
INLET (COMPL)(TY AZR2G)
EA 6.000 $10,572.000 $12,500.000 $15,300.000 $11,000.000 $9,000.000 $10,724.450 $11,400.000 $13,708.530
INLET (COMPL)(CURB)(TY C1)
EA 5.000 $8,000.000 $9,500.000 $10,500.000 $10,000.000 $8,000.000 $6,066.700 $11,400.000 $10,306.380
MANH (COMPL)(TY M)
EA 5.000 $8,500.000 $13,500.000 $4,500.000 $21,000.000 $14,250.000 $15,749.290 $13,000.000 $22,998.620
INLET (COMPL) (EXT) (TY CI)
EA 7.000 $1,476.000 $1,650.000 $3,400.000 $1,100.000 $2,900.000 $1,278.650 $1,990.000 $3,508.820
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 2.000 $12,000.000 $3,250.000 $19,300.000 $32,000.000 $8,250.000 $18,209.600 $18,000.000 $14,257.260
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $2,950.000 $3,000.000 $3,200.000 $1,700.000 $1,913.950 $2,040.000 $2,492.340
REMOV STR (INLET)
EA 1.000 $55.000 $400.000 $720.000 $525.000 $500.000 $798.780 $630.000 $1,420.600
REMOV STR (MANHOLE)
EA 4.000 $575.000 $550.000 $960.000 $525.000 $580.000 $844.180 $630.000 $1,385.580
REMOV STR (SET)
EA 2.000 $320.000 $400.000 $720.000 $525.000 $465.000 $337.670 $380.000 $769.300
REMOV STR (PIPE)
LF 26.000 $18.000 $10.000 $30.400 $40.000 $20.000 $37.730 $21.000 $83.530
REMOV STR (BOX CULVERT)
LF 1,529.000 $50.000 $15.000 $41.000 $45.000 $35.000 $55.580 $56.000 $128.670
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $70,000.000 $136,000.000 $115,000.000 $130,000.000 $250,000.000 $251,000.000 $144,338.000 $225,646.970
MOBILIZATION
LS 1.000 $581,420.000 $500,450.000 $730,000.000 $765,000.000 $770,000.000 $811,000.000 $850,000.000 $1,129,820.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $7,000.000 $1,250.000 $1,900.000 $600.000 $5,000.000 $2,456.700 $3,600.000 $5,600.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 35.000 $30.000 $35.000 $85.000 $50.000 $40.040 $74.000 $168.000 $40.860
ROCK FILTER DAMS (REMOVE)
LF 35.000 $8.350 $10.000 $17.000 $15.000 $11.410 $34.000 $50.000 $11.640
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 150.000 $17.000 $27.000 $28.000 $45.000 $33.800 $33.800 $39.900 $34.490
CONSTRUCTION EXITS (REMOVE)
SY 150.000 $7.000 $5.000 $5.600 $10.000 $8.040 $8.040 $24.000 $8.200
CONSTRUCTION PERIMETER FENCE
LF 225.000 $9.000 $15.000 $3.400 $12.500 $5.000 $7.500 $7.500 $10.820
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,353.000 $2.000 $3.850 $2.300 $3.500 $2.750 $3.800 $5.000 $8.420
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,353.000 $0.500 $2.000 $0.600 $1.250 $0.980 $1.250 $1.000 $3.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 518.000 $4.000 $7.000 $4.500 $6.000 $4.740 $6.800 $9.590 $9.670
BIODEG EROSN CONT LOGS (REMOVE)
LF 518.000 $1.000 $1.000 $1.100 $1.250 $0.980 $2.000 $1.250 $2.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 900.000 $15.000 $25.000 $10.300 $55.000 $25.000 $19.920 $50.000 $24.280
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 2,440.000 $10.000 $20.000 $12.200 $20.000 $25.000 $8.780 $11.000 $13.670
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 40.000 $15.000 $20.000 $9.000 $20.000 $25.000 $12.470 $14.000 $54.850
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,710.000 $7.000 $10.000 $13.300 $6.000 $15.000 $7.000 $3.000 $10.370
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 4,380.000 $4.000 $10.000 $7.700 $6.000 $15.000 $2.440 $5.000 $7.450
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $8.000 $10.000 $8.900 $6.000 $15.000 $2.450 $5.000 $4.750
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 900.000 $8.000 $20.000 $8.800 $15.000 $10.000 $11.150 $14.000 $12.710
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 2,440.000 $10.000 $15.000 $8.100 $10.000 $10.000 $8.080 $10.000 $11.690
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 40.000 $10.000 $10.000 $8.100 $10.000 $15.000 $11.780 $17.000 $15.050
PORT CTB CONNECT HARDWARE
EA 28.000 $50.000 $160.000 $120.000 $200.000 $170.000 $48.100 $143.000 $140.730
CONC CURB (DOWEL)
LF 3,476.000 $8.000 $7.000 $4.400 $6.000 $10.000 $14.580 $5.000 $11.050
DRIVEWAYS (CONC) (FAST TRACK)
SY 122.000 $100.000 $90.000 $87.000 $130.000 $115.000 $70.600 $115.000 $74.600
CONC SIDEWALKS (5")
SY 907.000 $150.000 $70.000 $67.000 $85.000 $50.000 $57.110 $60.000 $80.310
CURB RAMPS (TY 10)
EA 4.000 $2,000.000 $1,650.000 $2,050.000 $2,000.000 $2,400.000 $1,861.300 $2,700.000 $2,239.110
MTL W-BEAM GD FEN (TIM POST)
LF 287.500 $30.000 $35.000 $32.300 $30.000 $27.500 $27.500 $31.500 $33.100
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $1,960.000 $2,100.000 $2,100.000 $2,100.000 $2,100.000 $1,660.000 $2,600.000
REMOVE METAL BEAM GUARD FENCE
LF 455.000 $2.000 $5.000 $2.300 $5.000 $5.000 $5.000 $1.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $450.000 $180.000 $350.000 $350.000 $350.000 $175.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,500.000 $3,500.000 $3,800.000 $3,150.000 $3,150.000 $3,150.000 $3,500.000 $3,450.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $200.000 $450.000 $240.000 $250.000 $250.000 $250.000 $275.000 $196.990
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $2,500.000 $4,250.000 $2,700.000 $4,150.000 $4,150.000 $4,150.000 $1,000.000 $2,235.710
CRASH CUSH ATTEN (STKPL)
EA 1.000 $750.000 $2,500.000 $780.000 $1,200.000 $1,200.000 $1,200.000 $1,000.000 $2,235.710
ALUMINUM SIGNS (TY G)
SF 37.500 $30.000 $40.000 $26.400 $45.000 $42.000 $42.000 $34.000 $65.490
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $600.000 $515.000 $480.000 $460.000 $455.000 $455.000 $600.000 $1,214.110
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $550.000 $820.000 $530.000 $750.000 $735.000 $735.000 $720.000 $1,516.370
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 1.000 $750.000 $850.000 $630.000 $750.000 $720.000 $720.000 $1,000.000 $2,100.760
INSTALL LRSS (STRUCT STEEL)
LB 293.700 $5.000 $10.000 $9.400 $5.000 $4.850 $4.850 $7.000 $8.060
REMOVE LRSA
EA 1.000 $2,000.000 $2,000.000 $3,300.000 $500.000 $500.000 $500.000 $1,100.000 $1,062.970
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 6.000 $40.000 $40.000 $20.700 $35.000 $32.000 $32.000 $40.000 $34.020
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,276.000 $1.100 $2.000 $0.800 $1.500 $0.850 $2.750 $0.850 $1.420
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 9,481.000 $0.800 $1.300 $0.700 $1.000 $0.850 $2.150 $0.850 $0.940
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 840.000 $1.200 $2.000 $1.300 $2.000 $1.750 $4.000 $1.750 $1.840
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,702.000 $0.800 $1.200 $0.750 $1.000 $0.850 $2.110 $0.850 $0.940
WK ZN PAV MRK REMOV (Y)8"(SLD)
LF 717.000 $1.800 $2.200 $2.400 $0.250 $1.750 $4.250 $1.750 $1.840
WK ZN PAV MRK REMOV (Y)12"(SLD)
LF 272.000 $2.000 $4.250 $2.500 $4.000 $5.000 $7.100 $5.000 $4.040
REFL PAV MRKR TY I-A
EA 21.000 $5.300 $7.000 $5.800 $6.000 $6.000 $7.250 $6.000 $6.120
REFL PAV MRKR TY II-C-R
EA 84.000 $4.500 $7.000 $4.800 $6.000 $6.000 $7.250 $6.000 $6.120
ELIM EXT PAV MRK & MRKS (6")
LF 1,406.000 $0.400 $0.500 $0.550 $0.350 $1.000 $1.250 $1.000 $0.330
ELIM EXT PAV MRK & MRKS (8")
LF 1,377.000 $0.600 $0.900 $0.700 $0.750 $1.250 $1.500 $1.250 $0.710
ELIM EXT PAV MRK & MRKS (12")
LF 241.000 $0.900 $1.500 $1.050 $1.250 $2.500 $1.780 $2.500 $1.220
PAV SURF PREP FOR MRK (6")
LF 5,731.000 $0.100 $0.100 $0.060 $0.010 $0.010 $0.500 $0.010 $0.010
PAV SURF PREP FOR MRK (8")
LF 1,340.000 $0.100 $0.100 $0.070 $0.010 $0.020 $1.100 $0.020 $0.010
PAV SURF PREP FOR MRK (12")
LF 283.000 $0.100 $0.100 $0.180 $0.010 $0.030 $1.500 $0.030 $0.010
TREE AND BRUSH REMOVAL
AC 2.260 $10,000.000 $2,000.000 $9,000.000 $5,000.000 $290,000.000 $10,480.350 $12,000.000 $15,500.000
WIDE FLANGE PAVEMENT TERMINALS
LF 95.750 $612.000 $165.000 $700.000 $850.000 $500.000 $613.480 $800.000 $530.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 23.000 $100.000 $500.000 $61.000 $75.000 $65.000 $427.510 $23.000 $62.460
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 2,084.000 $0.700 $1.500 $0.700 $1.250 $0.850 $0.800 $0.850 $1.280
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 860.000 $0.700 $1.500 $0.850 $1.250 $0.850 $0.850 $0.850 $1.280
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 845.000 $1.000 $2.000 $1.400 $1.750 $0.950 $1.100 $0.950 $1.790
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 1,927.000 $1.000 $1.500 $0.700 $1.250 $0.850 $0.800 $0.850 $1.280
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
LF 495.000 $1.500 $2.000 $0.700 $1.750 $0.950 $1.150 $0.950 $1.790
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
LF 283.000 $3.250 $5.000 $1.300 $4.250 $8.000 $3.250 $8.000 $4.340
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 860.000 $1.000 $2.000 $0.900 $1.950 $0.950 $1.250 $0.950 $1.990
TMA (STATIONARY)
DAY 708.000 $200.000 $200.000 $150.000 $170.000 $250.000 $153.920 $93.000 $220.000
TMA (MOBILE OPERATION)
HR 8.000 $65.000 $100.000 $250.000 $50.000 $100.000 $869.270 $53.000 $70.000
Totals: $5,866,750.627 $6,683,533.800 $7,471,939.650 $7,669,149.140 $7,787,946.495 $8,133,363.606 $8,558,683.420 $11,303,813.253