PREPARING ROW
|
STA
|
19.000
|
$2,000.000
|
$4,532.000
|
$5,300.000
|
$30,000.000
|
$25,000.000
|
$42,700.000
|
$41,500.000
|
$2,960.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
7,437.000
|
$7.000
|
$5.000
|
$8.000
|
$8.000
|
$7.700
|
$4.830
|
$6.500
|
$5.360
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,388.000
|
$8.000
|
$5.000
|
$2.650
|
$5.000
|
$7.500
|
$8.720
|
$2.500
|
$4.590
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
158.000
|
$7.000
|
$5.000
|
$5.500
|
$15.000
|
$15.000
|
$15.320
|
$4.000
|
$8.980
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
169.000
|
$30.000
|
$5.000
|
$8.900
|
$10.000
|
$25.000
|
$28.160
|
$15.000
|
$12.710
|
|
|
REMOVING STAB BASE AND ASPH PAV (7")
|
SY
|
7,316.000
|
$5.000
|
$5.000
|
$5.300
|
$5.000
|
$2.500
|
$2.960
|
$3.600
|
$6.870
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,382.000
|
$15.000
|
$13.000
|
$20.200
|
$20.000
|
$45.000
|
$8.480
|
$40.000
|
$23.430
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
25,000.000
|
$7.000
|
$12.750
|
$14.400
|
$1.000
|
$8.000
|
$18.100
|
$23.000
|
$32.630
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,472.000
|
$12.000
|
$16.500
|
$4.750
|
$4.000
|
$1.000
|
$52.390
|
$35.000
|
$49.900
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
1,989.000
|
$36.000
|
$65.000
|
$63.000
|
$37.000
|
$25.000
|
$44.390
|
$57.000
|
$67.960
|
|
|
BLOCK SODDING
|
SY
|
7,965.000
|
$4.000
|
$6.000
|
$4.700
|
$3.250
|
$4.250
|
$4.620
|
$3.150
|
$4.340
|
|
|
STRAW OR HAY MULCH
|
SY
|
7,965.000
|
$1.400
|
$0.500
|
$0.200
|
$0.250
|
$0.240
|
$0.680
|
$0.240
|
$0.360
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
7,965.000
|
$0.120
|
$0.450
|
$0.170
|
$0.250
|
$0.220
|
$0.600
|
$0.220
|
$0.190
|
|
|
FERTILIZER
|
AC
|
3.300
|
$750.000
|
$1,600.000
|
$750.000
|
$600.000
|
$600.000
|
$994.000
|
$600.000
|
$1,275.510
|
|
|
VEGETATIVE WATERING
|
MG
|
394.000
|
$15.000
|
$80.000
|
$10.000
|
$30.000
|
$30.000
|
$50.560
|
$22.000
|
$70.180
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
5,545.000
|
$3.500
|
$4.500
|
$5.900
|
$6.500
|
$4.500
|
$5.700
|
$9.000
|
$14.120
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
75.000
|
$180.000
|
$185.000
|
$225.000
|
$210.000
|
$197.000
|
$210.550
|
$200.000
|
$208.950
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
5,545.000
|
$8.400
|
$17.500
|
$18.200
|
$30.000
|
$15.000
|
$17.650
|
$23.000
|
$16.860
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
272.000
|
$85.000
|
$180.000
|
$148.000
|
$160.000
|
$157.750
|
$194.520
|
$145.000
|
$457.190
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
4,815.000
|
$70.000
|
$71.000
|
$71.000
|
$85.000
|
$70.000
|
$84.770
|
$104.000
|
$164.960
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
2,803.000
|
$175.000
|
$105.000
|
$105.000
|
$95.000
|
$100.000
|
$119.320
|
$115.000
|
$142.040
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(15")
|
SY
|
531.000
|
$220.000
|
$115.000
|
$133.000
|
$160.000
|
$130.000
|
$154.040
|
$150.000
|
$291.120
|
|
|
CEM STABIL BKFL
|
CY
|
1,306.000
|
$45.000
|
$65.000
|
$46.000
|
$55.000
|
$35.000
|
$39.550
|
$46.000
|
$115.980
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
187.000
|
$45.000
|
$65.000
|
$46.000
|
$55.000
|
$35.000
|
$42.760
|
$46.000
|
$116.940
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,557.000
|
$1.750
|
$2.000
|
$0.110
|
$10.500
|
$5.000
|
$1.090
|
$1.000
|
$6.950
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
122.000
|
$95.000
|
$145.100
|
$120.000
|
$80.000
|
$105.000
|
$55.780
|
$118.000
|
$70.820
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
804.000
|
$185.000
|
$210.000
|
$182.000
|
$225.000
|
$175.000
|
$141.700
|
$210.000
|
$210.990
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,050.000
|
$235.000
|
$420.000
|
$372.000
|
$430.000
|
$225.000
|
$276.920
|
$321.000
|
$393.610
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$71.650
|
$200.000
|
$95.000
|
$90.000
|
$90.000
|
$90.000
|
$79.000
|
$473.600
|
|
|
CL C CONC (ABUT)
|
CY
|
67.600
|
$940.000
|
$950.000
|
$1,370.000
|
$1,500.000
|
$1,400.000
|
$2,000.000
|
$1,650.000
|
$1,878.060
|
|
|
CL C CONC (CAP)
|
CY
|
77.100
|
$950.000
|
$1,050.000
|
$1,520.000
|
$1,500.000
|
$1,700.000
|
$2,000.000
|
$1,250.000
|
$2,230.080
|
|
|
CL C CONC (COLUMN)
|
CY
|
61.700
|
$934.310
|
$900.000
|
$1,620.000
|
$1,000.000
|
$1,400.000
|
$2,000.000
|
$1,500.000
|
$2,638.850
|
|
|
REINF CONC SLAB
|
SF
|
18,625.000
|
$15.000
|
$16.800
|
$24.500
|
$18.000
|
$20.000
|
$29.900
|
$23.000
|
$37.520
|
|
|
BRIDGE SIDEWALK
|
SF
|
3,339.000
|
$10.000
|
$7.250
|
$8.000
|
$6.000
|
$9.500
|
$20.500
|
$8.000
|
$24.610
|
|
|
RETAINING WALL (MSE)
|
SF
|
9,312.000
|
$35.000
|
$41.000
|
$72.000
|
$60.000
|
$55.000
|
$39.480
|
$60.000
|
$64.120
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,446.350
|
$130.000
|
$220.000
|
$353.000
|
$205.000
|
$185.000
|
$178.850
|
$258.000
|
$385.520
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
88.000
|
$400.000
|
$370.000
|
$395.000
|
$400.000
|
$445.000
|
$468.470
|
$461.000
|
$915.440
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
418.000
|
$500.000
|
$395.000
|
$395.000
|
$400.000
|
$415.000
|
$377.420
|
$520.000
|
$874.440
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
47.400
|
$440.000
|
$385.000
|
$400.000
|
$650.000
|
$495.000
|
$505.230
|
$520.000
|
$1,029.130
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
36.000
|
$450.000
|
$380.000
|
$470.000
|
$600.000
|
$475.000
|
$536.760
|
$750.000
|
$793.540
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
318.000
|
$9.750
|
$20.000
|
$13.000
|
$15.000
|
$15.000
|
$17.380
|
$28.000
|
$27.050
|
|
|
RAIL (TY T223)
|
LF
|
427.000
|
$120.000
|
$115.000
|
$142.000
|
$85.000
|
$105.000
|
$68.210
|
$117.000
|
$222.310
|
|
|
RAIL (TY C223)
|
LF
|
1,119.000
|
$125.000
|
$145.000
|
$187.000
|
$125.000
|
$135.000
|
$125.000
|
$138.000
|
$237.510
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
132.000
|
$113.000
|
$110.000
|
$95.000
|
$125.000
|
$85.000
|
$125.000
|
$175.000
|
$144.280
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
740.000
|
$300.000
|
$550.000
|
$368.000
|
$700.000
|
$425.000
|
$379.230
|
$350.000
|
$658.580
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
777.000
|
$370.000
|
$575.000
|
$443.000
|
$600.000
|
$505.000
|
$448.980
|
$440.000
|
$760.680
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
51.000
|
$76.000
|
$105.000
|
$92.000
|
$225.000
|
$80.000
|
$73.940
|
$125.000
|
$188.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
6.000
|
$150.000
|
$130.000
|
$142.000
|
$375.000
|
$120.000
|
$184.850
|
$295.000
|
$573.840
|
|
|
INLET (COMPL)(TY AZR2G)
|
EA
|
6.000
|
$10,572.000
|
$12,500.000
|
$15,300.000
|
$11,000.000
|
$9,000.000
|
$10,724.450
|
$11,400.000
|
$13,708.530
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
5.000
|
$8,000.000
|
$9,500.000
|
$10,500.000
|
$10,000.000
|
$8,000.000
|
$6,066.700
|
$11,400.000
|
$10,306.380
|
|
|
MANH (COMPL)(TY M)
|
EA
|
5.000
|
$8,500.000
|
$13,500.000
|
$4,500.000
|
$21,000.000
|
$14,250.000
|
$15,749.290
|
$13,000.000
|
$22,998.620
|
|
|
INLET (COMPL) (EXT) (TY CI)
|
EA
|
7.000
|
$1,476.000
|
$1,650.000
|
$3,400.000
|
$1,100.000
|
$2,900.000
|
$1,278.650
|
$1,990.000
|
$3,508.820
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
2.000
|
$12,000.000
|
$3,250.000
|
$19,300.000
|
$32,000.000
|
$8,250.000
|
$18,209.600
|
$18,000.000
|
$14,257.260
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$2,950.000
|
$3,000.000
|
$3,200.000
|
$1,700.000
|
$1,913.950
|
$2,040.000
|
$2,492.340
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$55.000
|
$400.000
|
$720.000
|
$525.000
|
$500.000
|
$798.780
|
$630.000
|
$1,420.600
|
|
|
REMOV STR (MANHOLE)
|
EA
|
4.000
|
$575.000
|
$550.000
|
$960.000
|
$525.000
|
$580.000
|
$844.180
|
$630.000
|
$1,385.580
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$320.000
|
$400.000
|
$720.000
|
$525.000
|
$465.000
|
$337.670
|
$380.000
|
$769.300
|
|
|
REMOV STR (PIPE)
|
LF
|
26.000
|
$18.000
|
$10.000
|
$30.400
|
$40.000
|
$20.000
|
$37.730
|
$21.000
|
$83.530
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
1,529.000
|
$50.000
|
$15.000
|
$41.000
|
$45.000
|
$35.000
|
$55.580
|
$56.000
|
$128.670
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$70,000.000
|
$136,000.000
|
$115,000.000
|
$130,000.000
|
$250,000.000
|
$251,000.000
|
$144,338.000
|
$225,646.970
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$581,420.000
|
$500,450.000
|
$730,000.000
|
$765,000.000
|
$770,000.000
|
$811,000.000
|
$850,000.000
|
$1,129,820.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$7,000.000
|
$1,250.000
|
$1,900.000
|
$600.000
|
$5,000.000
|
$2,456.700
|
$3,600.000
|
$5,600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
35.000
|
$30.000
|
$35.000
|
$85.000
|
$50.000
|
$40.040
|
$74.000
|
$168.000
|
$40.860
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
35.000
|
$8.350
|
$10.000
|
$17.000
|
$15.000
|
$11.410
|
$34.000
|
$50.000
|
$11.640
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
150.000
|
$17.000
|
$27.000
|
$28.000
|
$45.000
|
$33.800
|
$33.800
|
$39.900
|
$34.490
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
150.000
|
$7.000
|
$5.000
|
$5.600
|
$10.000
|
$8.040
|
$8.040
|
$24.000
|
$8.200
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
225.000
|
$9.000
|
$15.000
|
$3.400
|
$12.500
|
$5.000
|
$7.500
|
$7.500
|
$10.820
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,353.000
|
$2.000
|
$3.850
|
$2.300
|
$3.500
|
$2.750
|
$3.800
|
$5.000
|
$8.420
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,353.000
|
$0.500
|
$2.000
|
$0.600
|
$1.250
|
$0.980
|
$1.250
|
$1.000
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
518.000
|
$4.000
|
$7.000
|
$4.500
|
$6.000
|
$4.740
|
$6.800
|
$9.590
|
$9.670
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
518.000
|
$1.000
|
$1.000
|
$1.100
|
$1.250
|
$0.980
|
$2.000
|
$1.250
|
$2.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
900.000
|
$15.000
|
$25.000
|
$10.300
|
$55.000
|
$25.000
|
$19.920
|
$50.000
|
$24.280
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
2,440.000
|
$10.000
|
$20.000
|
$12.200
|
$20.000
|
$25.000
|
$8.780
|
$11.000
|
$13.670
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$15.000
|
$20.000
|
$9.000
|
$20.000
|
$25.000
|
$12.470
|
$14.000
|
$54.850
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,710.000
|
$7.000
|
$10.000
|
$13.300
|
$6.000
|
$15.000
|
$7.000
|
$3.000
|
$10.370
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
4,380.000
|
$4.000
|
$10.000
|
$7.700
|
$6.000
|
$15.000
|
$2.440
|
$5.000
|
$7.450
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$8.000
|
$10.000
|
$8.900
|
$6.000
|
$15.000
|
$2.450
|
$5.000
|
$4.750
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
900.000
|
$8.000
|
$20.000
|
$8.800
|
$15.000
|
$10.000
|
$11.150
|
$14.000
|
$12.710
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
2,440.000
|
$10.000
|
$15.000
|
$8.100
|
$10.000
|
$10.000
|
$8.080
|
$10.000
|
$11.690
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$10.000
|
$8.100
|
$10.000
|
$15.000
|
$11.780
|
$17.000
|
$15.050
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
28.000
|
$50.000
|
$160.000
|
$120.000
|
$200.000
|
$170.000
|
$48.100
|
$143.000
|
$140.730
|
|
|
CONC CURB (DOWEL)
|
LF
|
3,476.000
|
$8.000
|
$7.000
|
$4.400
|
$6.000
|
$10.000
|
$14.580
|
$5.000
|
$11.050
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
122.000
|
$100.000
|
$90.000
|
$87.000
|
$130.000
|
$115.000
|
$70.600
|
$115.000
|
$74.600
|
|
|
CONC SIDEWALKS (5")
|
SY
|
907.000
|
$150.000
|
$70.000
|
$67.000
|
$85.000
|
$50.000
|
$57.110
|
$60.000
|
$80.310
|
|
|
CURB RAMPS (TY 10)
|
EA
|
4.000
|
$2,000.000
|
$1,650.000
|
$2,050.000
|
$2,000.000
|
$2,400.000
|
$1,861.300
|
$2,700.000
|
$2,239.110
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
287.500
|
$30.000
|
$35.000
|
$32.300
|
$30.000
|
$27.500
|
$27.500
|
$31.500
|
$33.100
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,500.000
|
$1,960.000
|
$2,100.000
|
$2,100.000
|
$2,100.000
|
$2,100.000
|
$1,660.000
|
$2,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
455.000
|
$2.000
|
$5.000
|
$2.300
|
$5.000
|
$5.000
|
$5.000
|
$1.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$250.000
|
$450.000
|
$180.000
|
$350.000
|
$350.000
|
$350.000
|
$175.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,500.000
|
$3,500.000
|
$3,800.000
|
$3,150.000
|
$3,150.000
|
$3,150.000
|
$3,500.000
|
$3,450.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$200.000
|
$450.000
|
$240.000
|
$250.000
|
$250.000
|
$250.000
|
$275.000
|
$196.990
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
1.000
|
$2,500.000
|
$4,250.000
|
$2,700.000
|
$4,150.000
|
$4,150.000
|
$4,150.000
|
$1,000.000
|
$2,235.710
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
1.000
|
$750.000
|
$2,500.000
|
$780.000
|
$1,200.000
|
$1,200.000
|
$1,200.000
|
$1,000.000
|
$2,235.710
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
37.500
|
$30.000
|
$40.000
|
$26.400
|
$45.000
|
$42.000
|
$42.000
|
$34.000
|
$65.490
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$600.000
|
$515.000
|
$480.000
|
$460.000
|
$455.000
|
$455.000
|
$600.000
|
$1,214.110
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$550.000
|
$820.000
|
$530.000
|
$750.000
|
$735.000
|
$735.000
|
$720.000
|
$1,516.370
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
|
EA
|
1.000
|
$750.000
|
$850.000
|
$630.000
|
$750.000
|
$720.000
|
$720.000
|
$1,000.000
|
$2,100.760
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
293.700
|
$5.000
|
$10.000
|
$9.400
|
$5.000
|
$4.850
|
$4.850
|
$7.000
|
$8.060
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$2,000.000
|
$2,000.000
|
$3,300.000
|
$500.000
|
$500.000
|
$500.000
|
$1,100.000
|
$1,062.970
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
6.000
|
$40.000
|
$40.000
|
$20.700
|
$35.000
|
$32.000
|
$32.000
|
$40.000
|
$34.020
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,276.000
|
$1.100
|
$2.000
|
$0.800
|
$1.500
|
$0.850
|
$2.750
|
$0.850
|
$1.420
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
9,481.000
|
$0.800
|
$1.300
|
$0.700
|
$1.000
|
$0.850
|
$2.150
|
$0.850
|
$0.940
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
840.000
|
$1.200
|
$2.000
|
$1.300
|
$2.000
|
$1.750
|
$4.000
|
$1.750
|
$1.840
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
7,702.000
|
$0.800
|
$1.200
|
$0.750
|
$1.000
|
$0.850
|
$2.110
|
$0.850
|
$0.940
|
|
|
WK ZN PAV MRK REMOV (Y)8"(SLD)
|
LF
|
717.000
|
$1.800
|
$2.200
|
$2.400
|
$0.250
|
$1.750
|
$4.250
|
$1.750
|
$1.840
|
|
|
WK ZN PAV MRK REMOV (Y)12"(SLD)
|
LF
|
272.000
|
$2.000
|
$4.250
|
$2.500
|
$4.000
|
$5.000
|
$7.100
|
$5.000
|
$4.040
|
|
REFL PAV MRKR TY I-A
|
EA
|
21.000
|
$5.300
|
$7.000
|
$5.800
|
$6.000
|
$6.000
|
$7.250
|
$6.000
|
$6.120
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
84.000
|
$4.500
|
$7.000
|
$4.800
|
$6.000
|
$6.000
|
$7.250
|
$6.000
|
$6.120
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,406.000
|
$0.400
|
$0.500
|
$0.550
|
$0.350
|
$1.000
|
$1.250
|
$1.000
|
$0.330
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,377.000
|
$0.600
|
$0.900
|
$0.700
|
$0.750
|
$1.250
|
$1.500
|
$1.250
|
$0.710
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
241.000
|
$0.900
|
$1.500
|
$1.050
|
$1.250
|
$2.500
|
$1.780
|
$2.500
|
$1.220
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,731.000
|
$0.100
|
$0.100
|
$0.060
|
$0.010
|
$0.010
|
$0.500
|
$0.010
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,340.000
|
$0.100
|
$0.100
|
$0.070
|
$0.010
|
$0.020
|
$1.100
|
$0.020
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
283.000
|
$0.100
|
$0.100
|
$0.180
|
$0.010
|
$0.030
|
$1.500
|
$0.030
|
$0.010
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
2.260
|
$10,000.000
|
$2,000.000
|
$9,000.000
|
$5,000.000
|
$290,000.000
|
$10,480.350
|
$12,000.000
|
$15,500.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
95.750
|
$612.000
|
$165.000
|
$700.000
|
$850.000
|
$500.000
|
$613.480
|
$800.000
|
$530.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
23.000
|
$100.000
|
$500.000
|
$61.000
|
$75.000
|
$65.000
|
$427.510
|
$23.000
|
$62.460
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
2,084.000
|
$0.700
|
$1.500
|
$0.700
|
$1.250
|
$0.850
|
$0.800
|
$0.850
|
$1.280
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
860.000
|
$0.700
|
$1.500
|
$0.850
|
$1.250
|
$0.850
|
$0.850
|
$0.850
|
$1.280
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
845.000
|
$1.000
|
$2.000
|
$1.400
|
$1.750
|
$0.950
|
$1.100
|
$0.950
|
$1.790
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
1,927.000
|
$1.000
|
$1.500
|
$0.700
|
$1.250
|
$0.850
|
$0.800
|
$0.850
|
$1.280
|
|
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
|
LF
|
495.000
|
$1.500
|
$2.000
|
$0.700
|
$1.750
|
$0.950
|
$1.150
|
$0.950
|
$1.790
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
283.000
|
$3.250
|
$5.000
|
$1.300
|
$4.250
|
$8.000
|
$3.250
|
$8.000
|
$4.340
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
860.000
|
$1.000
|
$2.000
|
$0.900
|
$1.950
|
$0.950
|
$1.250
|
$0.950
|
$1.990
|
|
|
TMA (STATIONARY)
|
DAY
|
708.000
|
$200.000
|
$200.000
|
$150.000
|
$170.000
|
$250.000
|
$153.920
|
$93.000
|
$220.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
8.000
|
$65.000
|
$100.000
|
$250.000
|
$50.000
|
$100.000
|
$869.270
|
$53.000
|
$70.000
|
|
Totals: |
$5,866,750.627
|
$6,683,533.800
|
$7,471,939.650
|
$7,669,149.140
|
$7,787,946.495
|
$8,133,363.606
|
$8,558,683.420
|
$11,303,813.253
|