SALV, HAUL & STKPL RCL APH PV (0"TO 4")
|
SY
|
41,963.000
|
$2.000
|
$6.300
|
$7.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
13,428.000
|
$3.020
|
$3.000
|
$5.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
322.000
|
$104.500
|
$180.000
|
$180.000
|
|
|
FLEX PAVE STRUCTURE REPAIR (8"-10")
|
SY
|
100.000
|
$59.080
|
$100.000
|
$190.000
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
132.000
|
$20.000
|
$16.000
|
$90.000
|
|
|
FULL - DEPTH REPAIR CPJR (9")
|
SY
|
100.000
|
$413.380
|
$500.000
|
$800.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
132.000
|
$25.460
|
$50.000
|
$80.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
13.000
|
$278.040
|
$285.000
|
$700.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$113,845.430
|
$68,000.000
|
$150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$6,500.000
|
$3,000.000
|
$12,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
310.000
|
$3.490
|
$3.250
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
310.000
|
$0.410
|
$1.750
|
$4.000
|
|
|
CONDT (PVC) (SCH 80) (1 1/4")
|
LF
|
240.000
|
$7.870
|
$8.250
|
$9.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,130.000
|
$9.240
|
$12.650
|
$12.500
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
250.000
|
$12.000
|
$15.500
|
$17.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
40.000
|
$15.570
|
$25.000
|
$27.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,170.000
|
$1.250
|
$2.100
|
$2.200
|
|
|
GROUND BOX TY D (162922)
|
EA
|
9.000
|
$840.000
|
$1,100.000
|
$1,100.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
4.000
|
$968.050
|
$1,300.000
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$470.210
|
$528.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
3.000
|
$584.350
|
$580.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
23.000
|
$476.430
|
$670.000
|
$700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$88.350
|
$82.500
|
$100.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
1.000
|
$200.000
|
$420.000
|
$500.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
1.000
|
$200.000
|
$420.000
|
$500.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
12,589.000
|
$1.000
|
$0.200
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
212.000
|
$8.400
|
$8.000
|
$7.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,910.000
|
$0.990
|
$1.750
|
$1.200
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
111.000
|
$2.750
|
$4.400
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,506.000
|
$5.470
|
$8.800
|
$8.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
3,018.000
|
$0.600
|
$1.450
|
$1.000
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
203.000
|
$0.870
|
$1.650
|
$2.000
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
3,806.000
|
$0.890
|
$1.650
|
$2.000
|
|
REFL PAV MRK TY II (Y) 24" (SLD)
|
LF
|
206.000
|
$2.720
|
$3.300
|
$5.000
|
|
REFL PAV MRK TY II (Y) 36" (SLD)
|
LF
|
989.000
|
$3.720
|
$4.400
|
$7.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
3,018.000
|
$0.530
|
$1.650
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,591.000
|
$0.500
|
$1.650
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
22.000
|
$0.530
|
$3.300
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
18.000
|
$202.920
|
$270.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$337.140
|
$292.000
|
$600.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
18.000
|
$248.590
|
$281.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$550.540
|
$523.000
|
$800.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
357.000
|
$4.330
|
$6.600
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
681.000
|
$1.070
|
$1.400
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
155.000
|
$1.660
|
$2.500
|
$1.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
9,649.000
|
$0.160
|
$0.030
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,910.000
|
$0.110
|
$0.040
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
3,917.000
|
$0.170
|
$0.070
|
$0.080
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,712.000
|
$0.330
|
$0.130
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
18.000
|
$12.110
|
$5.500
|
$22.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$12.860
|
$5.500
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
18.000
|
$12.110
|
$5.500
|
$22.000
|
|
|
PAV SURF PREP FOR MRK (ISLAND)
|
SF
|
2,967.000
|
$0.050
|
$0.070
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
2.000
|
$16.000
|
$11.000
|
$75.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
5,385.000
|
$1.200
|
$1.700
|
$1.750
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
955.000
|
$9.250
|
$11.250
|
$11.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
2,596.000
|
$90.000
|
$178.000
|
$175.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
4,616.000
|
$116.070
|
$210.000
|
$195.000
|
|
|
BONDING COURSE
|
GAL
|
4,197.000
|
$6.000
|
$5.500
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$68.120
|
$50.000
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
180.000
|
$266.050
|
$300.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
90.000
|
$378.050
|
$100.000
|
$75.000
|
|
|
VIVDS CAM ASSY FXD LNS
|
EA
|
1.000
|
$1,776.640
|
$2,100.000
|
$2,000.000
|
|
|
VIVDS CABLING
|
LF
|
310.000
|
$4.010
|
$3.150
|
$3.000
|
|
Totals: |
$1,368,426.110
|
$2,198,720.360
|
$2,387,650.780
|