County: HARRIS Highway: US 90 Date: 04/03/2018 (6 years ago) Engineer's Estimate: $1,878,041 Control Number: 0028-02-092
Project: NH 2018(415) District: HOUSTON Time: 375 WORKING DAYS Type: INSTALLATION OF ITS EQUIPMENT & INFRASTRUCTURE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,878,041.06
TRAF-TEX, INC.   $1,782,760.65 1
-5.07% | -$95,280.41
FLORIDA TRAFFIC CONTROL DEVICES, INC.   $2,124,296.84 2
13.11% | $246,255.78
19.16% | $341,536.19
SICE, INC.   $2,247,054.03 3
19.65% | $369,012.97
26.04% | $464,293.38
5.78% | $122,757.19
Subcontractor Percentage Amount
SPECIALTY DRILLING, LLC 1.67% $29,772.10
Total: 1.67% $29,772.10

Bid Items

Items: 52, 0 filtered
HARRIS US 90  |  HOUSTON  |  0028-02-092  |  04/03/2018  |  $1,878,041  |  NH 2018(415)  |  INSTL OF ITS EQUIPMENT & INFRASTRUCT  |  375 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TRAF-TEX, INC. FLORIDA TRAFFIC CONTROL DEVICES, INC. SICE, INC.
416 6005 DRILL SHAFT (42 IN) LF 135.000 $200.000 $325.000 $483.610 $352.270
416 6006 DRILL SHAFT (48 IN) LF 75.000 $200.000 $367.000 $492.170 $461.680
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 27.000 $499.770 $405.000 $695.940 $841.610
500 6001 MOBILIZATION LS 1.000 $166,670.330 $75,100.000 $86,187.860 $203,747.070
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 18.000 $2,037.080 $2,940.000 $5,316.590 $7,881.740
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,000.000 $2.300 $3.250 $3.480 $3.310
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,000.000 $1.000 $0.550 $1.160 $1.620
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 525.000 $22.410 $25.150 $20.880 $28.860
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 3.000 $1,152.510 $1,056.000 $1,275.880 $1,382.640
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 3.000 $3,208.640 $2,623.500 $3,131.720 $3,186.090
618 6023 CONDT (PVC) (SCH 40) (2") LF 9,010.000 $7.110 $8.300 $13.420 $7.640
618 6031 CONDT (PVC) (SCH 40) (3") (CONC ENCSE) LF 10,700.000 $6.760 $7.050 $10.070 $8.290
618 6046 CONDT (PVC) (SCH 80) (2") LF 510.000 $6.250 $6.450 $9.020 $4.170
618 6047 CONDT (PVC) (SCH 80) (2") (BORE) LF 1,785.000 $12.050 $19.900 $52.020 $22.800
618 6053 CONDT (PVC) (SCH 80) (3") LF 275.000 $13.600 $10.400 $9.910 $4.940
618 6054 CONDT (PVC) (SCH 80) (3") (BORE) LF 665.000 $20.120 $16.750 $25.090 $36.390
618 6058 CONDT (PVC) (SCH 80) (4") LF 100.000 $12.560 $13.250 $13.490 $9.090
618 6070 CONDT (RM) (2") LF 245.000 $20.300 $26.900 $18.930 $60.680
618 6074 CONDT (RM) (3") LF 1,165.000 $29.070 $51.450 $41.810 $37.230
620 6002 ELEC CONDR (NO.14) INSULATED LF 38,120.000 $0.700 $0.620 $0.800 $0.710
620 6007 ELEC CONDR (NO.8) BARE LF 2,520.000 $0.940 $0.750 $1.000 $0.850
620 6008 ELEC CONDR (NO.8) INSULATED LF 2,525.000 $1.280 $0.850 $1.100 $0.990
620 6011 ELEC CONDR (NO.4) BARE LF 835.000 $1.520 $1.550 $1.550 $1.230
620 6012 ELEC CONDR (NO.4) INSULATED LF 1,670.000 $1.620 $1.700 $1.590 $1.410
620 6015 ELEC CONDR (NO.2) BARE LF 7,435.000 $2.910 $1.650 $1.810 $1.610
620 6016 ELEC CONDR (NO.2) INSULATED LF 21,535.000 $2.920 $1.850 $1.870 $1.830
621 6003 TRAY CABLE (3 CONDR) (10 AWG) LF 6,240.000 $2.000 $2.400 $1.910 $1.330
624 6001 GROUND BOX TY A (122311) EA 43.000 $750.000 $534.000 $430.530 $920.880
628 6250 ELC SRV TY D 120/240 100(NS)SS(N)SP(O) EA 9.000 $4,839.660 $2,787.000 $3,544.210 $3,228.170
650 6021 INS OH SN SUP(25 FT BAL TEE) EA 2.000 $17,000.000 $17,605.000 $17,503.940 $20,120.470
650 6028 INS OH SN SUP(30 FT BAL TEE) EA 1.000 $25,000.000 $19,855.000 $19,887.320 $22,549.110
654 6004 SIGN WALKWAY (36 IN) WITH HNDRL LF 75.000 $140.000 $234.000 $299.790 $263.300
687 6001 PED POLE ASSEMBLY EA 2.000 $1,944.190 $1,857.000 $3,156.470 $3,877.610
6003 6001 ITS SYSTEM SUPPORT EQUIPMENT LS 1.000 $16,705.000 $15,115.000 $13,076.630 $49,343.550
6007 6010 FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER) LF 50,695.000 $1.720 $2.200 $3.150 $0.710
6007 6017 FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER) LF 36,215.000 $4.440 $3.050 $4.180 $2.260
6007 6027 FIBER OPTIC PATCH PANEL (144 POSITION) EA 5.000 $11,749.070 $5,573.000 $1,451.280 $326.950
6007 6094 FIBER OPTIC FUSION SPLICE EA 492.000 $25.000 $17.150 $30.340 $44.280
6010 6001 CCTV FIELD EQUIPMENT (ANALOG) EA 9.000 $9,794.090 $14,120.000 $8,396.180 $8,779.190
6016 6008 ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE) LF 10,920.000 $12.870 $10.850 $13.760 $22.710
6016 6011 ITS MULTI-DUCT CND (PVC-80)(BORE) LF 240.000 $30.250 $21.800 $125.910 $34.330
6016 6013 ITS MULTI-DUCT CND (RMC) LF 1,165.000 $55.140 $63.550 $68.060 $66.870
6017 6001 COMMUNICATION HUB BUILDING EA 3.000 $15,000.000 $27,745.000 $26,500.210 $40,140.350
6027 6003 CONDUIT (PREPARE) LF 85,370.000 $1.210 $0.460 $1.090 $1.440
6028 6002 INSTALL DMS (FOUNDATION MTD CABINET) EA 3.000 $17,313.580 $13,150.000 $7,831.110 $17,066.630
6029 6001 RADAR VEHICLE SENSING DEVICE EA 2.000 $9,048.070 $9,345.000 $7,967.860 $7,225.820
6033 6006 CTMS RELOCATION (MVD) EA 1.000 $7,500.000 $3,605.000 $1,686.070 $13,225.290
6035 6001 FIBER OPTIC VIDEO DATA TRANSMITTER EA 9.000 $1,425.000 $1,375.000 $1,238.350 $1,455.450
6035 6002 FIBER OPTIC VIDEO DATA RECEIVER EA 9.000 $1,425.000 $1,375.000 $1,238.350 $1,455.450
6064 6047 ITS POLE (55 FT)(110 MPH) EA 9.000 $14,000.000 $15,973.000 $17,078.060 $18,829.230
6064 6084 ITS POLE MNT CAB (TY 2)(CONF 2) EA 9.000 $5,726.410 $7,620.000 $5,578.010 $6,913.220
6186 6002 ITS GND BOX(PCAST) TY 1 (243636)W/APRN EA 10.000 $2,205.440 $2,685.000 $2,671.270 $3,516.720
Totals: $1,878,041.06 $1,782,760.65 $2,124,296.84 $2,247,054.03