Job Info for 2952-01-009

County: HARDIN Highway: FM 2937 Date: 06/05/2024 (5 months ago) Engineer's Estimate: $9,527,630 Control Number: 2952-01-009
Project: C 2952-1-9 District: BEAUMONT Time: 133 WORKING DAYS Type: WIDEN ROAD - ADD SHOULDERS
Bidder's List

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $9,527,630.17
TEXAS MATERIALS GROUP, INC.   $8,441,473.15 1
-11.4% | -$1,086,157.02
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.   $8,541,944.82 2
-10.35% | -$985,685.35
1.19% | $100,471.67
SELECT MAINTENANCE, L.L.C.   $11,246,203.04 3
18.04% | $1,718,572.87
33.23% | $2,804,729.89
31.66% | $2,704,258.22
Subcontractor Percentage Amount
NORMAN HIGHWAY CONSTRUCTORS, INC. 6.65% $561,357.96
TRAFFIC SIGNS & LINES, LLC 4.13% $348,632.84
LONG LEGACY ENTERPRISES, LLC 2.23% $188,244.85
J. H. ODEN CONTRACTING COMPANY 0.40% $33,765.89
WEST TEXAS ROCK RESOURCES, LLC 0.11% $9,285.62
Total: 13.52% $1,141,287.16

Bid Items

Items: 78, 0 filtered
HARDIN FM 2937  |  BEAUMONT  |  2952-01-009  |  06/05/2024  |  $9,527,630  |  C 2952-1-9  |  WIDEN ROAD - ADD SHOULDERS  |  133 WORKING DAYS
Alt Item code Description Unit Quantity Engineer's Estimate TEXAS MATERIALS GROUP, INC. CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. SELECT MAINTENANCE, L.L.C.
100 6002 PREPARING ROW STA 137.000 $1,500.000 $2,000.000 $3,015.000 $5,383.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 106.000 $72.200 $320.000 $100.000 $50.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 308.000 $380.300 $720.000 $662.000 $310.000
134 6004 BACKFILL (TY A OR B) STA 308.000 $233.200 $300.000 $300.000 $300.000
150 6003 BLADING LF 1,900.000 $5.200 $60.000 $7.000 $5.000
164 6011 BROADCAST SEED (TEMP) (COOL) SY 43,426.000 $0.240 $0.450 $0.150 $0.130
164 6021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 43,426.000 $2.000 $0.600 $0.460 $0.370
168 6001 VEGETATIVE WATERING MG 367.000 $29.400 $20.000 $10.000 $35.000
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 16,914.000 $200.000 $130.000 $149.250 $165.000
251 6034 REWORK BS MTL (TY C) (8") (ORD COMP) SY 61,569.000 $2.000 $4.250 $1.950 $10.000
275 6001 CEMENT TON 736.000 $321.400 $330.000 $360.000 $287.000
275 6014 CEMENT TREAT (MX EXST MTL & NW BS)(8") SY 99,517.000 $4.200 $3.000 $2.410 $4.250
316 6029 ASPH (RC-250) GAL 19,790.000 $5.300 $6.250 $8.500 $7.000
316 6210 AGGR(TY-L GR-5 SAC-B) CY 792.000 $244.200 $245.000 $139.750 $160.000
400 6005 CEM STABIL BKFL CY 72.000 $168.600 $270.000 $250.000 $200.000
400 6015 CEM STABIL BKFL (SPL) CY 90.000 $168.600 $270.000 $250.000 $200.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 36.000 $424.000 $210.000 $200.000 $350.000
462 6050 CONC BOX CULV (5 FT X 2 FT)(EXTEND) LF 16.000 $1,330.000 $930.000 $850.000 $1,200.000
462 6053 CONC BOX CULV (5 FT X 5 FT)(EXTEND) LF 8.000 $570.000 $1,300.000 $1,200.000 $1,500.000
464 6003 RC PIPE (CL III)(18 IN) LF 24.000 $80.000 $75.000 $70.000 $165.000
464 6005 RC PIPE (CL III)(24 IN) LF 84.000 $120.000 $160.000 $150.000 $210.000
466 6003 HEADWALL (CH - FW - 0) (DIA= 18 IN) EA 1.000 $6,670.000 $4,900.000 $4,500.000 $12,000.000
466 6095 HEADWALL (CH - PW - 0) (DIA= 18 IN) EA 1.000 $6,670.000 $6,200.000 $6,000.000 $12,000.000
467 6172 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) EA 4.000 $9,600.000 $13,000.000 $12,000.000 $12,000.000
467 6186 SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C) EA 2.000 $19,830.000 $16,000.000 $15,000.000 $15,000.000
467 6319 SET (TY II) (12 IN) (CMP) (6: 1) (P) EA 2.000 $744.100 $975.000 $900.000 $900.000
467 6326 SET (TY II) (12 IN) (RCP) (6: 1) (P) EA 2.000 $612.000 $975.000 $900.000 $1,500.000
467 6341 SET (TY II) (15 IN) (RCP) (6: 1) (P) EA 4.000 $925.700 $1,000.000 $950.000 $1,600.000
467 6348 SET (TY II) (18 IN) (CMP) (6: 1) (P) EA 16.000 $1,343.800 $1,050.000 $1,000.000 $1,100.000
467 6351 SET (TY II) (18 IN) (HDPE) (6: 1) (P) EA 4.000 $1,848.000 $1,050.000 $1,000.000 $1,100.000
467 6358 SET (TY II) (18 IN) (RCP) (4: 1) (C) EA 6.000 $1,268.500 $1,000.000 $950.000 $1,500.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 150.000 $1,848.000 $1,000.000 $1,000.000 $1,500.000
467 6373 SET (TY II) (21 IN) (RCP) (6: 1) (C) EA 2.000 $1,800.000 $1,600.000 $1,500.000 $1,500.000
467 6384 SET (TY II) (24 IN) (HDPE) (6: 1) (P) EA 4.000 $2,500.000 $2,700.000 $2,500.000 $1,500.000
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 30.000 $2,413.600 $1,600.000 $1,500.000 $1,500.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 22.000 $2,500.000 $2,700.000 $2,500.000 $1,500.000
467 6419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 2.000 $3,520.000 $3,200.000 $3,000.000 $2,800.000
467 6463 SET (TY II) (42 IN) (RCP) (4: 1) (C) EA 2.000 $5,862.400 $4,900.000 $4,500.000 $5,100.000
496 6005 REMOV STR (WINGWALL) EA 4.000 $1,064.800 $2,100.000 $2,000.000 $3,500.000
496 6006 REMOV STR (HEADWALL) EA 4.000 $2,515.800 $2,100.000 $2,000.000 $3,500.000
496 6007 REMOV STR (PIPE) LF 275.000 $37.900 $65.000 $60.000 $40.000
500 6001 MOBILIZATION LS 1.000 $866,148.000 $720,200.000 $700,000.000 $1,100,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 9.000 $7,450.000 $4,000.000 $7,500.000 $40,000.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 1,064.000 $6.400 $8.500 $6.500 $5.670
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 1,064.000 $1.200 $2.100 $1.000 $1.430
530 6004 DRIVEWAYS (CONC) SY 77.000 $184.300 $270.000 $250.000 $250.000
530 6005 DRIVEWAYS (ACP) SY 2,100.000 $54.500 $80.000 $90.450 $125.000
530 6016 DRIVEWAYS (BASE) SY 6,872.000 $43.100 $37.000 $72.150 $40.000
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 29,602.000 $0.200 $0.850 $0.100 $0.320
560 6003 MAILBOX INSTALL-M (TWG-POST) TY 1 EA 27.000 $495.600 $620.000 $425.000 $565.000
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 39.000 $311.700 $250.000 $185.000 $230.000
560 6012 MAILBOX INSTALL-D (TWW-POST) TY 4 EA 19.000 $323.500 $280.000 $210.000 $265.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 12.000 $609.200 $500.000 $575.000 $465.000
644 6002 IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) EA 23.000 $967.800 $575.000 $650.000 $530.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 $892.500 $980.000 $900.000 $860.000
644 6076 REMOVE SM RD SN SUP&AM EA 34.000 $102.400 $100.000 $75.000 $75.000
658 6010 INSTL DEL ASSM (D-SW)SZ 2(WC)GND EA 2.000 $56.000 $100.000 $65.000 $93.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 28.000 $26.300 $90.000 $20.000 $20.000
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 38.000 $85.000 $85.000 $60.000 $87.500
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 29,602.000 $0.340 $0.700 $0.490 $0.550
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 2,400.000 $2.100 $32.000 $1.000 $1.000
666 6285 REF PROF PAV MRK TY I(W)6"(SLD)(090MIL) LF 54,857.000 $1.200 $1.500 $0.930 $1.150
666 6317 RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) LF 4,170.000 $0.610 $1.000 $0.550 $0.680
666 6320 RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) LF 31,379.000 $0.550 $0.900 $0.550 $0.650
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 310.000 $12.200 $18.000 $12.000 $18.900
672 6009 REFL PAV MRKR TY II-A-A EA 432.000 $6.200 $8.500 $6.000 $6.000
730 6002 FULL - WIDTH MOWING AC 52.000 $1,500.000 $775.000 $950.000 $80.000
734 6001 LITTER REMOVAL AC 52.000 $111.000 $225.000 $200.000 $80.000
3077 6033 SP MIXES SP-C SAC-A PG76-22 TON 10,817.000 $180.000 $180.000 $183.000 $263.950
3077 6075 TACK COAT GAL 5,900.000 $5.500 $7.500 $5.000 $8.500
4216 6001 THERMOPLASTIC PIPE (PP) (18") LF 292.000 $80.000 $0.000 $0.000 $0.000
4216 6002 THERMOPLASTIC PIPE (PP) (24") LF 4.000 $120.000 $0.000 $0.000 $0.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 266.000 $100.000 $170.000 $75.000 $115.000
6185 6002 TMA (STATIONARY) DAY 133.000 $277.400 $315.000 $100.000 $200.000
6185 6005 TMA (MOBILE OPERATION) DAY 266.000 $288.800 $170.000 $100.000 $300.000
6227 6001 SOLAR POWERED LED WARNING SIGN EA 24.000 $4,000.000 $3,000.000 $2,300.000 $2,600.000
1 464 6087 RC PIPE (CL III)(18 IN)(ALT) LF 292.000 $80.000 $75.000 $70.000 $140.000
2 464 6085 RC PIPE (CL III) (24 IN) (ALT) LF 4.000 $120.000 $160.000 $150.000 $315.000
Totals: $9,551,470.17 $8,441,473.15 $8,541,944.82 $11,246,203.04