Job Info for 1096-01-068

County: HARDIN Highway: FM 770 Date: 09/06/2023 (1 year ago) Engineer's Estimate: $5,134,746 Control Number: 1096-01-068
Project: F 2024(036) District: BEAUMONT Time: 88 WORKING DAYS Type: SURFACING/ROADWAY RESTORATION
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $5,134,746.10
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC   $4,123,742.89 1
-19.69% | -$1,011,003.21
TEXAS MATERIALS GROUP, INC.   $5,417,709.15 2
5.51% | $282,963.05
31.38% | $1,293,966.26
FNH CONSTRUCTION, LLC   $6,351,786.50 3
23.7% | $1,217,040.40
54.03% | $2,228,043.61
17.24% | $934,077.35
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 10.98% $452,786.97
BATTERSON, LLP 4.93% $203,300.52
MURRAY CONSTRUCTION 1.02% $42,062.18
SUPERIOR TRAFFIC CONTROL, LLC 0.20% $8,247.49
PROFESSIONAL TRAFFIC CONTROL LLC 0.17% $7,010.36
AWP SAFETY 0.08% $3,298.99
SOUTHWEST ENVIRONMENT SERVICES LLC 0.05% $2,061.87
Total: 17.43% $718,768.38

Bid Items

Items: 44, 0 filtered
HARDIN FM 770  |  BEAUMONT  |  1096-01-068  |  09/06/2023  |  $5,134,746  |  F 2024(036)  |  SURF/ROADWAY RESTOR  |  88 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC TEXAS MATERIALS GROUP, INC. FNH CONSTRUCTION, LLC
134 6002 BACKFILL (TY B) STA 60.000 $325.000 $358.580 $525.000 $450.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 4,083.000 $0.500 $0.780 $0.400 $1.000
168 6001 VEGETATIVE WATERING MG 5.800 $16.000 $696.060 $440.000 $1,000.000
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 250.000 $120.000 $112.450 $218.000 $100.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 11,191.000 $3.700 $2.670 $3.350 $7.000
354 6045 PLANE ASPH CONC PAV (2") SY 110,555.000 $4.200 $1.620 $2.770 $6.500
354 6051 PLANE ASPH CONC PAV (0" TO 1 1/2") SY 1,173.000 $2.500 $4.230 $3.350 $10.000
354 6089 PLANE ASPH CONC PAV(1" TO 2") SY 898.000 $4.000 $3.510 $3.350 $10.000
361 6082 FULL - DEPTH REPAIR CPCD (6"-9") SY 900.000 $500.000 $450.300 $545.000 $450.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 2,000.000 $5.500 $9.540 $13.000 $100.000
500 6001 MOBILIZATION LS 1.000 $467,294.000 $82,144.620 $415,000.000 $600,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $6,000.000 $24,930.940 $3,500.000 $8,500.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 300.000 $1.700 $2.840 $1.000 $4.000
506 6047 TEMP SDMT CONT FENCE (INLET PROTECTION) LF 300.000 $11.000 $4.780 $10.000 $2.000
530 6004 DRIVEWAYS (CONC) SY 122.000 $170.000 $264.880 $187.000 $85.000
530 6005 DRIVEWAYS (ACP) SY 4,977.000 $50.000 $33.030 $56.000 $55.000
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 40,286.000 $0.600 $0.070 $0.650 $0.500
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 47.000 $270.000 $196.010 $309.000 $1,000.000
560 6005 MAILBOX INSTALL-D (TWG-POST) TY 2 EA 3.000 $270.000 $254.290 $309.000 $1,000.000
560 6006 MAILBOX INSTALL-M (TWG-POST) TY 2 EA 1.000 $520.000 $529.760 $618.000 $1,000.000
644 6009 IN SM RD SN SUP&AM TY10BWG(1)SB(P) EA 37.000 $600.000 $635.710 $798.000 $1,500.000
644 6012 IN SM RD SN SUP&AM TY10BWG(1)SB(T) EA 3.000 $1,100.000 $821.130 $103.000 $1,500.000
644 6015 IN SM RD SN SUP&AM TY10BWG(1)SB(U) EA 3.000 $1,350.000 $874.110 $1,086.000 $1,500.000
644 6044 IN SM RD SN SUP&AM TYS80(1)SB(U) EA 1.000 $1,175.000 $1,006.550 $1,189.000 $1,500.000
644 6076 REMOVE SM RD SN SUP&AM EA 44.000 $110.000 $105.950 $154.000 $100.000
662 6005 WK ZN PAV MRK NON-REMOV (W)6"(BRK) LF 810.000 $0.850 $0.410 $0.400 $2.000
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 88,305.000 $0.500 $0.410 $0.400 $1.000
662 6035 WK ZN PAV MRK NON-REMOV (Y)6"(BRK) LF 9,010.000 $0.850 $0.410 $0.400 $1.000
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 52,760.000 $0.800 $0.410 $0.400 $1.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 242.000 $2.000 $0.880 $3.200 $6.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 5,340.000 $2.600 $0.780 $2.300 $6.000
666 6285 REF PROF PAV MRK TY I(W)6"(SLD)(090MIL) LF 88,305.000 $1.200 $1.170 $1.130 $2.000
666 6305 RE PM W/RET REQ TY I (W)6"(BRK)(090MIL) LF 810.000 $0.750 $0.640 $0.620 $1.500
666 6317 RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) LF 9,010.000 $0.750 $0.640 $0.620 $1.500
666 6320 RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) LF 52,760.000 $0.750 $0.640 $0.620 $1.500
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 252.000 $13.000 $14.830 $14.000 $25.000
672 6007 REFL PAV MRKR TY I-C EA 32.000 $5.000 $6.890 $6.700 $7.000
672 6009 REFL PAV MRKR TY II-A-A EA 991.000 $5.500 $6.890 $6.700 $7.000
3076 6037 D-GR HMA TY-D SAC-B PG64-22 TON 981.000 $150.000 $126.220 $177.250 $165.000
3076 6066 TACK COAT GAL 596.000 $6.000 $6.340 $8.000 $8.000
3080 6001 STONE-MTRX-ASPH SMA-C SAC-A PG76-22 TON 15,351.000 $180.000 $164.130 $205.000 $200.000
3080 6029 TACK COAT GAL 7,305.000 $6.000 $6.180 $7.000 $8.000
6185 6002 TMA (STATIONARY) DAY 80.000 $350.000 $424.400 $326.000 $250.000
6185 6005 TMA (MOBILE OPERATION) DAY 8.000 $350.000 $59.600 $1,378.000 $550.000
Totals: $5,134,746.10 $4,123,742.90 $5,417,709.15 $6,351,786.50