Show Job Controls
Bid Cobra

HARDIN CR (0920-03-034)

Items: 43

County: HARDIN
Length: N/A
Highway: CR
District: BEAUMONT
Control Number: 0920-03-034
DBE Goal: N/A
Project: BR 93(356)
Guaranty: N/A
Time: 105 WORKING DAYS
Engineer's Estimate: $710,136.00
Date: 08/08/2018 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$710,136.00
$586,641.70
Over/Under Est: -17.39% -$123,494.30
Over/Under Est: -5.78% -$41,057.50
Amt Left: 14.05% $82,436.80
Over/Under Est: 11.59% $82,304.40
Amt Left: 35.08% $205,798.70
Delta: -18.44% -$123,361.90
$1,067,017.00
Over/Under Est: 50.26% $356,881.00
Amt Left: 81.89% $480,375.30
Delta: -34.65% -$274,576.60

Bid Items & Bid Tabulations

43 Total 0 of 43
HARDIN  |  CR  |  BEAUMONT  |  0920-03-034  |  08/08/2018  |  $710,136.00  |  BR 93(356)  |  REPLACE BRIDGE  |  105 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATELINE CONSTRUCTION, LLC
OLDCASTLE MATERIALS TEXAS, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
L.C. JORDAN & SON
PREPARING ROW
STA 5.500 $5,000.000 $2,500.000 $8,800.000 $14,000.000 $3,500.000
PREP ROW (TREE) (18"-36" DIA.)
EA 8.000 $3,000.000 $475.000 $700.000 $2,000.000 $750.000
OBLITERATING ABANDONED ROAD
SY 327.000 $3.000 $15.000 $24.000 $10.000 $30.000
EXCAVATION (ROADWAY)
CY 123.000 $20.000 $15.000 $25.000 $20.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 926.000 $40.000 $17.000 $28.000 $30.000 $45.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,120.000 $3.000 $4.000 $4.500 $4.000 $5.000
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 2,120.000 $0.500 $0.500 $0.500 $0.600 $6.000
DRILL SEEDING (TEMP) (WARM)
SY 1,060.000 $0.300 $0.500 $0.500 $0.500 $2.000
DRILL SEEDING (TEMP) (COOL)
SY 1,060.000 $0.300 $0.500 $0.500 $0.500 $2.000
VEGETATIVE WATERING
MG 72.000 $25.000 $10.000 $29.000 $50.000 $200.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 2,120.000 $1.500 $1.250 $0.850 $1.000 $3.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 277.000 $100.000 $86.000 $118.000 $115.000 $200.000
PRIME COAT (RC-250)
GAL 199.000 $5.000 $7.000 $9.500 $25.000 $17.000
ASPH (AC-20XP)
GAL 738.000 $5.000 $8.000 $6.750 $12.000 $20.000
AGGR(TY-PB GR-4 SAC-A)
CY 20.000 $120.000 $700.000 $575.000 $425.000 $200.000
CEM STABIL BKFL
CY 82.500 $150.000 $260.000 $90.000 $200.000 $250.000
PRESTR CONC PIL (18 IN SQ)
LF 480.000 $130.000 $116.000 $105.000 $150.000 $250.000
CL C CONC (ABUT)
CY 29.400 $1,600.000 $990.000 $1,485.000 $1,400.000 $950.000
REINF CONC SLAB (BOX BEAM)
SF 1,832.000 $25.000 $18.100 $33.000 $20.000 $45.000
APPROACH SLAB
CY 37.200 $800.000 $675.000 $450.000 $580.000 $800.000
SHEAR KEY
CY 18.700 $300.000 $245.000 $375.000 $425.000 $500.000
PRESTR CONC BOX BEAM (5B20)
LF 139.000 $200.000 $211.000 $203.000 $355.000 $275.000
PRESTR CONC BOX BEAM (4B28)
LF 278.000 $200.000 $192.000 $203.000 $355.000 $275.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 182.000 $150.000 $135.000 $180.000 $240.000 $275.000
RIPRAP (MOW STRIP)(4 IN)
CY 19.000 $500.000 $435.000 $610.000 $550.000 $500.000
RAIL (TY T223)
LF 180.000 $160.000 $105.000 $160.000 $125.000 $225.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $12,000.000 $38,000.000 $25,000.000 $100,000.000
MOBILIZATION
LS 1.000 $80,000.000 $58,000.000 $43,300.000 $75,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,000.000 $3,000.000 $1,500.000 $1,200.000 $7,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $35.000 $25.000 $24.000 $24.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $10.000 $9.000 $7.250 $7.000 $5.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,084.000 $12.000 $6.000 $5.200 $5.500 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,084.000 $1.500 $2.000 $1.050 $1.100 $1.000
CONSTRUCTING DETOURS
SY 374.000 $55.000 $121.000 $88.000 $65.000 $90.000
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $25.000 $22.000 $26.000 $27.500 $30.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,200.000 $1,500.000 $925.000 $995.500 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,200.000 $1,200.000 $1,025.000 $1,089.000 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,300.000 $2,500.000 $2,300.000 $2,475.000 $2,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $500.000 $450.000 $570.000 $429.000 $700.000
REMOVE SM RD SN SUP&AM
EA 3.000 $150.000 $200.000 $86.000 $93.500 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $30.000 $25.000 $26.000 $16.500 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $30.000 $45.000 $31.000 $30.250 $100.000
TREE PROTECTION
EA 6.000 $400.000 $475.000 $430.000 $270.000 $1,000.000
Totals: $710,136.000 $586,641.700 $669,078.500 $792,440.400 $1,067,017.000