HARDIN US 69 (0065-06-070)

Items: 54

County: HARDIN
Length: N/A
Highway: US 69
District: BEAUMONT
Control Number: 0065-06-070
DBE Goal: N/A
Project: C 65-6-70
Guaranty: N/A
Time: 131 WORKING DAYS
Engineer's Estimate: $8,604,256.95
Date: 03/08/2023 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
DAVE COLLINS
TAYLOR KANE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$8,604,256.95
$12,495,080.67
Over/Under Est: 45.22% $3,890,823.72
Over/Under Est: 54.92% $4,725,041.56
Amt Left: 6.68% $834,217.84
Over/Under Est: 56.39% $4,851,921.88
Amt Left: 7.69% $961,098.16
Delta: -0.95% -$126,880.32
Subcontractor Percentage Amount
CPAVE, INC. 17.21% $1,981,645.61
THE TRUESDELL CORPORATION 13.44% $1,547,548.92
PENHALL COMPANY 7.18% $826,741.17
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. 7.08% $815,226.66
TRP CONSTRUCTION GROUP, LLC 2.15% $247,561.77
DUSTROL, INC. 0.63% $72,541.36
URETEK USA, INC. 0.44% $50,663.80
BARRICADES UNLIMITED 0.27% $31,089.15
Total: 48.40% $5,573,018.44

Bid Items & Bid Tabulations

54 Total 0 of 54
HARDIN  |  US 69  |  BEAUMONT  |  0065-06-070  |  03/08/2023  |  $8,604,256.95  |  C 65-6-70  |  SURF/ROADWAY RESTOR  |  131 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
RAGLE CONSTRUCTION, INC.
GIBSON & ASSOCIATES, INC.
REMOVING CONC (CURB)
LF 3,461.000 $15.000 $12.770 $25.000 $25.000
ASPH (AC-20-5TR)
GAL 96,918.000 $4.000 $5.050 $5.250 $5.340
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 1,923.000 $200.000 $178.000 $143.500 $186.230
PLAN & TEXT CONC PAV(0" TO 1")
SY 3,409.000 $1.000 $10.150 $8.800 $28.000
PLANE ASPH CONC PAV (1")
SY 22,558.000 $0.900 $3.650 $2.500 $4.240
FULL-DEPTH REPAIR CPCD (VAR DEPTH)
CY 160.000 $15.000 $1,750.000 $1,755.000 $3,000.000
FULL-DEPTH REPAIR CPJR (VAR DEPTH)
CY 160.000 $15.000 $1,850.000 $1,755.000 $3,000.000
CLEANING AND SEALING EXISTING JOINTS
LF 283,917.000 $1.250 $2.270 $2.620 $2.150
MULTI-LAYER POLYMER OVERLAY
SY 39,704.000 $40.000 $47.000 $50.000 $40.200
MOBILIZATION
LS 1.000 $1,120,350.000 $820,000.000 $1,300,000.000 $678,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $4,900.000 $65,000.000 $51,200.000
CONC CURB (TY I)
LF 110.000 $10.000 $129.000 $30.000 $86.500
CONC CURB (TY II)
LF 3,351.000 $7.000 $68.000 $30.000 $90.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 21,990.000 $0.250 $0.630 $0.390 $0.550
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 45,179.000 $0.350 $0.520 $0.390 $0.500
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 24,513.000 $0.500 $1.070 $0.550 $1.100
WK ZN PAV MRK NON-REMOV (W)12"(LNDP)
LF 980.000 $1.000 $3.440 $2.250 $3.300
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 443.000 $3.000 $8.600 $5.250 $8.250
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 38,349.000 $0.350 $0.470 $0.390 $0.440
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 200.000 $0.750 $8.050 $3.750 $8.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 15,920.000 $1.500 $3.100 $1.500 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,107.000 $1.250 $6.200 $1.500 $1.500
WK ZN PAV MRK NON-REMOV (W)12"(DOT)
LF 744.000 $0.600 $2.650 $3.250 $2.750
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 474.000 $1.250 $3.220 $2.000 $3.300
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 24,513.000 $1.080 $1.330 $1.350 $1.380
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
LF 980.000 $2.200 $3.750 $4.000 $3.850
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 21,990.000 $0.750 $0.730 $0.800 $0.770
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 45,179.000 $0.750 $0.690 $0.800 $0.720
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 38,349.000 $0.600 $0.690 $0.800 $0.720
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
LF 744.000 $2.250 $3.760 $4.000 $3.850
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 188.000 $15.000 $6.920 $11.000 $7.150
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 443.000 $20.000 $13.250 $15.000 $13.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 37.000 $233.150 $322.000 $250.000 $253.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 23.000 $250.000 $378.000 $350.000 $385.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 13.000 $275.000 $388.800 $350.000 $396.000
PREFAB PAV MRK TY C (W) (WORD)
EA 19.000 $336.490 $324.000 $275.000 $330.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 158.000 $24.000 $64.500 $50.000 $66.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 200.000 $20.000 $21.500 $15.000 $13.750
REFL PAV MRKR TY I-C
EA 140.000 $6.000 $8.600 $6.000 $5.500
REFL PAV MRKR TY II-C-R
EA 2,448.000 $6.000 $7.500 $4.000 $5.500
CRACK CLEANING AND SEALING (JCP)
LF 21,140.000 $6.000 $3.150 $2.620 $2.150
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 2,523.000 $100.000 $151.000 $165.000 $195.000
CONTINUOUS DIAMOND GRINDING CONC PVMT
SY 122,930.000 $6.000 $9.100 $6.320 $7.150
DOWEL BAR RETROFIT
EA 1,368.000 $160.000 $120.000 $97.000 $75.000
TACK COAT
GAL 444.000 $3.000 $24.000 $12.000 $13.310
D-GR HMA TY-D SAC-A PG76-22 (EXEMPT)
TON 306.000 $50.000 $350.000 $380.000 $331.240
PFC-C PG76-22 SAC-A
TON 11,224.000 $150.000 $251.000 $264.000 $290.400
TACK COAT
GAL 8,162.000 $3.000 $8.000 $12.000 $12.100
TOM-C PG76-22 SAC-A
TON 6,917.000 $160.000 $261.500 $275.000 $301.130
TACK COAT
GAL 7,546.000 $3.000 $10.500 $12.000 $14.300
SOIL DENS.AND RAISING CONC.SLABS(HDPF)
LB 8,764.000 $6.000 $16.200 $8.000 $6.050
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $12,300.000 $21,000.000 $15,000.000 $15,300.000
TMA (STATIONARY)
DAY 130.000 $250.000 $390.000 $650.000 $325.000
TMA (MOBILE OPERATION)
DAY 75.000 $400.000 $400.000 $250.000 $325.000
Totals: $8,604,256.950 $12,495,080.670 $13,329,298.510 $13,456,178.830