REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
3,665.000
|
$7.040
|
$30.000
|
$30.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
51.000
|
$13.000
|
$50.000
|
$25.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
367.000
|
$20.000
|
$35.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
1,729.000
|
$26.000
|
$35.000
|
$40.000
|
|
|
BLADING
|
HR
|
8.000
|
$188.050
|
$20.000
|
$120.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
0.740
|
$488.000
|
$6,800.000
|
$4,500.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
0.740
|
$471.000
|
$2,000.000
|
$4,500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
58.000
|
$18.880
|
$1.000
|
$50.000
|
|
|
PROOF ROLLING
|
HR
|
8.000
|
$130.000
|
$20.000
|
$120.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 3)(FNAL POS)
|
CY
|
1,372.000
|
$60.000
|
$80.000
|
$170.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
961.000
|
$6.000
|
$12.000
|
$12.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
716.000
|
$4.020
|
$12.000
|
$15.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
2,562.000
|
$5.000
|
$12.000
|
$8.000
|
|
|
AGGR (TY-B GR-4)
|
CY
|
52.000
|
$145.000
|
$800.000
|
$400.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
113.000
|
$210.000
|
$250.000
|
$400.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
60.000
|
$158.950
|
$100.000
|
$180.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
300.000
|
$338.000
|
$280.000
|
$500.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
8.000
|
$400.000
|
$375.000
|
$650.000
|
|
|
CL C CONC (ABUT)
|
CY
|
59.000
|
$1,689.000
|
$2,000.000
|
$2,700.000
|
|
|
REINF CONC SLAB
|
SF
|
4,370.000
|
$35.000
|
$46.000
|
$45.000
|
|
|
APPROACH SLAB
|
CY
|
73.800
|
$1,041.000
|
$1,000.000
|
$1,800.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
567.000
|
$185.300
|
$485.000
|
$320.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
668.000
|
$177.700
|
$160.000
|
$180.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
34.000
|
$706.000
|
$700.000
|
$650.000
|
|
|
RAIL (TY T223)
|
LF
|
250.000
|
$193.000
|
$180.000
|
$180.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
92.000
|
$223.000
|
$200.000
|
$250.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$26,323.000
|
$150,000.000
|
$50,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$110,000.000
|
$150,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$4,592.370
|
$12,500.000
|
$2,400.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
40.000
|
$65.060
|
$1.000
|
$150.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
40.000
|
$10.740
|
$1.000
|
$90.000
|
|
|
BULLDOZER WORK (EROSION & SEDMT CONT)
|
HR
|
16.000
|
$82.860
|
$1.000
|
$125.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,675.000
|
$5.950
|
$5.000
|
$6.500
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
125.000
|
$20.000
|
$95.000
|
$85.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
200.000
|
$34.600
|
$35.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,427.000
|
$2,500.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
120.000
|
$3.000
|
$4.000
|
$20.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,677.000
|
$3,500.000
|
$3,600.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$243.350
|
$500.000
|
$350.000
|
|
|
IN RD IL (TY SA) 40T-10 (250W EQ) LED
|
EA
|
1.000
|
$5,000.000
|
$4,000.000
|
$7,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
104.000
|
$12.000
|
$12.000
|
$37.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
104.000
|
$5.000
|
$2.000
|
$4.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
208.000
|
$5.000
|
$2.000
|
$4.000
|
|
|
GROUND BOX TY A (122311)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$1,300.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(U)
|
EA
|
1.000
|
$7,000.000
|
$8,000.000
|
$15,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$662.730
|
$1,000.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
1.000
|
$450.000
|
$1,000.000
|
$500.000
|
|
|
ISRSA TY10BWG(1)SA(P) (EXCLUDING SIGN)
|
EA
|
1.000
|
$500.000
|
$1,000.000
|
$750.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$25.910
|
$50.000
|
$25.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
16.000
|
$30.200
|
$10.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$32.360
|
$50.000
|
$30.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
135.000
|
$0.450
|
$1.000
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,580.000
|
$0.310
|
$2.000
|
$6.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
200.000
|
$0.320
|
$2.000
|
$6.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
790.000
|
$0.280
|
$3.000
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
10.000
|
$3.050
|
$15.000
|
$22.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
135.000
|
$0.500
|
$1.000
|
$6.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
1.000
|
$9,000.000
|
$8,000.000
|
$10,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
80.000
|
$30.000
|
$5.000
|
$65.000
|
|
|
SOLAR POWERED LED ROADSIDE SIGN
|
EA
|
1.000
|
$5,000.000
|
$6,000.000
|
$3,500.000
|
|
Totals: |
$1,236,407.490
|
$1,870,931.000
|
$1,993,786.500
|