Job Info for 0904-08-004

County: HANSFORD Highway: CR Date: 04/03/2019 (5 years ago) Engineer's Estimate: $1,515,660 Control Number: 0904-08-004
Project: BR 2018(472) District: AMARILLO Time: 176 WORKING DAYS Type: REPLACE EXISTING OFF SYSTEM BRIDGE

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,515,659.72
EARTH BUILDERS, L.P.   $1,745,583.16 1
15.17% | $229,923.44
STATELINE CONSTRUCTION, LLC   $1,981,193.44 2
30.71% | $465,533.72
13.5% | $235,610.28
HODGES AND SON CONSTRUCTION COMPANY, INC.   $2,369,095.44 3
56.31% | $853,435.72
35.72% | $623,512.28
19.58% | $387,902.00
DCI CONTRACTING, INC.   $2,516,769.00 4
66.05% | $1,001,109.28
44.18% | $771,185.84
6.23% | $147,673.56
GILVIN-TERRILL, LTD.   $2,851,605.26 5
88.14% | $1,335,945.54
63.36% | $1,106,022.10
13.30% | $334,836.26

Bid Items

Items: 53, 0 filtered
HANSFORD CR  |  AMARILLO  |  0904-08-004  |  04/03/2019  |  $1,515,660  |  BR 2018(472)  |  REPLACE EXIST OFF SYSTEM BRIDGE  |  176 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate EARTH BUILDERS, L.P. STATELINE CONSTRUCTION, LLC HODGES AND SON CONSTRUCTION COMPANY, INC. DCI CONTRACTING, INC. GILVIN-TERRILL, LTD.
100 6008 PREPARING ROW (TREE) (0" TO 6" DIA) EA 7.000 $400.000 $700.000 $295.000 $2,000.000 $620.000 $340.000
100 6009 PREPARING ROW (TREE) (6" TO 24" DIA) EA 2.000 $1,200.000 $1,200.000 $675.000 $3,000.000 $2,100.000 $1,220.000
105 6038 REMOVING STAB BASE AND ASPH PAV (11") SY 452.000 $10.000 $25.000 $12.000 $40.000 $33.000 $10.000
106 6002 OBLITERATING ABANDONED ROAD SY 1,312.000 $1.000 $10.000 $22.000 $20.000 $12.500 $7.000
110 6001 EXCAVATION (ROADWAY) CY 2,426.000 $18.000 $15.000 $18.000 $20.000 $37.000 $17.000
132 6004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 2,889.000 $22.000 $30.000 $22.000 $30.000 $49.000 $20.000
150 6002 BLADING HR 20.000 $160.000 $85.000 $125.000 $100.000 $140.000 $200.000
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 10,773.440 $0.500 $1.500 $1.000 $1.000 $0.840 $0.600
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 10,542.000 $0.500 $1.500 $1.000 $1.000 $0.840 $0.600
247 6201 FL BS (CMP IN PLC)(TY A GR 4) (8") SY 5,602.000 $24.000 $25.000 $34.000 $30.000 $44.520 $20.000
310 6009 PRIME COAT (MC-30) GAL 444.000 $4.500 $10.000 $16.000 $20.000 $22.000 $8.000
314 6014 EMULS ASPH (EROSN CONT)(MS-2) GAL 613.000 $4.500 $10.000 $18.000 $20.000 $15.000 $8.000
316 6001 ASPH (MULTI OPTION) GAL 1,201.000 $4.500 $10.000 $19.000 $20.000 $15.000 $10.000
316 6173 AGGR(TY-B GR-3 SAC-B) CY 11.000 $150.000 $500.000 $1,000.000 $1,000.000 $420.000 $330.000
316 6175 AGGR(TY-B GR-4 SAC-B) CY 16.000 $150.000 $500.000 $1,200.000 $1,000.000 $460.000 $330.000
344 6054 SUPERPAVE MIXTURES SP-C PG70-28 TON 149.000 $130.000 $280.000 $265.000 $300.000 $360.000 $160.000
400 6005 CEM STABIL BKFL CY 9.000 $200.000 $300.000 $450.000 $400.000 $730.000 $325.000
403 6001 TEMPORARY SPL SHORING SF 1,780.000 $30.000 $10.000 $45.000 $15.000 $21.000 $17.000
450 6103 RAIL (TY PR11) LF 168.000 $100.000 $120.000 $165.000 $120.000 $180.000 $110.000
459 6007 GABION MATTRESSES (GALV)(12 IN) SY 615.000 $80.000 $130.000 $185.000 $200.000 $138.000 $85.000
459 6014 GABION MATTRESSES (GALV) (24 IN) SY 153.000 $150.000 $250.000 $245.000 $220.000 $269.000 $115.000
462 6023 CONC BOX CULV (8 FT X 8 FT) LF 64.000 $1,200.000 $900.000 $1,050.000 $1,500.000 $1,250.000 $1,125.000
462 6024 CONC BOX CULV (9 FT X 5 FT) LF 184.000 $600.000 $850.000 $1,050.000 $2,600.000 $1,280.000 $1,070.000
462 6026 CONC BOX CULV (9 FT X 7 FT) LF 64.000 $1,100.000 $1,000.000 $1,495.000 $1,500.000 $1,738.000 $4,220.000
462 6028 CONC BOX CULV (9 FT X 9 FT) LF 64.000 $1,400.000 $1,000.000 $1,680.000 $1,600.000 $1,815.000 $4,530.000
464 6005 RC PIPE (CL III)(24 IN) LF 60.000 $100.000 $100.000 $225.000 $100.000 $126.000 $117.000
466 6175 WINGWALL (PW - 1) (HW=14 FT) EA 2.000 $85,000.000 $70,000.000 $53,000.000 $90,000.000 $113,000.000 $144,000.000
466 6182 WINGWALL (PW - 1) (HW=7 FT) EA 2.000 $18,000.000 $20,000.000 $29,000.000 $24,000.000 $33,000.000 $44,000.000
466 6188 WINGWALL (PW - 2) (HW=13 FT) EA 2.000 $46,000.000 $70,000.000 $48,000.000 $80,000.000 $88,700.000 $103,000.000
466 6198 WINGWALL (PW - 2) (HW=9 FT) EA 2.000 $30,000.000 $40,000.000 $39,500.000 $40,000.000 $43,000.000 $60,000.000
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 2.000 $1,000.000 $2,000.000 $1,650.000 $2,000.000 $2,660.000 $3,135.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 3.000 $22,000.000 $23,000.000 $8,500.000 $15,000.000 $16,500.000 $70,000.000
496 6013 REMOV STR (BRIDGE SLAB) EA 1.000 $10,000.000 $18,000.000 $10,500.000 $15,000.000 $15,680.000 $85,270.000
500 6001 MOBILIZATION LS 1.000 $115,000.000 $185,000.000 $175,000.000 $160,000.000 $266,000.000 $285,000.000
502 6025 BARR, SIGNS, TRAFFIC HANDLING EA 4.000 $14,625.000 $7,500.000 $9,500.000 $8,000.000 $20,500.000 $15,000.000
506 6032 BLADING WORK (EROSION & SEDMT CONT) HR 12.000 $160.000 $85.000 $125.000 $100.000 $140.000 $170.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 475.000 $6.000 $5.000 $3.000 $6.000 $6.000 $10.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 475.000 $1.000 $1.000 $1.000 $2.000 $2.000 $4.000
531 6001 CONC SIDEWALKS (4") SY 253.000 $120.000 $80.000 $58.000 $110.000 $84.000 $95.000
531 6027 CURB RAMPS (TY 10) SY 8.000 $140.000 $80.000 $1,850.000 $3,000.000 $315.000 $253.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 725.000 $27.000 $40.000 $35.000 $26.000 $45.000 $28.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $1,300.000 $1,500.000 $1,450.000 $1,200.000 $3,200.000 $1,400.000
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 6.000 $1,200.000 $1,200.000 $1,100.000 $1,400.000 $2,800.000 $19,450.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 11.000 $2,650.000 $3,000.000 $3,550.000 $2,600.000 $4,000.000 $3,150.000
552 6003 WIRE FENCE (TY C) LF 70.000 $11.000 $15.000 $22.000 $25.000 $28.000 $111.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 3.000 $900.000 $650.000 $800.000 $800.000 $980.000 $820.000
644 6075 RELOCATE SM RD SN SUP&AM(SIGN ONLY) EA 1.000 $300.000 $400.000 $800.000 $500.000 $280.000 $1,210.000
644 6076 REMOVE SM RD SN SUP&AM EA 7.000 $105.000 $150.000 $200.000 $100.000 $140.000 $140.000
658 6033 INSTL DEL ASSM (D-SR)SZ 2(WC)GND EA 8.000 $25.000 $40.000 $30.000 $50.000 $70.000 $120.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 24.000 $35.000 $40.000 $30.000 $30.000 $70.000 $40.000
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 1,340.000 $0.500 $11.000 $4.000 $12.000 $3.000 $10.000
784 6005 REP STL BRIDGE MEMBER (TRUSS DIAGONAL) EA 1.000 $2,500.000 $2,500.000 $18,000.000 $5,000.000 $3,000.000 $3,500.000
784 6011 REP STL BRIDGE MEMBER (BOTTOM CHORD) EA 2.000 $3,000.000 $4,000.000 $22,000.000 $5,000.000 $3,500.000 $3,500.000
Totals: $1,515,659.72 $1,745,583.16 $1,981,193.44 $2,369,095.44 $2,516,769.01 $2,851,605.26