Show Job Controls
Bid Cobra

HAMILTON SH 36 (0183-03-050)

Items: 134

County: HAMILTON
Length: N/A
Highway: SH 36
District: WACO
Control Number: 0183-03-050
DBE Goal: N/A
Project: STP 2019(839)
Guaranty: N/A
Time: 330 WORKING DAYS
Engineer's Estimate: $11,978,826.19
Date: 05/08/2019 (7 years ago)
Contract Number: N/A
Type: ADD PASS LNS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$11,978,826.19
$12,587,706.09
Over/Under Est: 5.08% $608,879.90
Over/Under Est: 15.59% $1,867,615.19
Amt Left: 10% $1,258,735.29
Over/Under Est: 27.01% $3,235,612.85
Amt Left: 20.87% $2,626,732.95
Delta: -9.88% -$1,367,997.66

Bid Items & Bid Tabulations

134 Total 0 of 134
HAMILTON  |  SH 36  |  WACO  |  0183-03-050  |  05/08/2019  |  $11,978,826.19  |  STP 2019(839)  |  ADD PASS LNS  |  330 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 34.000 $3,000.000 $2,000.000 $670.000 $1,600.000
REMOVING CONCRETE(MOW STRIP)
LF 4,366.000 $6.000 $10.000 $5.400 $14.000
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 38,445.000 $3.750 $4.000 $3.750 $2.000
EXCAVATION (ROADWAY)
CY 4,350.000 $8.000 $10.000 $16.000 $9.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 39,949.000 $12.000 $12.000 $16.000 $17.000
FURNISHING AND PLACING TOPSOIL (4")
SY 219,376.000 $1.000 $0.750 $0.700 $0.800
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 219,376.000 $0.150 $0.120 $0.130 $0.130
DRILL SEEDING (TEMP) (WARM)
SY 109,697.000 $0.100 $0.070 $0.100 $0.100
DRILL SEEDING (TEMP) (COOL)
SY 109,697.000 $0.100 $0.070 $0.100 $0.100
VEGETATIVE WATERING
MG 3,562.000 $18.000 $10.000 $8.000 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 17,010.000 $1.000 $1.000 $1.000 $0.930
SOIL RETENTION BLANKETS (CL 2) (TY E)
SY 9,975.000 $2.000 $3.000 $1.000 $0.930
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 513.000 $3.000 $6.000 $4.500 $4.250
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 17,438.000 $36.000 $38.000 $41.610 $50.000
PRIME COAT(MC-30 OR AE-P)
GAL 13,951.000 $3.500 $3.750 $3.900 $3.750
ASPH (CRS-2)
GAL 33,941.000 $2.150 $2.900 $2.900 $2.900
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 603.000 $75.000 $100.000 $140.000 $95.000
D-GR HMA TY-C SAC-B PG64-22
TON 53,700.000 $60.000 $65.000 $76.250 $89.000
D-GR HMA TY-D SAC-B PG64-22
TON 3,467.000 $90.000 $65.000 $98.000 $89.000
D-GR HMA TY-D PG64-22(LEVEL-UP)
TON 33,684.000 $65.000 $65.000 $83.500 $92.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 6,000.000 $43.000 $40.000 $50.000 $45.000
PLANE ASPH CONC PAV(0" TO 3")
SY 7,443.000 $2.500 $2.000 $2.400 $3.250
PLANE ASPH CONC PAV (1.5")
SY 23,073.000 $1.150 $1.500 $1.750 $1.950
PLANE ASPH CONC PAV (1.5" TO 3")
SY 2,762.000 $4.000 $2.500 $2.440 $3.850
CEM STABIL BKFL
CY 33.000 $120.000 $200.000 $189.000 $380.000
TEMPORARY SPL SHORING
SF 1,302.000 $18.000 $35.000 $21.000 $41.520
DRILL SHAFT (18 IN)
LF 39.000 $60.000 $165.000 $171.000 $600.000
DRILL SHAFT (30 IN)
LF 102.000 $120.000 $400.000 $431.000 $1,150.000
CL C CONC (ABUT)(EXTEND)
CY 20.500 $1,200.000 $3,000.000 $1,400.000 $2,250.000
CL C CONC (CAP)(EXTEND)
CY 7.600 $1,600.000 $3,000.000 $2,200.000 $2,500.000
CL C CONC (COLUMN)
CY 3.000 $900.000 $3,000.000 $2,000.000 $2,750.000
REINF CONC SLAB (EXTEND SLAB)
SF 1,108.000 $20.000 $35.000 $45.000 $47.100
RETAINING WALL (STONE)
SF 500.000 $125.000 $75.000 $35.000 $40.000
PRESTR CONC GIRDER (TX28)
LF 236.140 $132.000 $225.000 $225.000 $365.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 2.000 $170.000 $500.000 $1,400.000 $500.000
RIPRAP (CONC)(5 IN)
CY 9.000 $400.000 $650.000 $560.000 $850.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 132.000 $125.000 $125.000 $107.000 $85.000
RIPRAP (MOW STRIP)(4 IN)
CY 289.000 $430.000 $500.000 $432.000 $475.000
RIPRAP (CEMENT STABILIZED)(5 IN)
CY 25.000 $500.000 $425.000 $389.000 $600.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 80.000 $25.000 $40.000 $42.000 $29.380
CLEANING AND SEALING JOINTS (CL 3)
LF 394.000 $30.000 $50.000 $50.000 $29.380
CLEANING EXISTING JOINTS
LF 358.000 $15.000 $10.000 $10.000 $12.000
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 1.000 $27,000.000 $275,000.000 $250,000.000 $272,721.000
RAIL (TY T402)
LF 155.800 $130.000 $200.000 $205.000 $281.170
RETROFIT RAIL (TY T402)
LF 640.000 $320.000 $250.000 $278.000 $412.460
ARMOR JOINT
LF 21.000 $86.000 $150.000 $105.000 $160.000
HEADER TYPE EXPANSION JOINT
CF 49.720 $444.000 $1,000.000 $1,025.000 $573.570
JOINT SEALANT
LF 358.000 $14.000 $15.000 $15.800 $10.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 29.000 $480.000 $450.000 $540.000 $400.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 6.000 $850.000 $750.000 $700.000 $500.000
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
LF 16.500 $1,150.000 $1,100.000 $777.000 $700.000
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
LF 40.000 $1,750.000 $1,400.000 $526.000 $900.000
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
LF 10.000 $900.000 $750.000 $1,028.000 $700.000
CONC BOX CULVERT (2 FT X 2 FT) (EXTEND)
LF 6.000 $200.000 $400.000 $514.000 $400.000
RC PIPE (CL III)(18 IN)
LF 189.120 $53.000 $55.000 $54.000 $48.000
RC PIPE (CL III)(24 IN)
LF 581.820 $65.000 $60.000 $45.000 $90.000
RC PIPE (CL IV)(18 IN)
LF 454.640 $70.000 $55.000 $62.000 $52.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $25,000.000 $35,000.000 $27,000.000 $26,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $19,000.000 $16,000.000 $13,500.000 $12,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $24,000.000 $20,000.000 $18,500.000 $14,000.000
SET (TY I)(S=2 FT)(HW=3FT)(4:1)(C)
EA 1.000 $3,000.000 $3,000.000 $9,800.000 $4,500.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $5,000.000 $3,000.000 $8,200.000 $5,500.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 2.000 $9,500.000 $8,500.000 $11,600.000 $8,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 26.000 $725.000 $770.000 $970.000 $750.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,000.000 $800.000 $960.000 $800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $1,200.000 $1,000.000 $1,175.000 $850.000
CLEAN EXIST CULVERTS
EA 18.000 $1,500.000 $2,000.000 $960.000 $850.000
RAISING EXIST STRUCT
LS 1.000 $140,000.000 $115,000.000 $120,000.000 $105,500.000
REMOV STR (SET)
EA 6.000 $350.000 $400.000 $470.000 $600.000
REMOV STR (WINGWALL)
EA 10.000 $1,500.000 $1,250.000 $1,175.000 $1,000.000
REMOV STR (PIPE)
LF 629.000 $15.000 $15.000 $9.400 $15.000
MOBILIZATION
LS 1.000 $1,082,521.620 $1,250,000.000 $965,000.000 $1,130,230.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $7,500.000 $5,000.000 $5,900.000 $1,600.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,377.000 $31.000 $25.000 $28.500 $25.500
ROCK FILTER DAMS (REMOVE)
LF 2,377.000 $8.500 $5.000 $11.180 $9.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 334.000 $20.000 $20.000 $10.000 $19.700
CONSTRUCTION EXITS (REMOVE)
SY 334.000 $6.000 $5.000 $4.000 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 45,876.000 $3.300 $2.000 $3.830 $1.400
TEMP SEDMT CONT FENCE (REMOVE)
LF 45,876.000 $0.750 $0.250 $0.490 $0.500
PTB (DES SRCE)(SGL SLP)(TY 1) OR (STL)
LF 600.000 $15.000 $15.000 $17.000 $35.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 2,640.000 $10.000 $11.000 $18.000 $12.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 600.000 $12.000 $14.000 $15.000 $25.000
INTERSECTIONS (ACP)
SY 465.000 $30.000 $35.000 $43.000 $52.000
DRIVEWAYS (CONC)
SY 13.000 $70.000 $150.000 $425.000 $120.000
DRIVEWAYS (ACP)
SY 2,546.000 $30.000 $22.000 $27.500 $42.000
TURNOUTS (ACP)
SY 73.000 $35.000 $50.000 $43.000 $44.000
RUMBLE STRIPS (CENTERLINE)
LF 76,131.000 $0.200 $0.170 $0.250 $0.220
MTL W-BEAM GD FEN (STEEL POST)
LF 1,675.000 $24.000 $30.000 $25.500 $25.200
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,800.000 $1,900.000 $2,275.000 $1,771.000
REMOVE METAL BEAM GUARD FENCE
LF 2,762.000 $2.000 $2.000 $1.550 $1.500
GUARDRAIL END TREATMENT (INSTALL)
EA 30.000 $2,500.000 $2,900.000 $2,840.000 $2,830.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $250.000 $150.000 $160.000 $150.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 10.000 $1,900.000 $1,500.000 $2,100.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,000.000 $950.000 $1,000.000
CRASH CUSHION ATTEN (INSTALL) (TRACC)
EA 2.000 $20,000.000 $12,500.000 $12,750.000 $11,350.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $200.000 $200.000 $147.000 $139.950
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 7.000 $250.000 $500.000 $647.000 $615.000
ALUMINUM SIGNS (TY A)
SF 22.000 $20.000 $30.000 $35.000 $33.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 12.000 $450.000 $450.000 $542.000 $515.520
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $500.000 $500.000 $529.000 $502.960
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
EA 11.000 $600.000 $600.000 $787.000 $747.450
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,000.000 $600.000 $885.000 $841.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 8.000 $700.000 $750.000 $883.000 $839.320
IN SM RD SN SUP&AM TYTWT(1)UA(P)
EA 63.000 $430.000 $400.000 $431.000 $409.400
IN SM RD SN SUP&AM TYTWT(1)UA(T)
EA 29.000 $440.000 $425.000 $435.000 $413.430
RELOCATE SM RD SN SUP & AM TY TEMP
EA 136.000 $200.000 $200.000 $200.000 $62.950
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 158.000 $50.000 $65.000 $66.000 $64.950
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 3.000 $60.000 $65.000 $68.000 $20.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 62.000 $35.000 $20.000 $21.000 $20.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 160,000.000 $0.600 $0.440 $0.440 $0.440
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 160,000.000 $0.600 $0.440 $0.440 $0.440
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 3,096.000 $1.000 $0.450 $0.470 $0.450
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 96.000 $1.500 $2.000 $1.050 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 588.000 $0.750 $1.000 $0.840 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 251.000 $6.000 $9.000 $8.950 $8.500
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 6.000 $25.000 $70.000 $68.000 $65.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 16,671.000 $0.300 $0.420 $0.440 $0.420
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 165,735.000 $0.300 $0.360 $0.380 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,545.000 $0.300 $0.450 $0.440 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 133,360.000 $0.300 $0.370 $0.390 $0.370
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $200.000 $320.000 $320.000 $310.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 16.000 $550.000 $650.000 $650.000 $630.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $250.000 $400.000 $420.000 $400.000
REFL PAV MRKR TY I-C
EA 835.000 $3.000 $5.000 $4.790 $4.550
REFL PAV MRKR TY II-A-A
EA 2,213.000 $3.000 $5.000 $4.790 $4.550
SPOT MOWING
AC 85.000 $200.000 $75.000 $100.000 $125.000
REPAIR (TRACC)
EA 4.000 $5,000.000 $5,000.000 $3,500.000 $10,000.000
REP STL BRIDGE MEMBER (BEARINGS)
EA 28.000 $1,000.000 $3,500.000 $3,400.000 $3,300.000
TRACKLESS TACK COAT
GAL 82,559.000 $3.130 $0.000 $3.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 150.000 $100.000 $76.000 $105.000 $86.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $12,500.000 $5,000.000 $17,900.000
TMA (STATIONARY)
DAY 150.000 $230.000 $265.000 $300.000 $232.000
TMA (MOBILE OPERATION)
HR 250.000 $50.000 $51.000 $48.000 $45.000
1
MEMBRANE UNDERSEAL
GAL 103,199.000 $2.500 $3.100 $0.000 $3.000
Totals: $12,237,235.860 $12,587,706.090 $13,846,441.380 $15,214,439.046