PREPARING ROW
|
STA
|
34.000
|
$3,000.000
|
$2,000.000
|
$670.000
|
$1,600.000
|
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
4,366.000
|
$6.000
|
$10.000
|
$5.400
|
$14.000
|
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
38,445.000
|
$3.750
|
$4.000
|
$3.750
|
$2.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,350.000
|
$8.000
|
$10.000
|
$16.000
|
$9.000
|
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
39,949.000
|
$12.000
|
$12.000
|
$16.000
|
$17.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
219,376.000
|
$1.000
|
$0.750
|
$0.700
|
$0.800
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
219,376.000
|
$0.150
|
$0.120
|
$0.130
|
$0.130
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
109,697.000
|
$0.100
|
$0.070
|
$0.100
|
$0.100
|
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
109,697.000
|
$0.100
|
$0.070
|
$0.100
|
$0.100
|
|
|
|
VEGETATIVE WATERING
|
MG
|
3,562.000
|
$18.000
|
$10.000
|
$8.000
|
$1.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
17,010.000
|
$1.000
|
$1.000
|
$1.000
|
$0.930
|
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY E)
|
SY
|
9,975.000
|
$2.000
|
$3.000
|
$1.000
|
$0.930
|
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
513.000
|
$3.000
|
$6.000
|
$4.500
|
$4.250
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
17,438.000
|
$36.000
|
$38.000
|
$41.610
|
$50.000
|
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
13,951.000
|
$3.500
|
$3.750
|
$3.900
|
$3.750
|
|
|
|
ASPH (CRS-2)
|
GAL
|
33,941.000
|
$2.150
|
$2.900
|
$2.900
|
$2.900
|
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
603.000
|
$75.000
|
$100.000
|
$140.000
|
$95.000
|
|
|
|
D-GR HMA TY-C SAC-B PG64-22
|
TON
|
53,700.000
|
$60.000
|
$65.000
|
$76.250
|
$89.000
|
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
3,467.000
|
$90.000
|
$65.000
|
$98.000
|
$89.000
|
|
|
|
D-GR HMA TY-D PG64-22(LEVEL-UP)
|
TON
|
33,684.000
|
$65.000
|
$65.000
|
$83.500
|
$92.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
6,000.000
|
$43.000
|
$40.000
|
$50.000
|
$45.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
7,443.000
|
$2.500
|
$2.000
|
$2.400
|
$3.250
|
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
23,073.000
|
$1.150
|
$1.500
|
$1.750
|
$1.950
|
|
|
|
PLANE ASPH CONC PAV (1.5" TO 3")
|
SY
|
2,762.000
|
$4.000
|
$2.500
|
$2.440
|
$3.850
|
|
|
|
CEM STABIL BKFL
|
CY
|
33.000
|
$120.000
|
$200.000
|
$189.000
|
$380.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,302.000
|
$18.000
|
$35.000
|
$21.000
|
$41.520
|
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
39.000
|
$60.000
|
$165.000
|
$171.000
|
$600.000
|
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
102.000
|
$120.000
|
$400.000
|
$431.000
|
$1,150.000
|
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
20.500
|
$1,200.000
|
$3,000.000
|
$1,400.000
|
$2,250.000
|
|
|
|
CL C CONC (CAP)(EXTEND)
|
CY
|
7.600
|
$1,600.000
|
$3,000.000
|
$2,200.000
|
$2,500.000
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
3.000
|
$900.000
|
$3,000.000
|
$2,000.000
|
$2,750.000
|
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
1,108.000
|
$20.000
|
$35.000
|
$45.000
|
$47.100
|
|
|
|
RETAINING WALL (STONE)
|
SF
|
500.000
|
$125.000
|
$75.000
|
$35.000
|
$40.000
|
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
236.140
|
$132.000
|
$225.000
|
$225.000
|
$365.000
|
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
2.000
|
$170.000
|
$500.000
|
$1,400.000
|
$500.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
9.000
|
$400.000
|
$650.000
|
$560.000
|
$850.000
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
132.000
|
$125.000
|
$125.000
|
$107.000
|
$85.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
289.000
|
$430.000
|
$500.000
|
$432.000
|
$475.000
|
|
|
|
RIPRAP (CEMENT STABILIZED)(5 IN)
|
CY
|
25.000
|
$500.000
|
$425.000
|
$389.000
|
$600.000
|
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
80.000
|
$25.000
|
$40.000
|
$42.000
|
$29.380
|
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
394.000
|
$30.000
|
$50.000
|
$50.000
|
$29.380
|
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
358.000
|
$15.000
|
$10.000
|
$10.000
|
$12.000
|
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$27,000.000
|
$275,000.000
|
$250,000.000
|
$272,721.000
|
|
|
|
RAIL (TY T402)
|
LF
|
155.800
|
$130.000
|
$200.000
|
$205.000
|
$281.170
|
|
|
|
RETROFIT RAIL (TY T402)
|
LF
|
640.000
|
$320.000
|
$250.000
|
$278.000
|
$412.460
|
|
|
|
ARMOR JOINT
|
LF
|
21.000
|
$86.000
|
$150.000
|
$105.000
|
$160.000
|
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
49.720
|
$444.000
|
$1,000.000
|
$1,025.000
|
$573.570
|
|
|
|
JOINT SEALANT
|
LF
|
358.000
|
$14.000
|
$15.000
|
$15.800
|
$10.000
|
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
29.000
|
$480.000
|
$450.000
|
$540.000
|
$400.000
|
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
6.000
|
$850.000
|
$750.000
|
$700.000
|
$500.000
|
|
|
|
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
|
LF
|
16.500
|
$1,150.000
|
$1,100.000
|
$777.000
|
$700.000
|
|
|
|
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
|
LF
|
40.000
|
$1,750.000
|
$1,400.000
|
$526.000
|
$900.000
|
|
|
|
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
|
LF
|
10.000
|
$900.000
|
$750.000
|
$1,028.000
|
$700.000
|
|
|
|
CONC BOX CULVERT (2 FT X 2 FT) (EXTEND)
|
LF
|
6.000
|
$200.000
|
$400.000
|
$514.000
|
$400.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
189.120
|
$53.000
|
$55.000
|
$54.000
|
$48.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
581.820
|
$65.000
|
$60.000
|
$45.000
|
$90.000
|
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
454.640
|
$70.000
|
$55.000
|
$62.000
|
$52.000
|
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$25,000.000
|
$35,000.000
|
$27,000.000
|
$26,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$19,000.000
|
$16,000.000
|
$13,500.000
|
$12,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$24,000.000
|
$20,000.000
|
$18,500.000
|
$14,000.000
|
|
|
|
SET (TY I)(S=2 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$3,000.000
|
$3,000.000
|
$9,800.000
|
$4,500.000
|
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$5,000.000
|
$3,000.000
|
$8,200.000
|
$5,500.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
2.000
|
$9,500.000
|
$8,500.000
|
$11,600.000
|
$8,500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$725.000
|
$770.000
|
$970.000
|
$750.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$800.000
|
$960.000
|
$800.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$1,200.000
|
$1,000.000
|
$1,175.000
|
$850.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
18.000
|
$1,500.000
|
$2,000.000
|
$960.000
|
$850.000
|
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$140,000.000
|
$115,000.000
|
$120,000.000
|
$105,500.000
|
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$350.000
|
$400.000
|
$470.000
|
$600.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
10.000
|
$1,500.000
|
$1,250.000
|
$1,175.000
|
$1,000.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
629.000
|
$15.000
|
$15.000
|
$9.400
|
$15.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,082,521.620
|
$1,250,000.000
|
$965,000.000
|
$1,130,230.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$7,500.000
|
$5,000.000
|
$5,900.000
|
$1,600.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,377.000
|
$31.000
|
$25.000
|
$28.500
|
$25.500
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,377.000
|
$8.500
|
$5.000
|
$11.180
|
$9.500
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
334.000
|
$20.000
|
$20.000
|
$10.000
|
$19.700
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
334.000
|
$6.000
|
$5.000
|
$4.000
|
$7.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
45,876.000
|
$3.300
|
$2.000
|
$3.830
|
$1.400
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
45,876.000
|
$0.750
|
$0.250
|
$0.490
|
$0.500
|
|
|
|
PTB (DES SRCE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
600.000
|
$15.000
|
$15.000
|
$17.000
|
$35.000
|
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,640.000
|
$10.000
|
$11.000
|
$18.000
|
$12.000
|
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
600.000
|
$12.000
|
$14.000
|
$15.000
|
$25.000
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
465.000
|
$30.000
|
$35.000
|
$43.000
|
$52.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
13.000
|
$70.000
|
$150.000
|
$425.000
|
$120.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,546.000
|
$30.000
|
$22.000
|
$27.500
|
$42.000
|
|
|
|
TURNOUTS (ACP)
|
SY
|
73.000
|
$35.000
|
$50.000
|
$43.000
|
$44.000
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
76,131.000
|
$0.200
|
$0.170
|
$0.250
|
$0.220
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,675.000
|
$24.000
|
$30.000
|
$25.500
|
$25.200
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$1,800.000
|
$1,900.000
|
$2,275.000
|
$1,771.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,762.000
|
$2.000
|
$2.000
|
$1.550
|
$1.500
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
30.000
|
$2,500.000
|
$2,900.000
|
$2,840.000
|
$2,830.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$250.000
|
$150.000
|
$160.000
|
$150.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
10.000
|
$1,900.000
|
$1,500.000
|
$2,100.000
|
$1,500.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
$950.000
|
$1,000.000
|
|
|
|
CRASH CUSHION ATTEN (INSTALL) (TRACC)
|
EA
|
2.000
|
$20,000.000
|
$12,500.000
|
$12,750.000
|
$11,350.000
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$200.000
|
$200.000
|
$147.000
|
$139.950
|
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
7.000
|
$250.000
|
$500.000
|
$647.000
|
$615.000
|
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
22.000
|
$20.000
|
$30.000
|
$35.000
|
$33.500
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
12.000
|
$450.000
|
$450.000
|
$542.000
|
$515.520
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$500.000
|
$500.000
|
$529.000
|
$502.960
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
11.000
|
$600.000
|
$600.000
|
$787.000
|
$747.450
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,000.000
|
$600.000
|
$885.000
|
$841.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
8.000
|
$700.000
|
$750.000
|
$883.000
|
$839.320
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(P)
|
EA
|
63.000
|
$430.000
|
$400.000
|
$431.000
|
$409.400
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(T)
|
EA
|
29.000
|
$440.000
|
$425.000
|
$435.000
|
$413.430
|
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
136.000
|
$200.000
|
$200.000
|
$200.000
|
$62.950
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
158.000
|
$50.000
|
$65.000
|
$66.000
|
$64.950
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
3.000
|
$60.000
|
$65.000
|
$68.000
|
$20.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
62.000
|
$35.000
|
$20.000
|
$21.000
|
$20.000
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
160,000.000
|
$0.600
|
$0.440
|
$0.440
|
$0.440
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
160,000.000
|
$0.600
|
$0.440
|
$0.440
|
$0.440
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
3,096.000
|
$1.000
|
$0.450
|
$0.470
|
$0.450
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
96.000
|
$1.500
|
$2.000
|
$1.050
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
588.000
|
$0.750
|
$1.000
|
$0.840
|
$0.800
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
251.000
|
$6.000
|
$9.000
|
$8.950
|
$8.500
|
|
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
6.000
|
$25.000
|
$70.000
|
$68.000
|
$65.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
16,671.000
|
$0.300
|
$0.420
|
$0.440
|
$0.420
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
165,735.000
|
$0.300
|
$0.360
|
$0.380
|
$0.360
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
5,545.000
|
$0.300
|
$0.450
|
$0.440
|
$0.420
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
133,360.000
|
$0.300
|
$0.370
|
$0.390
|
$0.370
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$200.000
|
$320.000
|
$320.000
|
$310.000
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
16.000
|
$550.000
|
$650.000
|
$650.000
|
$630.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$250.000
|
$400.000
|
$420.000
|
$400.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
835.000
|
$3.000
|
$5.000
|
$4.790
|
$4.550
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,213.000
|
$3.000
|
$5.000
|
$4.790
|
$4.550
|
|
|
|
SPOT MOWING
|
AC
|
85.000
|
$200.000
|
$75.000
|
$100.000
|
$125.000
|
|
|
|
REPAIR (TRACC)
|
EA
|
4.000
|
$5,000.000
|
$5,000.000
|
$3,500.000
|
$10,000.000
|
|
|
|
REP STL BRIDGE MEMBER (BEARINGS)
|
EA
|
28.000
|
$1,000.000
|
$3,500.000
|
$3,400.000
|
$3,300.000
|
|
|
|
TRACKLESS TACK COAT
|
GAL
|
82,559.000
|
$3.130
|
$0.000
|
$3.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
150.000
|
$100.000
|
$76.000
|
$105.000
|
$86.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$12,500.000
|
$5,000.000
|
$17,900.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$230.000
|
$265.000
|
$300.000
|
$232.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
250.000
|
$50.000
|
$51.000
|
$48.000
|
$45.000
|
|
1
|
|
MEMBRANE UNDERSEAL
|
GAL
|
103,199.000
|
$2.500
|
$3.100
|
$0.000
|
$3.000
|
|
Totals: |
$12,237,235.860
|
$12,587,706.090
|
$13,846,441.380
|
$15,214,439.046
|