Bid Cobra

HAMILTON SH 36 (0183-02-028)

Items: 155

County: HAMILTON
Length: N/A
Highway: SH 36
District: WACO
Control Number: 0183-02-028
DBE Goal: N/A
Project: F 2024(012)
Guaranty: N/A
Time: 285 WORKING DAYS
Engineer's Estimate: $16,703,962.29
Date: 09/07/2023 (2 years ago)
Contract Number: N/A
Type: REHAB RDWY TO ADD PASS LNS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$16,703,962.29
$18,187,374.40
Over/Under Est: 8.88% $1,483,412.11
Over/Under Est: 15.81% $2,641,709.63
Amt Left: 6.37% $1,158,297.52
Over/Under Est: 15.84% $2,645,517.63
Amt Left: 6.39% $1,162,105.52
Delta: -0.02% -$3,808.00
Over/Under Est: 18.68% $3,120,825.15
Amt Left: 9% $1,637,413.04
Delta: -2.46% -$475,307.52
Subcontractor Percentage Amount
BEAR CREEK CONSTRUCTION, LLC 8.91% $1,731,329.83
GIBSON & ASSOCIATES, INC. 4.91% $954,077.38
D. I. J. CONSTRUCTION, INC. 1.88% $365,308.65
GUARDRAIL SAFETY SERVICES, LLC 1.55% $301,185.32
EGGEMEYER LAND CLEARING, LLC 0.67% $130,189.79
J. H. ODEN CONTRACTING COMPANY 0.55% $106,872.21
MARCOMS CONSTRUCTION LLC 0.55% $106,872.21
AWP SAFETY 0.33% $64,123.33
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.28% $54,407.67
WYLIE DRILLING & DRAINAGE, INC. 0.24% $46,635.15
S & S BRIDGE PAINTING, INC. 0.14% $27,203.84
PROFESSIONAL TRAFFIC CONTROL LLC 0.10% $19,431.31
ROADWAY SPECIALTIES, INC. 0.03% $5,829.39
GK CONSTRUCTION, LLC 0.00% $0.00
Total: 20.14% $3,913,466.08

Bid Items & Bid Tabulations

155 Total 0 of 155
HAMILTON  |  SH 36  |  WACO  |  0183-02-028  |  09/07/2023  |  $16,703,962.29  |  F 2024(012)  |  REHAB RDWY TO ADD PASS LNS  |  285 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
JAY MILLS CONTRACTING, INCORPORATED
PREPARING ROW
STA 110.000 $2,000.000 $2,000.000 $1,530.000 $1,600.000 $4,500.000
REMOVING CONC (DRIVEWAYS)
SY 314.000 $23.000 $20.000 $14.900 $26.000 $18.000
REMOVING CONCRETE(MOW STRIP)
LF 8,043.000 $8.500 $12.000 $4.500 $10.000 $13.000
REMOVING STAB BASE AND ASPH PAV (2")
SY 4,134.000 $9.500 $3.000 $9.400 $3.150 $2.700
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 35,915.000 $5.000 $3.500 $2.450 $3.780 $5.150
EXCAVATION (ROADWAY)
CY 17,186.000 $11.500 $20.000 $19.640 $17.000 $17.500
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 48,062.830 $13.000 $20.000 $37.000 $19.000 $15.200
FURNISHING AND PLACING TOPSOIL (4")
SY 170,230.000 $1.000 $0.700 $0.640 $1.770 $1.400
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 170,230.000 $0.150 $0.180 $0.160 $0.170 $0.180
DRILL SEEDING (TEMP) (WARM)
SY 85,118.000 $0.100 $0.150 $0.130 $0.140 $0.140
DRILL SEEDING (TEMP) (COOL)
SY 85,118.000 $0.100 $0.150 $0.130 $0.140 $0.140
VEGETATIVE WATERING
MG 2,762.000 $18.000 $10.000 $34.300 $10.000 $20.500
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 23,212.000 $1.300 $1.250 $0.900 $1.100 $0.990
SOIL RETENTION BLANKETS (CL 2) (TY E)
SY 10,824.000 $2.000 $3.500 $2.790 $3.000 $3.070
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 1,716.000 $3.000 $4.000 $3.500 $3.760 $3.850
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 18,619.000 $50.000 $70.000 $84.000 $77.000 $71.750
PRIME COAT(MC-30 OR AE-P)
GAL 14,896.000 $4.600 $4.500 $5.400 $5.750 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 6,000.000 $77.000 $75.000 $70.250 $93.000 $92.000
PLANE ASPH CONC PAV(0" TO 3")
SY 4,071.000 $4.000 $5.000 $8.000 $7.000 $5.800
PLANE ASPH CONC PAV (1.5")
SY 6,893.000 $2.000 $2.500 $3.400 $2.000 $4.000
PLANE ASPH CONC PAV (1.5" TO 3")
SY 942.000 $1.300 $2.500 $8.550 $3.000 $10.000
CEM STABIL BKFL
CY 284.000 $165.000 $300.000 $276.410 $317.000 $200.000
CUT & RESTORING PAV
SY 24.000 $105.000 $100.000 $200.000 $181.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 44.000 $6.000 $12.000 $10.000 $8.600 $5.000
TEMPORARY SPL SHORING
SF 3,602.000 $38.000 $30.000 $23.000 $28.000 $24.200
DRILL SHAFT (18 IN)
LF 39.000 $265.000 $250.000 $270.000 $245.000 $202.000
DRILL SHAFT (30 IN)
LF 128.000 $280.000 $500.000 $535.000 $515.000 $457.000
CL C CONC (ABUT)(EXTEND)
CY 25.700 $3,000.000 $2,500.000 $2,125.000 $1,800.000 $2,530.000
CL C CONC (CAP)(EXTEND)
CY 21.200 $3,000.000 $2,500.000 $3,400.000 $2,500.000 $7,568.000
CL C CONC (COLUMN)
CY 7.300 $3,000.000 $2,500.000 $4,100.000 $2,250.000 $4,785.000
REINF CONC SLAB (EXTEND SLAB)
SF 2,667.000 $30.000 $50.000 $47.000 $65.000 $55.000
PRESTR CONC GIRDER (TX28)
LF 394.640 $215.000 $200.000 $210.000 $245.000 $250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 10.000 $400.000 $600.000 $537.350 $540.000 $550.000
CONC STR REPAIR (STANDARD)
SF 273.000 $170.000 $125.000 $98.870 $98.000 $106.700
PNEUMATICALLY PLACED CONC (ENCASEMENT)
SF 6,020.000 $25.000 $50.000 $34.000 $72.000 $38.000
RIPRAP (CONC)(5 IN)
CY 72.000 $590.000 $750.000 $763.190 $830.000 $660.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 193.000 $125.000 $300.000 $250.000 $260.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 314.000 $450.000 $700.000 $585.000 $680.000 $643.500
CLEANING AND SEALING EXIST JOINTS(CL5)
LF 102.000 $30.000 $50.000 $30.000 $32.000 $35.200
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 718.000 $40.000 $50.000 $30.000 $32.000 $35.200
STR STEEL (PEDESTAL)
LB 574.000 $65.000 $75.000 $70.930 $71.000 $76.000
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 1.000 $40,000.000 $40,000.000 $28,000.000 $43,000.000 $30,800.000
RAIL (TY T402)
LF 236.100 $170.000 $300.000 $210.000 $255.000 $160.000
RETROFIT RAIL (TY T402)
LF 1,085.000 $250.000 $315.000 $270.000 $360.000 $195.000
ARMOR JOINT
LF 65.000 $135.000 $175.000 $152.000 $159.000 $205.000
TYPE A JOINT
LF 36.000 $85.000 $100.000 $105.000 $75.000 $52.000
CMP (GAL STL 108 IN)
LF 36.000 $500.000 $700.000 $160.000 $625.000 $1,000.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 96.350 $980.000 $765.000 $480.000 $718.000 $528.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 68.800 $570.000 $775.000 $570.000 $737.000 $627.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 29.500 $600.000 $800.000 $661.000 $749.000 $727.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 30.000 $800.000 $900.000 $900.000 $839.000 $990.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 53.740 $1,510.000 $950.000 $783.000 $888.000 $862.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 68.000 $600.000 $1,100.000 $990.000 $1,065.000 $1,089.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 33.000 $1,200.000 $1,400.000 $1,273.000 $1,234.000 $1,400.000
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
LF 15.800 $1,350.000 $1,200.000 $1,045.000 $1,034.000 $1,150.000
CONC BOX CULV (6 FT X 5.5 FT)(EXTEND)
LF 91.700 $1,000.000 $1,000.000 $993.000 $859.000 $1,092.300
RC PIPE (CL III)(18 IN)
LF 359.590 $70.000 $75.000 $58.000 $69.000 $93.000
RC PIPE (CL III)(24 IN)
LF 408.910 $80.000 $90.000 $70.000 $85.000 $113.000
RC PIPE (CL III)(36 IN)
LF 71.160 $150.000 $250.000 $130.000 $234.000 $180.000
RC PIPE (CL IV)(18 IN)
LF 232.180 $85.000 $80.000 $65.000 $71.000 $105.000
RC PIPE (CL IV)(30 IN)
LF 200.000 $200.000 $150.000 $115.000 $134.000 $160.000
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $14,600.000 $10,000.000 $5,250.000 $10,200.000 $5,775.000
WINGWALL (PW - 1) (HW=4 FT)
EA 3.000 $8,000.000 $11,000.000 $10,000.000 $11,200.000 $11,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 3.000 $20,000.000 $16,000.000 $21,200.000 $15,700.000 $23,320.000
WINGWALL (PW - 1) (HW=7 FT)
EA 5.000 $16,000.000 $15,000.000 $21,700.000 $14,900.000 $23,870.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $30,400.000 $18,000.000 $24,500.000 $17,400.000 $26,950.000
HEADWALL (CH - PW - 0)(DIA=100 IN)(MOD)
EA 1.000 $50,000.000 $40,000.000 $60,000.000 $38,300.000 $66,000.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 6.000 $8,000.000 $12,000.000 $12,000.000 $11,600.000 $13,200.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 4.000 $9,500.000 $14,000.000 $15,000.000 $13,200.000 $16,500.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $6,000.000 $12,000.000 $12,000.000 $11,500.000 $13,200.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $10,000.000 $17,000.000 $16,000.000 $17,000.000 $17,600.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
EA 1.000 $12,000.000 $24,000.000 $20,000.000 $22,500.000 $22,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 20.000 $1,140.000 $1,500.000 $1,170.000 $1,500.000 $1,250.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $1,500.000 $1,800.000 $1,500.000 $1,800.000 $1,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $3,200.000 $2,800.000 $2,600.000 $2,700.000 $2,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $3,500.000 $4,500.000 $5,200.000 $4,800.000 $4,200.000
CLEAN EXIST CULVERTS
EA 6.000 $1,500.000 $5,000.000 $2,500.000 $5,000.000 $3,300.000
RAISING EXIST STRUCT
LS 1.000 $60,000.000 $150,000.000 $69,855.190 $75,000.000 $74,800.000
REMOV STR (SET)
EA 24.000 $420.000 $1,000.000 $100.000 $850.000 $350.000
REMOV STR (WINGWALL)
EA 30.000 $1,500.000 $1,750.000 $800.000 $1,425.000 $1,160.000
REMOV STR (HEADWALL)
EA 27.000 $1,500.000 $1,750.000 $800.000 $1,425.000 $1,160.000
REMOV STR (PIPE)
LF 815.000 $15.000 $17.000 $10.000 $12.000 $26.000
REMOV STR (PIPE)
EA 1.000 $650.000 $3,500.000 $1,000.000 $3,250.000 $930.000
MOBILIZATION
LS 1.000 $1,399,467.250 $1,800,000.000 $1,740,000.000 $1,925,000.000 $1,900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $10,000.000 $7,000.000 $4,800.000 $19,000.000 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,061.000 $31.000 $25.000 $36.000 $39.000 $39.600
ROCK FILTER DAMS (REMOVE)
LF 3,061.000 $10.000 $3.000 $9.000 $10.000 $9.900
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 223.000 $25.000 $20.000 $35.000 $35.000 $38.500
CONSTRUCTION EXITS (REMOVE)
SY 223.000 $7.500 $3.000 $10.000 $10.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 30,564.000 $3.500 $3.000 $3.750 $5.200 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 30,564.000 $0.750 $0.500 $0.250 $0.270 $0.500
PTB (DES SRCE)(SGL SLP)(TY 1) OR (STL)
LF 600.000 $15.000 $18.000 $34.800 $27.000 $15.250
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 2,790.000 $10.000 $14.000 $25.200 $27.000 $9.250
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 600.000 $12.000 $15.000 $34.800 $27.000 $15.250
INTERSECTIONS (ACP)
SY 1,799.000 $60.000 $60.000 $80.640 $60.000 $75.000
DRIVEWAYS (CONC)
SY 180.000 $95.000 $125.000 $160.000 $140.000 $122.000
DRIVEWAYS (ACP)
SY 3,951.000 $25.000 $30.000 $50.000 $48.000 $61.500
TURNOUTS (ACP)
SY 61.000 $60.000 $50.000 $54.000 $100.000 $70.000
MTL W-BEAM GD FEN (STEEL POST)
LF 4,125.000 $35.000 $35.000 $33.500 $32.000 $27.050
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $2,850.000 $2,500.000 $2,750.000 $3,000.000 $2,336.400
REMOVE METAL BEAM GUARD FENCE
LF 5,830.000 $2.200 $5.000 $2.000 $3.250 $2.200
GUARDRAIL END TREATMENT (INSTALL)
EA 32.000 $3,500.000 $3,500.000 $3,050.000 $3,100.000 $3,009.600
GUARDRAIL END TREATMENT (REMOVE)
EA 44.000 $285.000 $750.000 $200.000 $275.000 $330.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 10.000 $1,900.000 $3,000.000 $2,500.000 $4,400.000 $2,900.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,000.000 $1,000.000 $1,750.000 $2,100.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $30,000.000 $12,000.000 $6,500.000 $28,500.000 $35,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 19.000 $215.000 $250.000 $300.000 $245.000 $247.500
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $270.000 $300.000 $370.000 $275.000 $280.500
ALUMINUM SIGNS (TY A)
SF 617.500 $35.000 $25.000 $29.000 $19.000 $19.250
ALUMINUM SIGNS (TY G)
SF 244.750 $35.000 $35.000 $32.000 $27.000 $27.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $550.000 $750.000 $900.000 $698.000 $715.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $610.000 $950.000 $1,000.000 $940.000 $962.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
EA 2.000 $1,100.000 $1,100.000 $1,250.000 $1,100.000 $1,127.500
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $800.000 $950.000 $1,250.000 $970.000 $990.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,340.000 $950.000 $1,550.000 $970.000 $990.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 9.000 $1,300.000 $2,000.000 $1,425.000 $1,850.000 $1,925.000
IN SM RD SN SUP&AM TYTWT(1)UA(P)
EA 41.000 $550.000 $600.000 $675.000 $590.000 $605.000
IN SM RD SN SUP&AM TYTWT(1)UA(T)
EA 12.000 $650.000 $650.000 $725.000 $650.000 $660.000
REMOVE SM RD SN SUP&AM
EA 86.000 $125.000 $150.000 $100.000 $100.000 $110.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 86.000 $240.000 $300.000 $400.000 $250.000 $495.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 101.000 $240.000 $100.000 $150.000 $90.000 $93.500
REMOVE DELIN & OBJECT MARKER ASSMS
EA 81.000 $35.000 $35.000 $15.000 $38.000 $38.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 124.000 $50.000 $40.000 $20.000 $35.000 $54.450
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 100,600.000 $0.800 $0.600 $0.500 $0.540 $0.550
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 100,600.000 $0.800 $0.650 $0.550 $0.590 $0.610
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,941.000 $1.820 $1.500 $1.000 $1.080 $1.100
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 9.000 $1.700 $3.500 $3.000 $3.230 $3.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,936.000 $1.250 $2.000 $1.500 $1.610 $1.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 323.000 $9.500 $25.000 $20.000 $21.510 $22.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 8,936.000 $0.830 $0.750 $0.680 $0.730 $0.750
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 5,120.000 $0.800 $0.750 $0.680 $0.730 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 9,085.000 $0.850 $0.750 $0.680 $0.730 $0.750
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 97,187.000 $1.250 $1.200 $0.980 $1.050 $1.210
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 4,024.000 $1.450 $1.300 $1.060 $1.140 $1.180
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 74,734.000 $1.250 $1.150 $1.060 $1.140 $1.200
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $230.000 $350.000 $300.000 $325.000 $330.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 10.000 $450.000 $800.000 $775.000 $825.000 $852.500
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $295.000 $500.000 $400.000 $430.000 $440.000
REFL PAV MRKR TY I-C
EA 448.000 $4.450 $7.000 $6.000 $6.450 $6.600
REFL PAV MRKR TY II-A-A
EA 1,487.000 $4.000 $7.000 $5.500 $5.910 $6.050
TRAFFIC BUTTON TY W
EA 294.000 $5.000 $15.000 $12.000 $12.900 $13.200
TRAFFIC BUTTON TY Y
EA 294.000 $2.500 $15.000 $12.000 $12.900 $13.200
ELIM EXT PAV MRK & MRKS (4")
LF 3,920.000 $0.800 $1.500 $1.250 $1.340 $1.380
SPOT MOWING
AC 61.000 $200.000 $150.000 $100.000 $120.000 $90.000
REPAIR (TRACC)
EA 12.000 $5,000.000 $3,500.000 $5,000.000 $2,000.000 $3,500.000
REP STL BRIDGE MEMBER (BEARINGS)
EA 56.000 $3,000.000 $600.000 $429.880 $450.000 $462.000
D-GR HMA TY-D PG64-22
TON 3,245.000 $125.000 $120.000 $129.400 $160.000 $155.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 19,691.000 $115.000 $115.000 $129.700 $127.000 $142.000
SP MIXES SP-C SAC-B PG64-22
TON 31,167.000 $102.000 $115.000 $124.500 $125.000 $142.000
UNDERSEAL COURSE
GAL 70,821.000 $3.000 $4.500 $5.100 $0.010 $0.010
POLYESTER POLYMER CONC OVERLAY (2")
SY 3,130.000 $440.000 $250.000 $238.580 $239.000 $263.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 180.000 $100.000 $60.000 $100.500 $120.000 $93.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $17,000.000 $21,282.910 $9,500.000 $13,200.000
TMA (STATIONARY)
DAY 180.000 $230.000 $300.000 $292.880 $500.000 $203.500
TMA (MOBILE OPERATION)
HR 160.000 $65.000 $85.000 $35.000 $50.000 $58.300
Totals: $16,703,962.290 $18,187,374.400 $19,345,671.920 $19,349,479.920 $19,824,787.456