HALL FM 1619 (1650-01-010)

Items: 38

County: HALL
Length: N/A
Highway: FM 1619
District: CHILDRESS
Control Number: 1650-01-010
DBE Goal: N/A
Project: BR 2022(655)
Guaranty: N/A
Time: 115 WORKING DAYS
Engineer's Estimate: $1,306,327.65
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,306,327.65
$1,575,474.20
Over/Under Est: 20.6% $269,146.55
Over/Under Est: 39.5% $515,991.45
Amt Left: 15.67% $246,844.90
Over/Under Est: 44.54% $581,902.15
Amt Left: 19.85% $312,755.60
Delta: -3.62% -$65,910.70
$1,979,253.65
Over/Under Est: 51.51% $672,926.00
Amt Left: 25.63% $403,779.45
Delta: -4.82% -$91,023.85
$2,255,278.70
Over/Under Est: 72.64% $948,951.05
Amt Left: 43.15% $679,804.50
Delta: -13.95% -$276,025.05

Bid Items & Bid Tabulations

38 Total 0 of 38
HALL  |  FM 1619  |  CHILDRESS  |  1650-01-010  |  08/04/2022  |  $1,306,327.65  |  BR 2022(655)  |  BRIDGE REPL  |  115 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
COPPELL CONSTRUCTION CO., INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
GILVIN-TERRILL, LTD.
J. LEE MILLIGAN, INC.
REMOVING STAB BASE AND ASPH PAV(8")
SY 1,222.000 $20.000 $9.000 $15.000 $20.000 $10.000 $14.000
EXCAVATION (ROADWAY)
CY 27.000 $30.000 $20.000 $135.000 $100.000 $25.000 $560.000
EXCAVATION (CHANNEL)
CY 464.000 $20.000 $20.000 $24.000 $40.000 $25.000 $29.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 5,557.000 $20.000 $30.000 $41.000 $35.000 $27.500 $33.350
BLADING
HR 5.000 $180.000 $125.000 $185.000 $100.000 $250.000 $540.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
AC 2.400 $2,500.000 $2,500.000 $2,320.000 $2,500.000 $3,400.000 $2,010.000
VEGETATIVE WATERING
MG 94.000 $20.000 $60.000 $61.000 $1.000 $40.000 $60.000
PROOF ROLLING
HR 4.000 $85.000 $80.000 $450.000 $50.000 $400.000 $200.000
FL BS(CMP IN PLC)(TYA GR3)(FINAL POS)8"
SY 4,035.000 $30.000 $35.000 $34.000 $45.000 $30.000 $24.250
PRIME COAT (MC-30)
GAL 1,211.000 $5.700 $7.000 $6.500 $15.000 $6.000 $6.700
ASPH (CRS-2P)
GAL 1,614.000 $8.200 $7.000 $11.500 $15.000 $7.000 $6.800
AGGR(TY-B GR-4 SAC-A)
CY 32.000 $240.000 $500.000 $918.000 $1,200.000 $200.000 $290.000
CEM STABIL BKFL
CY 59.000 $250.000 $300.000 $400.000 $250.000 $500.000 $350.000
DRILL SHAFT (36 IN)
LF 660.000 $220.000 $330.000 $382.000 $340.000 $375.000 $310.000
CL C CONC (ABUT)
CY 37.500 $1,420.000 $1,500.000 $1,622.000 $1,500.000 $2,250.000 $2,280.000
CL C CONC (CAP)
CY 30.000 $1,200.000 $1,500.000 $1,533.000 $1,600.000 $2,250.000 $2,750.000
CL C CONC (COLUMN)
CY 4.700 $1,250.000 $1,500.000 $2,800.000 $1,800.000 $2,250.000 $3,115.000
REINF CONC SLAB
SF 5,950.000 $26.000 $36.000 $36.000 $40.000 $40.000 $50.800
APPROACH SLAB
CY 66.900 $850.000 $800.000 $1,218.000 $1,000.000 $1,750.000 $785.000
PRESTR CONC GIRDER (TX28)
LF 693.880 $205.000 $240.000 $305.000 $285.000 $255.000 $295.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 295.000 $160.000 $200.000 $227.000 $260.000 $300.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 24.000 $950.000 $550.000 $916.000 $650.000 $750.000 $1,025.000
RAIL (TY T223)
LF 382.000 $140.000 $150.000 $236.000 $200.000 $200.000 $250.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 71.000 $150.000 $250.000 $319.000 $200.000 $300.000 $330.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $62,000.000 $60,000.000 $35,000.000 $60,000.000 $142,500.000 $229,000.000
MOBILIZATION
LS 1.000 $121,029.750 $150,000.000 $154,000.000 $165,000.000 $135,000.000 $225,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,500.000 $2,300.000 $1,500.000 $10,000.000 $20,000.000 $30,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 300.000 $7.000 $12.000 $7.000 $10.000 $10.000 $9.400
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $47.000 $38.000 $38.000 $40.000 $34.000 $41.200
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,400.000 $2,800.000 $2,500.000 $2,750.000 $3,115.000
REMOVE METAL BEAM GUARD FENCE
LF 80.000 $5.000 $5.000 $30.000 $5.000 $20.000 $4.250
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,300.000 $3,800.000 $3,800.000 $3,200.000 $3,400.000 $4,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $25.000 $15.000 $24.000 $30.000 $25.000 $21.150
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 12.000 $35.000 $30.000 $36.000 $30.000 $27.000 $21.150
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,200.000 $5.000 $3.200 $3.000 $3.500 $2.750 $2.900
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 400.000 $5.000 $3.200 $3.000 $3.000 $2.750 $2.900
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 425.000 $5.000 $3.200 $3.000 $3.000 $2.750 $2.900
TMA (STATIONARY)
DAY 4.000 $245.000 $250.000 $671.000 $500.000 $950.000 $590.000
Totals: $1,306,327.650 $1,575,474.200 $1,822,319.100 $1,888,229.800 $1,979,253.650 $2,255,278.700