PREPARING ROW
|
STA
|
33.000
|
$15,000.000
|
$17,500.000
|
$15,000.000
|
$12,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
190.000
|
$45.000
|
$15.000
|
$45.000
|
$30.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-12")
|
SY
|
7,384.000
|
$13.000
|
$10.000
|
$15.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,687.000
|
$22.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
250.000
|
$22.000
|
$20.000
|
$20.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
26,402.000
|
$25.000
|
$30.000
|
$20.000
|
$40.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
12,976.500
|
$1.000
|
$0.500
|
$0.400
|
$1.000
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
23,350.000
|
$2.500
|
$0.500
|
$0.300
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
400.000
|
$30.000
|
$30.000
|
$44.500
|
$1.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
9,718.000
|
$23.000
|
$40.000
|
$30.000
|
$60.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,943.000
|
$20.000
|
$10.000
|
$7.500
|
$15.000
|
|
|
AGGR(TY-L GR-3LW SAC-A)
|
CY
|
131.000
|
$100.000
|
$250.000
|
$175.000
|
$1,200.000
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
3,888.000
|
$7.000
|
$10.000
|
$10.000
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
140.000
|
$300.000
|
$300.000
|
$750.000
|
$350.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
40.000
|
$200.000
|
$120.000
|
$200.000
|
$300.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,115.000
|
$350.000
|
$380.000
|
$450.000
|
$520.000
|
|
|
CL C CONC (ABUT)
|
CY
|
56.000
|
$1,300.000
|
$2,000.000
|
$2,000.000
|
$2,200.000
|
|
|
CL C CONC (BENT)
|
CY
|
162.000
|
$1,650.000
|
$2,000.000
|
$2,000.000
|
$2,400.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
65.900
|
$1,800.000
|
$2,000.000
|
$2,000.000
|
$2,500.000
|
|
|
REINF CONC SLAB
|
SF
|
37,800.000
|
$37.500
|
$35.000
|
$40.000
|
$45.000
|
|
|
APPROACH SLAB
|
CY
|
67.400
|
$1,050.000
|
$1,200.000
|
$2,000.000
|
$1,500.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
4,500.000
|
$265.000
|
$250.000
|
$275.000
|
$270.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
574.000
|
$250.000
|
$150.000
|
$250.000
|
$260.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
61.000
|
$600.000
|
$750.000
|
$833.000
|
$800.000
|
|
|
RAIL (TY SSTR)
|
LF
|
1,860.000
|
$220.000
|
$125.000
|
$90.000
|
$180.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
210.000
|
$250.000
|
$220.000
|
$250.000
|
$300.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
6.000
|
$1,500.000
|
$1,000.000
|
$2,150.000
|
$12,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$10,250.000
|
$12,000.000
|
$10,000.000
|
$5,000.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$650,000.000
|
$400,000.000
|
$500,000.000
|
$500,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$827,680.720
|
$1,000,000.000
|
$825,000.000
|
$1,140,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$9,000.000
|
$2,500.000
|
$50,000.000
|
$13,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
432.000
|
$60.000
|
$65.000
|
$75.000
|
$1.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
432.000
|
$15.000
|
$10.000
|
$15.000
|
$1.000
|
|
|
BULLDOZER WORK (EROSION & SEDMT CONT)
|
HR
|
72.000
|
$175.000
|
$120.000
|
$175.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,047.000
|
$4.000
|
$4.000
|
$3.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,047.000
|
$2.000
|
$1.500
|
$1.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
302.000
|
$5.000
|
$8.000
|
$10.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
302.000
|
$2.500
|
$1.500
|
$2.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,206.000
|
$200.000
|
$75.000
|
$80.000
|
$450.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
4,734.000
|
$50.000
|
$150.000
|
$140.000
|
$120.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
6,332.000
|
$10.000
|
$15.000
|
$15.000
|
$40.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
3,585.000
|
$20.000
|
$10.000
|
$23.000
|
$70.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
824.500
|
$33.000
|
$40.000
|
$35.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,500.000
|
$2,350.000
|
$2,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$6,000.000
|
$3,500.000
|
$3,300.000
|
$3,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
744.000
|
$4.400
|
$5.000
|
$8.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$300.000
|
$250.000
|
$400.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
18.000
|
$1,300.000
|
$3,000.000
|
$2,550.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$1,250.000
|
$2,000.000
|
$1,500.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
8.000
|
$6,000.000
|
$12,000.000
|
$8,250.000
|
$12,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$90.000
|
$1,000.000
|
$750.000
|
$2,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$700.000
|
$600.000
|
$725.000
|
$2,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$160.000
|
$200.000
|
$100.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$19.000
|
$30.000
|
$18.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
2.000
|
$400.000
|
$600.000
|
$475.000
|
$600.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
15.000
|
$15.000
|
$25.000
|
$15.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$55.000
|
$40.000
|
$30.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
28.000
|
$56.000
|
$50.000
|
$120.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
|
EA
|
2.000
|
$350.000
|
$600.000
|
$600.000
|
$600.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
298.000
|
$6.300
|
$12.000
|
$7.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
17,703.000
|
$1.500
|
$1.500
|
$1.300
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
11,716.000
|
$2.300
|
$1.500
|
$1.300
|
$2.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
12,774.000
|
$0.450
|
$1.000
|
$0.520
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
6,387.000
|
$1.000
|
$1.500
|
$1.140
|
$2.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
6,387.000
|
$1.000
|
$1.500
|
$1.140
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
160.000
|
$5.000
|
$12.000
|
$8.000
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,024.000
|
$0.500
|
$2.000
|
$2.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
12,774.000
|
$0.250
|
$1.000
|
$0.490
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,000.000
|
$15,000.000
|
$18,500.000
|
$75,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
900.000
|
$70.000
|
$50.000
|
$250.000
|
$300.000
|
|
Totals: |
$9,185,018.820
|
$9,334,727.250
|
$10,741,982.900
|
$12,854,647.500
|