Show Job Controls
Bid Cobra

HALE IH0027 (6333-55-001)

Items: 38

County: HALE
Length: N/A
Highway: IH0027
District: LUBBOCK
Control Number: 6333-55-001
DBE Goal: N/A
Project: RMC - 633355001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $278,250.00
Date: 07/17/2018 (7 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$278,250.00
$276,585.00
Over/Under Est: -0.6% -$1,665.00

Bid Items & Bid Tabulations

38 Total 0 of 38
HALE  |  IH0027  |  LUBBOCK  |  6333-55-001  |  07/17/2018  |  $278,250.00  |  RMC - 633355001  |  GUARDRAIL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BARRICADES UNLIMITED
MOBILIZATION (CALLOUT)
EA 25.000 $250.000 $2,100.000
MOBILIZATION (EMERGENCY)
EA 15.000 $350.000 $1,500.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,000.000 $20.000 $18.000
MTL THRIE-BEAM GD FEN (STEEL POST)
LF 150.000 $75.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,750.000 $22.000
MTL BEAM GD FEN TRANS (TL2)
EA 5.000 $1,000.000 $100.000
MTL BEAM GD FEN TRANS (T101)
EA 5.000 $1,000.000 $100.000
MTL BEAM GD FEN TRANS (T6)
EA 5.000 $1,000.000 $100.000
SHORT RADIUS
LF 150.000 $35.000 $20.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,000.000 $1,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $35.000 $10.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 100.000 $50.000 $15.000
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
EA 5.000 $1,000.000 $500.000
MTL BEAM GD FEN TRANS (TL2) 28"
EA 5.000 $1,000.000 $600.000
MTL BM GD FEN TRANS (31"-28")
EA 5.000 $1,000.000 $500.000
REMOVE METAL BEAM GUARD FENCE
LF 2,500.000 $3.000 $0.010
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $250.000 $1.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $150.000 $1.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $400.000 $1.000
RM MTL BM GD FEN TRANS (T101)
EA 5.000 $200.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,500.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $250.000 $100.000
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
EA 5.000 $2,500.000 $1,700.000
GUARDRAIL END TRTMNT(RETRO)(WOOD POST)
EA 5.000 $2,500.000 $1,700.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $25.000 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 100.000 $25.000 $5.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 100.000 $25.000 $5.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 100.000 $25.000 $5.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,500.000 $15.000 $18.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $25.000 $22.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 100.000 $30.000 $22.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $25.000 $20.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 250.000 $25.000 $100.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 250.000 $25.000 $50.000
REALIGN POSTS
EA 100.000 $5.000 $10.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $15.000 $10.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $500.000 $100.000
TMA (STATIONARY)
DAY 220.000 $50.000 $1.000
Totals: $278,250.000 $276,585.000