Show Job Controls
Bid Cobra

HALE CR (0905-12-044)

Items: 36

County: HALE
Length: N/A
Highway: CR
District: LUBBOCK
Control Number: 0905-12-044
DBE Goal: N/A
Project: BR 1802(835)
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $381,373.00
Date: 07/08/2020 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$381,373.00
Over/Under Est: 14.38% $54,857.00
Over/Under Est: 30.94% $117,978.00
Amt Left: 14.47% $63,121.00
Over/Under Est: 34.55% $131,760.00
Amt Left: 17.63% $76,903.00
Delta: -2.76% -$13,782.00
Over/Under Est: 72.51% $276,531.00
Amt Left: 50.82% $221,674.00
Delta: -28.21% -$144,771.00

Bid Items & Bid Tabulations

36 Total 0 of 36
HALE  |  CR  |  LUBBOCK  |  0905-12-044  |  07/08/2020  |  $381,373.00  |  BR 1802(835)  |  BRIDGE REPL  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BLACKSTONE CONCRETE VENTURES, LLC
STATELINE CONSTRUCTION, LLC
EARTH BUILDERS, L.P.
O. TREVINO CONSTRUCTION, LLC
PREPARING ROW
STA 4.000 $2,000.000 $8,000.000 $4,500.000 $15,000.000 $10,000.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 5.000 $400.000 $500.000 $1,000.000 $500.000 $2,000.000
REMOVING UNTREATED BASE (8")
SY 867.000 $10.000 $15.000 $14.000 $10.000 $50.000
EXCAVATION (ROADWAY)
CY 255.000 $25.000 $20.000 $26.000 $25.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 85.000 $35.000 $10.000 $55.000 $25.000 $70.000
FL BS (CMP IN PLC)(TY D GR 4) (6")
SY 867.000 $25.000 $25.000 $42.000 $25.000 $84.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 161.000 $8.000 $15.000 $32.000 $20.000 $30.000
CEM STABIL BKFL
CY 40.500 $300.000 $600.000 $285.000 $300.000 $350.000
TEMPORARY SPL SHORING
SF 1,301.000 $30.000 $15.000 $33.000 $28.000 $25.000
APPROACH SLAB
CY 42.000 $550.000 $750.000 $785.000 $800.000 $900.000
RAIL (TY T223)
LF 82.000 $250.000 $250.000 $135.000 $150.000 $400.000
GABION MATTRESSES (GALV)(9 IN)
SY 81.000 $75.000 $250.000 $69.000 $135.000 $200.000
GABIONS (3' X 3')(GALV)
CY 52.500 $300.000 $150.000 $295.000 $320.000 $200.000
CONC BOX CULV (5 FT X 4 FT)
LF 114.000 $600.000 $500.000 $875.000 $1,150.000 $950.000
RC PIPE (CL III)(24 IN)
LF 32.000 $100.000 $250.000 $310.000 $75.000 $200.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $20,000.000 $10,000.000 $22,650.000 $20,000.000 $24,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $5,500.000 $1,400.000 $1,800.000 $4,000.000
REMOV STR (PIPE)
LF 165.000 $35.000 $20.000 $85.000 $25.000 $60.000
MOBILIZATION
LS 1.000 $35,000.000 $45,000.000 $42,000.000 $50,000.000 $65,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,000.000 $1,000.000 $5,900.000 $2,500.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 80.000 $40.000 $85.000 $45.000 $45.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $40.000 $10.000 $10.000 $5.000 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $5.000 $1.000 $3.000 $5.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $5.000 $1.000 $1.000 $2.000 $5.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 220.000 $2.500 $1.000 $8.000 $16.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 220.000 $2.500 $1.000 $4.000 $2.000 $5.000
DRIVEWAYS (BASE)
SY 24.000 $40.000 $45.000 $65.000 $30.000 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 175.000 $30.000 $135.000 $29.000 $38.000 $50.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $2,000.000 $6,000.000 $1,800.000 $1,800.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $2,500.000 $1,800.000 $1,800.000 $2,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,500.000 $3,000.000 $3,200.000 $3,000.000 $5,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $500.000 $500.000 $1,500.000 $1,000.000 $1,400.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $40.000 $500.000 $45.000 $25.000 $32.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 12.000 $30.000 $500.000 $45.000 $75.000 $32.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 6.000 $100.000 $100.000 $45.000 $75.000 $240.000
LITTER REMOVAL
CYC 1.000 $4,500.000 $5,000.000 $5,000.000 $1,200.000 $80.000
Totals: $381,373.000 $436,230.000 $499,351.000 $513,133.000 $657,904.000