HALE CS (0905-12-043)

Items: 43

County: HALE
Length: N/A
Highway: CS
District: LUBBOCK
Control Number: 0905-12-043
DBE Goal: N/A
Project: BR 1802(838)
Guaranty: N/A
Time: 109 WORKING DAYS
Engineer's Estimate: $893,267.50
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$893,267.50
Over/Under Est: -5.18% -$46,239.73
$1,133,573.50
Over/Under Est: 26.9% $240,306.00
Amt Left: 33.83% $286,545.73

Bid Items & Bid Tabulations

43 Total 0 of 43
HALE  |  CS  |  LUBBOCK  |  0905-12-043  |  02/04/2022  |  $893,267.50  |  BR 1802(838)  |  BRIDGE REPL  |  109 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BLACKSTONE CONCRETE VENTURES, LLC
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 8.000 $2,500.000 $4,000.000 $1,000.000
PREPARING ROW (TREE)(10" TO 48" DIA)
EA 1.000 $1,000.000 $3,100.000 $1,000.000
REMOVING CONC (CURB AND GUTTER)
LF 9.000 $75.000 $40.000 $50.000
REMOVING CONC (MISC)
SY 62.500 $75.000 $50.000 $75.000
EXCAVATION (ROADWAY)
CY 706.000 $20.000 $25.000 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 250.000 $30.000 $15.000 $50.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 2,480.000 $1.000 $4.000 $1.500
PROOF ROLLING
HR 10.000 $150.000 $800.000 $150.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 3,275.000 $25.000 $15.000 $25.000
PRIME COAT (MC-30)
GAL 655.000 $10.000 $6.000 $10.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 322.000 $10.000 $6.000 $15.000
FOG SEAL (CSS-1H)
GAL 589.000 $10.000 $6.000 $10.000
CEM STABIL BKFL
CY 244.000 $200.000 $350.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 116.000 $20.000 $100.000 $1.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 770.000 $30.000 $15.000 $50.000
CL C CONC (RAIL FOUNDATION)
CY 11.000 $1,500.000 $500.000 $1,500.000
RIPRAP (CONC)(6 IN)
CY 17.500 $1,000.000 $500.000 $1,000.000
RIPRAP (SPECIAL)
CY 20.000 $1,000.000 $500.000 $1,000.000
RIPRAP (CONC)(DISSIPATER)
CY 0.500 $4,000.000 $500.000 $1,500.000
RAIL (TY C411)
LF 148.000 $250.000 $300.000 $350.000
GABION MATTRESSES (GALV)(9 IN)
SY 85.500 $200.000 $85.000 $300.000
CONC BOX CULV (10 FT X 6 FT)
LF 58.000 $1,500.000 $850.000 $1,500.000
INLET (COMPL)(CURB&GRATE)(TY I)
EA 4.000 $5,000.000 $4,500.000 $6,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $27,000.000 $15,000.000 $30,000.000
CLEAN EXIST CULVERTS
EA 1.000 $2,500.000 $2,500.000 $3,500.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $25,000.000 $127,777.000 $145,000.000
MOBILIZATION
LS 1.000 $81,000.000 $75,302.270 $110,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $1,500.000 $8,000.000 $13,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $30.000 $85.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $10.000 $15.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,660.000 $5.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 830.000 $1.000 $5.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 260.000 $10.000 $5.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 130.000 $1.000 $5.000 $2.000
CONC CURB & GUTTER (TY II)
LF 1,378.000 $40.000 $45.000 $30.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $500.000 $500.000 $700.000
REMOVE SM RD SN SUP&AM
EA 8.000 $100.000 $250.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $50.000 $25.000 $70.000
LITTER REMOVAL
CYC 1.000 $1,000.000 $2,500.000 $535.000
TACK COAT
GAL 459.000 $10.000 $15.000 $5.000
D-GR HMA TY-C PG 70-28 (EXEMPT)
TON 361.000 $250.000 $130.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 392.000 $200.000 $20.000 $80.000
TMA (STATIONARY)
DAY 109.000 $250.000 $10.000 $315.000
Totals: $893,267.500 $847,027.770 $1,133,573.500