Job Info for 6439-02-001

County: GUADALUPE Highway: FM1339 Date: 07/19/2023 (1 year ago) Engineer's Estimate: $102,540 Control Number: 6439-02-001
Project: BPM - 643902001 District: SAN ANTONIO Time: 16 W Type: EROSION REPAIR
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $102,540.15
GARRET SHIELDS INFRASTRUCTURE   $87,314.00 1
-14.85% | -$15,226.15
DIAMOND R CONTRACTING, LLC   $95,000.00 2
-7.35% | -$7,540.15
8.8% | $7,686.00
PATHFIELD INVESTMENTS LLC   $95,010.00 3
-7.34% | -$7,530.15
8.81% | $7,696.00
0.01% | $10.00
BECK-REIT & SONS, LTD.   $106,716.00 4
4.07% | $4,175.85
22.22% | $19,402.00
12.32% | $11,706.00
TALBRAN ENTERPRISES LLC   $118,594.00 5
15.66% | $16,053.85
35.82% | $31,280.00
11.13% | $11,878.00
DUNN SERVICES, INC.   $132,895.56 6
29.6% | $30,355.41
52.2% | $45,581.56
12.06% | $14,301.56
DOUBLE L CONTRACTING, LLC   $195,300.00 7
90.46% | $92,759.85
123.68% | $107,986.00
46.96% | $62,404.44

Bid Items

Items: 17, 0 filtered
GUADALUPE FM1339  |  SAN ANTONIO  |  6439-02-001  |  07/19/2023  |  $102,540  |  BPM - 643902001  |  EROSION REPAIR  |  16 W
Item code Description Unit Quantity Engineer's Estimate GARRET SHIELDS INFRASTRUCTURE DIAMOND R CONTRACTING, LLC PATHFIELD INVESTMENTS LLC BECK-REIT & SONS, LTD. TALBRAN ENTERPRISES LLC DUNN SERVICES, INC. DOUBLE L CONTRACTING, LLC
104 6064 REMOVING CONC (MISC) CY 7.000 $845.500 $100.000 $1,000.000 $200.000 $100.000 $440.000 $92.160 $1,000.000
110 6002 EXCAVATION (CHANNEL) CY 10.000 $43.360 $100.000 $600.000 $60.000 $100.000 $440.000 $120.000 $200.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 10.000 $61.920 $50.000 $600.000 $100.000 $100.000 $110.000 $45.000 $400.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 250.000 $3.940 $20.000 $20.000 $25.000 $10.000 $2.000 $5.000 $30.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 250.000 $1.380 $1.000 $1.000 $5.000 $1.000 $2.000 $0.720 $10.000
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 250.000 $2.310 $1.000 $20.000 $15.000 $5.000 $20.000 $4.100 $25.000
432 6022 RIPRAP (STONE COMMON)(DRY)(6 IN) CY 50.000 $295.110 $200.000 $260.000 $400.000 $210.000 $440.000 $475.000 $100.000
459 6007 GABION MATTRESSES (GALV)(12 IN) SY 225.000 $183.170 $150.000 $80.000 $120.000 $200.000 $180.000 $225.000 $200.000
459 6009 GABIONS (3' X 3')(GALV) CY 37.000 $430.000 $400.000 $200.000 $100.000 $300.000 $550.000 $525.000 $450.000
500 6001 MOBILIZATION LS 1.000 $8,000.000 $10,000.000 $10,000.000 $15,000.000 $15,000.000 $14,000.000 $10,500.000 $12,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1.000 $2,500.000 $5,000.000 $5,000.000 $3,000.000 $8,000.000 $500.000 $9,600.000 $7,500.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 112.000 $34.050 $2.000 $10.000 $50.000 $35.000 $1.000 $30.500 $15.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 112.000 $12.900 $2.000 $0.210 $25.000 $10.000 $1.000 $10.770 $10.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 60.000 $7.790 $5.000 $10.000 $25.000 $5.000 $22.000 $21.250 $25.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 60.000 $2.440 $5.000 $0.108 $25.000 $1.000 $22.000 $2.470 $15.000
752 6015 TREE AND BRUSH REMOVAL AC 0.100 $6,000.000 $50,000.000 $10,000.000 $5,000.000 $50,000.000 $22,000.000 $10,000.000 $75,000.000
6185 6002 TMA (STATIONARY) DAY 16.000 $300.650 $1.000 $600.000 $10.000 $1.000 $100.000 $450.000 $4,200.000
Totals: $102,540.15 $87,314.00 $95,000.00 $95,010.00 $106,716.00 $118,594.00 $132,895.56 $195,300.00