Show Job Controls
Bid Cobra

GUADALUPE SH 123 (0366-02-094)

Items: 87

County: GUADALUPE
Length: N/A
Highway: SH 123
District: SAN ANTONIO
Control Number: 0366-02-094
DBE Goal: N/A
Project: C 366-2-94
Guaranty: N/A
Time: 173 WORKING DAYS
Engineer's Estimate: $12,521,320.97
Date: 02/01/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$12,521,320.97
$7,325,978.26
Over/Under Est: -41.49% -$5,195,342.71
Over/Under Est: -39.24% -$4,913,828.42
Amt Left: 3.84% $281,514.29
Over/Under Est: -31.35% -$3,925,256.20
Amt Left: 17.34% $1,270,086.51
Delta: -12.99% -$988,572.22
Over/Under Est: -26.22% -$3,283,343.15
Amt Left: 26.1% $1,911,999.56
Delta: -7.47% -$641,913.05
Subcontractor Percentage Amount
FLASHER EQUIPMENT COMPANY 4.68% $350,195.66
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 3.90% $291,829.71
RUCOBA & MAYA CONSTRUCTION, LLC 2.39% $178,839.24
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 1.22% $91,290.32
ENVIRONMENTAL SAFETY SERVICES, INC. 0.31% $23,196.72
PRIMATE CONSTRUCTION, LP 0.28% $20,951.88
DEPENDABLE FENCE 0.04% $2,993.13
Total: 12.82% $959,296.66

Bid Items & Bid Tabulations

87 Total 0 of 87
GUADALUPE  |  SH 123  |  SAN ANTONIO  |  0366-02-094  |  02/01/2023  |  $12,521,320.97  |  C 366-2-94  |  RESURF ROADWAY  |  173 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
LONE STAR PAVING COMPANY
CLARK CONSTRUCTION OF TEXAS, INC.
TEXAS MATERIALS GROUP, INC.
REMOVING CONCRETE(MOW STRIP)
LF 4,611.340 $9.000 $9.180 $8.600 $10.000 $8.000
BACKFILL (TY A)
STA 314.460 $220.000 $112.500 $125.000 $379.690 $160.000
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 49,841.200 $6.000 $4.060 $4.300 $4.300 $4.000
AGGR (TY-PB GR-4)
CY 1,618.220 $180.000 $95.320 $170.000 $102.340 $155.000
FLEX PAVE STRUCTURE REPAIR (8"-10")
SY 55,135.260 $110.000 $46.740 $55.000 $67.760 $68.500
PLANE ASPH CONC PAV(1.5" MICRO-MILLING)
SY 184,920.910 $1.700 $1.650 $1.000 $1.660 $1.900
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 53.000 $420.000 $290.000 $437.000 $395.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 283.290 $620.000 $610.000 $560.000 $585.000 $600.000
CLEANING AND SEALING JOINTS (CL 7)
LF 560.000 $34.000 $23.000 $23.750 $22.790 $25.000
CLEANING EXISTING JOINTS
LF 560.000 $20.000 $5.500 $5.750 $5.500 $5.000
JOINT SEALANT
LF 560.000 $20.000 $5.500 $5.750 $5.500 $5.000
MOBILIZATION
LS 1.000 $1,138,301.910 $598,233.960 $70,000.000 $150,000.000 $230,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $13,500.000 $4,771.140 $900.000 $1,200.000 $5,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 6,002.000 $7.000 $3.000 $3.000 $5.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,002.000 $3.000 $1.000 $0.700 $1.000 $1.500
MTL W-BEAM GD FEN (TIM POST)
LF 2,925.000 $46.000 $23.000 $27.000 $45.000 $23.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $2,235.000 $2,500.000 $3,500.000 $3,400.000
SHORT RADIUS
LF 50.000 $110.000 $30.500 $87.000 $45.000 $30.850
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 125.000 $45.000 $22.750 $33.000 $38.000 $26.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 175.000 $100.000 $71.000 $90.000 $55.000 $70.000
REMOVE METAL BEAM GUARD FENCE
LF 4,564.650 $4.200 $1.500 $1.600 $2.000 $1.800
GUARDRAIL END TREATMENT (INSTALL)
EA 30.000 $3,680.000 $2,985.000 $3,600.000 $4,400.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 28.000 $420.000 $275.000 $260.000 $350.000 $200.000
CONDT (PVC) (SCH 80) (2")
LF 23.000 $21.000 $30.000 $26.000 $54.000 $54.000
CONDT (PVC) (SCH 80) (3")
LF 46.000 $30.000 $36.000 $60.000 $39.000 $39.000
ELEC CONDR (NO.6) BARE
LF 80.000 $2.000 $2.300 $3.150 $1.600 $1.600
TRAY CABLE (4 CONDR) (12 AWG)
LF 530.000 $2.700 $3.000 $4.000 $2.200 $2.200
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,240.000 $1,200.000 $1,890.000 $975.000 $975.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,400.000 $1,960.000 $2,300.000 $1,500.000 $1,500.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 402.000 $4.100 $2.100 $6.600 $4.000 $4.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 402.000 $5.000 $2.450 $6.600 $4.000 $4.000
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
EA 1.000 $7,400.000 $5,500.000 $8,000.000 $6,000.000 $6,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 47.000 $660.000 $645.000 $680.000 $595.000 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 10.000 $960.000 $685.000 $780.000 $485.000 $810.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 32.000 $820.000 $900.000 $800.000 $540.000 $860.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $1,090.000 $1,055.000 $1,050.000 $540.000 $1,125.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $2,250.000 $1,225.000 $1,150.000 $540.000 $1,450.000
REMOVE SM RD SN SUP&AM
EA 96.000 $133.000 $74.000 $110.000 $85.000 $112.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 35.000 $40.000 $25.000 $37.000 $65.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 74.000 $35.000 $25.000 $37.000 $55.000 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 6,703.000 $0.450 $0.330 $0.600 $0.250 $0.550
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 34,004.000 $0.700 $0.240 $0.500 $0.250 $0.450
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 4,124.000 $0.380 $0.330 $0.650 $0.250 $0.600
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 25,798.000 $0.850 $0.240 $0.500 $0.250 $0.450
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 438.000 $5.000 $4.800 $5.250 $3.000 $5.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 8,350.000 $1.340 $0.870 $1.450 $0.550 $1.300
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 61,227.000 $1.160 $0.870 $0.700 $0.550 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,368.000 $2.250 $1.600 $1.250 $1.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 5,069.000 $2.000 $1.600 $0.750 $1.000 $2.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 747.000 $10.000 $1.230 $2.000 $1.250 $1.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,166.000 $1.600 $0.980 $1.000 $0.850 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 860.000 $8.000 $6.320 $7.350 $55.000 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 93.000 $250.000 $139.000 $157.000 $125.000 $150.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 8.000 $400.000 $410.000 $265.000 $250.000 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 29.000 $200.000 $167.000 $182.000 $125.000 $175.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 5.000 $100.000 $41.000 $57.500 $25.000 $55.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 7.000 $590.000 $405.000 $400.000 $400.000 $375.000
PAVEMENT SEALER 6"
LF 140,496.000 $0.310 $0.180 $0.250 $0.200 $0.200
PAVEMENT SEALER 8"
LF 4,726.000 $1.000 $0.250 $0.350 $0.300 $0.330
PAVEMENT SEALER 24"
LF 860.000 $3.500 $2.220 $4.000 $1.000 $3.750
PAVEMENT SEALER (ARROW)
EA 101.000 $76.000 $73.000 $77.500 $70.000 $75.000
PAVEMENT SEALER (WORD)
EA 29.000 $78.000 $80.000 $77.500 $70.000 $75.000
PAVEMENT SEALER (MED NOSE)
EA 7.000 $300.000 $198.000 $35.000 $150.000 $30.000
PAVEMENT SEALER (YLD TRI)
EA 5.000 $50.000 $33.000 $158.000 $10.000 $150.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 5,865.000 $0.650 $0.770 $0.850 $0.450 $0.800
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 61,314.000 $1.050 $1.170 $1.050 $0.750 $1.000
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 4,727.000 $0.850 $1.420 $1.150 $0.750 $1.100
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 68,590.000 $1.100 $1.170 $1.050 $0.750 $1.000
REFL PAV MRKR TY I-C
EA 536.000 $14.000 $4.800 $5.250 $4.000 $6.000
REFL PAV MRKR TY II-A-A
EA 1,977.000 $4.200 $4.800 $5.250 $4.000 $5.500
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $10,050.000 $2,500.000 $6,000.000 $2,400.000 $2,400.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $8,000.000 $3,500.000 $2,700.000 $2,100.000 $2,100.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $300.000 $299.000 $377.000 $250.000 $300.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $290.000 $299.000 $377.000 $250.000 $300.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 750.000 $2.500 $1.650 $3.500 $2.500 $2.520
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $1,100.000 $650.000 $840.000 $950.000 $1,000.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $8,000.000 $5,900.000 $9,000.000 $5,700.000 $6,000.000
INS TRF SIG PL AM (S)STR(TY B)
EA 1.000 $6,400.000 $6,500.000 $7,500.000 $7,000.000 $7,250.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 3.000 $10,000.000 $8,350.000 $8,400.000 $8,500.000 $9,000.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 4,253.180 $175.000 $92.700 $105.000 $85.440 $155.000
SP MIXES SP-D SAC-B PG70-22
TON 544.680 $150.000 $94.860 $110.000 $128.600 $120.000
PFC-F PG76-22 SAC-A
TON 14,017.840 $134.080 $130.140 $150.500 $163.910 $177.000
TACK COAT
GAL 24,810.890 $3.750 $3.470 $3.000 $3.000 $2.500
UNDERSEAL COURSE
GAL 1,037.490 $5.000 $4.950 $7.000 $4.500 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 234.000 $125.000 $119.070 $97.000 $100.000 $100.000
TMA (STATIONARY)
DAY 41.000 $300.000 $235.980 $300.000 $200.000 $100.000
TMA (MOBILE OPERATION)
DAY 77.000 $286.000 $270.620 $325.000 $225.000 $250.000
Totals: $12,521,320.972 $7,325,978.305 $7,607,492.554 $8,596,064.817 $9,237,977.834