County: GUADALUPE Highway: UA 90 Date: 06/28/2023 (1 year ago) Engineer's Estimate: $2,435,888 Control Number: 0025-04-051
Project: STP 2023(951)HES District: SAN ANTONIO Time: 150 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,435,888.44
HUNTER INDUSTRIES, LTD.   $2,221,434.35 1
-8.8% | -$214,454.09
ACME BRIDGE COMPANY, INC.   $2,353,335.48 2
-3.39% | -$82,552.96
5.94% | $131,901.13
CK NEWBERRY, LLC   $2,482,036.96 3
1.89% | $46,148.52
11.73% | $260,602.61
5.47% | $128,701.48
TEXAS MATERIALS GROUP, INC.   $2,590,543.08 4
6.35% | $154,654.64
16.62% | $369,108.73
4.37% | $108,506.12
DUNN SERVICES, INC.   $3,182,579.83 5
30.65% | $746,691.39
43.27% | $961,145.48
22.85% | $592,036.75
Subcontractor Percentage Amount
INTERSTATE CONCRETE & STEEL SERVICES INCORPORATED 13.63% $302,781.50
D. I. J. CONSTRUCTION, INC. 4.62% $102,630.27
A K FUQUAY CONSTRUCTION 1.21% $26,879.36
FLASHER EQUIPMENT COMPANY 0.88% $19,548.62
MURRAY CONSTRUCTION 0.86% $19,104.34
Total: 21.20% $470,944.09

Bid Items

Items: 54, 0 filtered
GUADALUPE UA 90  |  SAN ANTONIO  |  0025-04-051  |  06/28/2023  |  $2,435,888  |  STP 2023(951)HES  |  HAZARD ELIM & SAFETY  |  150 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HUNTER INDUSTRIES, LTD. ACME BRIDGE COMPANY, INC. CK NEWBERRY, LLC TEXAS MATERIALS GROUP, INC. DUNN SERVICES, INC.
100 6002 PREPARING ROW STA 69.000 $2,600.000 $991.700 $1,000.000 $115.000 $1,300.000 $32.870
104 6009 REMOVING CONC (RIPRAP) SY 53.000 $8.000 $26.900 $31.400 $75.000 $24.000 $377.230
105 6014 REMOVING STAB BASE & ASPH PAV (7"-12") SY 13,850.000 $8.000 $4.700 $4.500 $6.000 $9.600 $11.260
110 6001 EXCAVATION (ROADWAY) CY 5,702.390 $12.000 $14.200 $17.500 $23.000 $27.000 $34.180
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 3,829.140 $18.000 $14.200 $10.000 $16.000 $30.000 $36.700
161 6017 COMPOST MANUF TOPSOIL (4") SY 7,134.000 $2.000 $1.560 $2.300 $2.000 $3.000 $5.080
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 8,343.000 $0.180 $0.230 $0.240 $0.250 $0.230 $1.250
166 6001 FERTILIZER AC 1.720 $500.000 $694.000 $733.000 $800.000 $694.000 $1,858.580
168 6001 VEGETATIVE WATERING MG 130.000 $22.000 $24.500 $47.900 $60.000 $30.000 $404.980
216 6001 PROOF ROLLING HR 14.000 $105.000 $108.000 $82.600 $100.000 $135.000 $131.560
247 6475 FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS CY 5,692.000 $75.000 $54.480 $75.000 $75.000 $77.600 $59.440
310 6027 PRIME COAT(MC-30 OR AE-P) GAL 3,416.000 $3.750 $5.600 $4.350 $6.000 $5.250 $5.320
432 6001 RIPRAP (CONC)(4 IN) CY 4.000 $500.000 $864.000 $944.000 $1,000.000 $800.000 $612.340
462 6063 CONC BOX CULV (8 FT X 4 FT)(EXTEND) LF 4.000 $1,500.000 $2,116.800 $1,940.000 $2,500.000 $1,960.000 $90.000
464 6018 RC PIPE (CL IV)(24 IN) LF 131.000 $130.000 $135.000 $100.000 $150.000 $125.000 $146.880
464 6080 RC PIPE (ARCH)(CL V)(DES 3) LF 370.000 $150.000 $373.680 $250.000 $175.000 $346.000 $450.000
467 6270 SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C) EA 2.000 $10,000.000 $20,887.210 $21,700.000 $20,000.000 $19,340.000 $30,500.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 6.000 $2,500.000 $2,268.000 $2,000.000 $3,250.000 $2,100.000 $2,079.030
467 6545 SET (TY II) (DES 3) (RCP) (6: 1) (P) EA 12.000 $2,500.000 $4,945.320 $4,500.000 $4,800.000 $4,579.000 $3,200.000
480 6001 CLEAN EXIST CULVERTS EA 2.000 $4,000.000 $2,700.000 $5,000.000 $2,500.000 $2,500.000 $2,269.500
496 6004 REMOV STR (SET) EA 6.000 $400.000 $1,350.000 $700.000 $2,000.000 $1,250.000 $849.450
496 6007 REMOV STR (PIPE) LF 45.000 $25.000 $31.320 $20.000 $40.000 $29.000 $118.060
500 6001 MOBILIZATION LS 1.000 $221,135.000 $208,904.410 $209,000.000 $225,000.000 $200,130.000 $285,931.480
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 11.000 $5,000.000 $4,886.810 $3,800.000 $3,500.000 $4,500.000 $9,180.240
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 222.000 $20.000 $15.100 $15.900 $15.000 $15.100 $31.080
506 6024 CONSTRUCTION EXITS (REMOVE) SY 222.000 $7.000 $6.600 $7.000 $7.000 $6.600 $10.180
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,971.000 $3.000 $3.500 $3.700 $5.000 $3.500 $4.790
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,971.000 $0.600 $0.500 $0.530 $2.000 $0.500 $1.460
530 6005 DRIVEWAYS (ACP) SY 1,376.000 $40.000 $46.000 $56.600 $75.000 $48.500 $73.100
560 6003 MAILBOX INSTALL-M (TWG-POST) TY 1 EA 6.000 $400.000 $450.000 $653.000 $725.000 $450.000 $314.570
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 10.000 $560.000 $750.000 $699.000 $775.000 $750.000 $790.760
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 7.000 $670.000 $900.000 $878.000 $975.000 $900.000 $930.440
644 6036 IN SM RD SN SUP&AM TYS80(1)SA(U-BM) EA 1.000 $700.000 $950.000 $1,150.000 $1,275.000 $950.000 $1,275.740
644 6076 REMOVE SM RD SN SUP&AM EA 14.000 $125.000 $100.000 $122.000 $150.000 $100.000 $283.440
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 4.000 $100.000 $20.000 $16.800 $25.000 $20.000 $37.200
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 4.000 $200.000 $60.000 $80.800 $100.000 $60.000 $81.130
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 578.125 $6.000 $2.750 $3.000 $6.000 $2.750 $3.850
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 23,139.000 $1.000 $0.800 $0.880 $1.000 $0.800 $0.980
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 23,141.000 $1.000 $0.800 $0.880 $1.000 $0.800 $0.780
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 1,781.000 $0.200 $1.250 $1.350 $1.250 $1.250 $0.630
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 146.000 $2.500 $10.700 $11.800 $12.000 $10.700 $6.070
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 22.000 $110.000 $195.000 $214.000 $225.000 $195.000 $103.680
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 8.000 $110.000 $220.000 $242.000 $250.000 $220.000 $112.800
666 6156 REFL PAV MRK TY I(Y)(MED NOSE)(100MIL) EA 4.000 $600.000 $375.000 $412.000 $500.000 $375.000 $190.000
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 3,080.000 $0.200 $0.500 $0.550 $1.250 $0.500 $0.920
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 18,054.000 $0.200 $0.750 $0.820 $1.250 $0.750 $1.110
666 6343 REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) LF 14,942.000 $0.200 $1.070 $1.200 $1.500 $1.070 $1.490
672 6007 REFL PAV MRKR TY I-C EA 94.000 $6.000 $4.350 $4.800 $6.000 $4.350 $6.180
672 6009 REFL PAV MRKR TY II-A-A EA 809.000 $4.500 $3.000 $3.300 $6.000 $3.000 $8.560
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 29,625.000 $1.000 $0.500 $0.550 $0.500 $0.500 $0.990
3076 6001 D-GR HMA TY-B PG64-22 TON 3,928.000 $95.000 $91.300 $97.700 $100.000 $97.000 $135.710
3076 6066 TACK COAT GAL 2,563.000 $3.750 $4.640 $3.700 $4.000 $3.900 $6.390
3077 6023 SP MIXES SP-C SAC-B PG70-22 TON 4,329.000 $120.000 $101.200 $108.000 $115.000 $107.000 $150.040
3085 6001 UNDERSEAL COURSE GAL 7,529.000 $4.000 $5.360 $5.300 $6.000 $4.150 $4.230
Totals: $2,435,888.44 $2,221,434.37 $2,353,335.49 $2,482,036.96 $2,590,543.08 $3,182,579.85