County: GRIMES Highway: FM 1696 Date: 01/04/2017 (7 years ago) Engineer's Estimate: $6,429,069 Control Number: 1562-03-018
Project: STP 2017(349) District: BRYAN Time: 215 WORKING DAYS Type: REHABILITATE EXISTING ROAD

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $6,429,068.83
GLENN FUQUA, INC.   $5,527,215.43 1
-14.03% | -$901,853.40
KNIFE RIVER CORPORATION - SOUTH   $5,726,661.75 2
-10.93% | -$702,407.08
3.61% | $199,446.32
ANGEL BROTHERS HOLDINGS CORP.   $5,865,306.65 3
-8.77% | -$563,762.18
6.12% | $338,091.22
2.42% | $138,644.90
BIG CREEK CONSTRUCTION, LTD.   $6,015,945.87 4
-6.43% | -$413,122.96
8.84% | $488,730.44
2.57% | $150,639.22
A. L. HELMCAMP, INC.   $6,128,544.13 5
-4.67% | -$300,524.70
10.88% | $601,328.70
1.87% | $112,598.26
SMITH & COMPANY   $7,821,001.15 6
21.65% | $1,391,932.32
41.5% | $2,293,785.72
27.62% | $1,692,457.02

Bid Items

Items: 87, 0 filtered
GRIMES FM 1696  |  BRYAN  |  1562-03-018  |  01/04/2017  |  $6,429,069  |  STP 2017(349)  |  REHAB EXIST ROAD  |  215 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate GLENN FUQUA, INC. KNIFE RIVER CORPORATION - SOUTH ANGEL BROTHERS HOLDINGS CORP. BIG CREEK CONSTRUCTION, LTD. A. L. HELMCAMP, INC. SMITH & COMPANY
100 6002 PREPARING ROW STA 481.020 $300.000 $350.000 $232.000 $300.000 $500.000 $450.000 $475.000
100 6003 PREPARING ROW(TREE)(5" TO 12" DIA) EA 4.000 $300.000 $650.000 $695.000 $650.000 $500.000 $800.000 $415.000
100 6008 PREPARING ROW (TREE) (0" TO 6" DIA) EA 7.000 $275.000 $400.000 $430.000 $400.000 $300.000 $500.000 $415.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 41.000 $14.000 $25.000 $40.700 $15.000 $50.000 $22.000 $100.000
105 6015 REMOVING STAB BASE & ASPH PAV (8"-10") SY 9,514.000 $5.000 $3.000 $2.950 $4.000 $3.000 $5.000 $10.250
105 6030 REMOVING STAB BASE & ASPH PAV (8"-14") SY 118,757.000 $6.000 $1.500 $3.190 $4.700 $3.000 $3.290 $11.750
110 6001 EXCAVATION (ROADWAY) CY 6,308.000 $10.000 $5.000 $4.350 $7.000 $15.000 $7.000 $8.750
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 9,384.000 $20.000 $6.500 $4.950 $5.000 $15.000 $7.000 $13.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 64,122.000 $0.600 $0.500 $0.320 $0.400 $0.500 $0.500 $3.000
162 6002 BLOCK SODDING SY 193.000 $3.000 $5.000 $5.320 $5.000 $10.000 $6.000 $6.000
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 64,122.000 $0.120 $0.080 $0.090 $0.080 $0.090 $0.100 $0.100
164 6009 BROADCAST SEED (TEMP) (WARM) SY 32,061.000 $0.100 $0.080 $0.090 $0.080 $0.090 $0.100 $0.100
164 6011 BROADCAST SEED (TEMP) (COOL) SY 32,061.000 $0.100 $0.080 $0.090 $0.080 $0.090 $0.100 $0.100
168 6001 VEGETATIVE WATERING MG 1,924.000 $15.000 $10.000 $15.000 $15.000 $5.000 $10.000 $12.000
247 6312 FL BS (CMP IN PLC)(TY D GR1-2)(8") SY 116,380.000 $12.000 $11.500 $14.700 $12.000 $12.000 $13.800 $15.000
247 6313 FL BS (CMP IN PLC)(TY D GR1-2)(12") SY 32,067.000 $18.000 $18.700 $21.050 $18.000 $20.000 $21.000 $22.000
260 6011 LIME TRT (EXST MATL) (12") SY 34,204.000 $3.000 $2.700 $3.280 $2.300 $2.500 $3.700 $4.250
260 6012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 770.000 $155.000 $147.000 $151.050 $160.000 $150.000 $150.000 $145.000
275 6001 CEMENT TON 1,862.000 $140.000 $136.000 $145.550 $140.000 $140.000 $140.000 $135.000
275 6011 CEMENT TREAT(EXIST MATL)(8") SY 124,139.000 $1.500 $1.250 $1.100 $1.400 $1.300 $2.670 $2.250
276 6228 CEM TRT(PLNT MX) (CL N)(TYA)(GR1-2)(8") SY 12,686.000 $35.000 $23.000 $22.200 $20.000 $25.000 $23.000 $29.000
316 6029 ASPH (RC-250) GAL 40,283.000 $4.000 $3.770 $3.500 $3.200 $3.000 $3.000 $3.050
316 6403 AGGR (TY-B GR-5 OR TY-L GR-5) CY 1,194.000 $100.000 $90.000 $104.550 $128.000 $77.000 $120.000 $88.000
316 6404 AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A) CY 2,376.000 $130.000 $110.000 $115.700 $140.000 $120.000 $100.000 $108.000
316 6406 ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR) GAL 112,818.000 $3.000 $3.000 $2.350 $2.400 $2.500 $2.700 $2.650
344 6103 SUPERPAVE MIXTURES SP-D SAC-A PG64-22 TON 1,352.000 $100.000 $125.000 $74.100 $93.000 $80.000 $100.000 $99.000
400 6006 CUT & RESTORING PAV SY 15.000 $100.000 $300.000 $436.000 $50.000 $300.000 $330.000 $305.000
432 6001 RIPRAP (CONC)(4 IN) CY 8.660 $500.000 $550.000 $642.000 $800.000 $1,000.000 $600.000 $565.000
432 6024 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 2.500 $200.000 $300.000 $299.400 $350.000 $500.000 $330.000 $305.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 110.000 $450.000 $650.000 $366.400 $450.000 $500.000 $660.000 $625.000
460 6002 CMP (GAL STL 18 IN) LF 101.000 $60.000 $56.000 $74.300 $63.000 $40.000 $60.000 $60.000
464 6005 RC PIPE (CL III)(24 IN) LF 10.000 $70.000 $100.000 $195.100 $440.000 $150.000 $110.000 $105.000
464 6008 RC PIPE (CL III)(36 IN) LF 54.000 $120.000 $250.000 $146.800 $200.000 $200.000 $270.000 $255.000
465 6006 JCTBOX(COMPL)(PJB)(4FTX4FT) EA 1.000 $4,000.000 $4,500.000 $5,103.510 $3,400.000 $4,000.000 $5,000.000 $4,600.000
466 6134 HEADWALL (CH - PW - S) (DIA= 36 IN) EA 1.000 $7,500.000 $9,500.000 $7,553.000 $13,000.000 $15,000.000 $11,000.000 $6,750.000
467 6348 SET (TY II) (18 IN) (CMP) (6: 1) (P) EA 20.000 $990.000 $1,000.000 $1,430.000 $1,300.000 $1,200.000 $1,200.000 $1,025.000
467 6380 SET (TY II) (24 IN) (CMP) (6: 1) (P) EA 6.000 $1,400.000 $1,500.000 $1,600.000 $1,400.000 $1,500.000 $1,600.000 $1,550.000
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 4.000 $900.000 $1,200.000 $1,365.000 $1,400.000 $1,100.000 $1,400.000 $1,225.000
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 15.000 $800.000 $1,200.000 $1,645.000 $1,600.000 $1,300.000 $1,400.000 $1,225.000
467 6439 SET (TY II) (36 IN) (CMP) (3: 1) (C) EA 3.000 $3,000.000 $2,500.000 $2,480.000 $2,000.000 $1,700.000 $2,800.000 $2,550.000
467 6441 SET (TY II) (36 IN) (CMP) (4: 1) (C) EA 3.000 $3,250.000 $2,800.000 $2,530.000 $1,900.000 $2,600.000 $3,100.000 $3,000.000
467 6448 SET (TY II) (36 IN) (RCP) (3: 1) (C) EA 6.000 $2,300.000 $2,800.000 $2,700.000 $2,800.000 $1,700.000 $3,100.000 $3,000.000
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 1.000 $3,200.000 $3,000.000 $3,500.000 $4,000.000 $2,600.000 $3,300.000 $3,100.000
467 6454 SET (TY II) (36 IN) (RCP) (6: 1) (P) EA 1.000 $3,900.000 $3,500.000 $4,780.000 $5,700.000 $3,800.000 $3,900.000 $3,575.000
472 6006 REMOV & RE - LAY PIPE (24 IN) LF 16.000 $60.000 $80.000 $204.000 $150.000 $140.000 $90.000 $85.000
472 6011 REMOV & RE - LAY PIPE (36 IN) LF 6.000 $100.000 $150.000 $204.000 $200.000 $190.000 $160.000 $155.000
496 6007 REMOV STR (PIPE) LF 341.000 $18.000 $35.000 $34.200 $25.000 $15.000 $38.000 $36.000
500 6001 MOBILIZATION LS 1.000 $440,000.000 $550,000.000 $287,055.000 $400,000.000 $600,000.010 $350,000.000 $475,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 14.000 $5,000.000 $1,650.000 $1,425.000 $6,800.000 $3,000.000 $4,000.000 $1,750.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 460.000 $26.000 $21.000 $22.340 $21.000 $25.000 $25.000 $22.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 460.000 $8.000 $8.000 $8.510 $8.000 $3.000 $6.000 $9.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 500.000 $2.700 $2.250 $6.740 $3.500 $5.000 $6.000 $2.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 500.000 $0.640 $1.000 $1.060 $1.000 $0.500 $1.000 $1.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 867.000 $4.000 $6.000 $5.320 $6.000 $7.000 $7.000 $7.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 867.000 $1.000 $1.000 $1.060 $1.000 $1.000 $1.000 $1.000
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 8.000 $5,000.000 $7,000.000 $5,680.000 $6,000.000 $5,000.000 $2,400.000 $5,000.000
530 6005 DRIVEWAYS (ACP) SY 168.000 $35.000 $120.000 $37.650 $48.000 $30.000 $33.000 $50.000
530 6006 DRIVEWAYS (SURF TREAT) SY 2,919.000 $30.000 $11.500 $15.370 $35.000 $25.000 $19.000 $36.000
530 6009 TURNOUTS (SURF TREAT) SY 524.000 $30.000 $13.500 $15.920 $35.000 $20.000 $23.000 $36.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,050.000 $19.000 $23.100 $26.910 $24.000 $25.000 $18.000 $26.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,200.000 $1,400.000 $3,297.780 $1,800.000 $1,700.000 $1,700.000 $357.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 700.000 $2.700 $4.000 $5.320 $4.000 $2.000 $2.000 $5.250
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 $160.000 $120.000 $372.330 $120.000 $150.000 $150.000 $357.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 12.000 $2,250.000 $2,100.000 $2,319.080 $2,100.000 $2,200.000 $2,300.000 $2,225.000
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 34.000 $160.000 $102.000 $207.440 $105.000 $150.000 $115.000 $200.000
560 6008 MAILBOX INSTALL-D (WC-POST) TY 3 EA 6.000 $206.000 $133.000 $271.270 $135.000 $200.000 $150.000 $265.000
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 5.000 $500.000 $595.000 $606.370 $600.000 $600.000 $600.000 $585.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 98.000 $320.000 $277.000 $313.820 $280.000 $300.000 $300.000 $333.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 $400.000 $390.000 $494.670 $400.000 $400.000 $430.000 $475.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 2.000 $450.000 $555.000 $590.410 $560.000 $600.000 $610.000 $567.000
644 6037 IN SM RD SN SUP&AM TYS80(1)SA(U-WC) EA 3.000 $800.000 $612.000 $813.810 $620.000 $700.000 $670.000 $789.000
644 6076 REMOVE SM RD SN SUP&AM EA 63.000 $80.000 $50.000 $53.190 $50.000 $50.000 $85.000 $55.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 24.000 $22.000 $14.500 $21.280 $15.000 $20.000 $20.000 $21.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 44.000 $40.000 $37.000 $44.680 $37.000 $40.000 $40.000 $43.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 95,299.000 $0.150 $0.100 $0.100 $0.090 $0.200 $0.090 $0.150
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 37.000 $2.000 $1.000 $1.060 $1.100 $10.000 $1.100 $2.000
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 10,156.000 $0.150 $0.100 $0.100 $0.090 $0.200 $0.090 $0.160
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 32,002.000 $0.170 $0.100 $0.100 $0.090 $0.200 $0.090 $0.160
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 3,539.000 $1.000 $1.000 $1.020 $1.000 $1.000 $0.800 $2.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 250.000 $6.000 $12.500 $12.770 $12.000 $10.000 $13.000 $5.250
666 6093 REFL PAV MRK TY I (W)(RR XING)(100MIL) EA 2.000 $600.000 $660.000 $702.110 $660.000 $750.000 $700.000 $333.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 95,299.000 $0.300 $0.300 $0.310 $0.300 $0.400 $0.320 $0.410
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 10,156.000 $0.300 $0.300 $0.310 $0.300 $0.400 $0.320 $0.410
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 32,002.000 $0.350 $0.300 $0.310 $0.300 $0.400 $0.320 $0.410
672 6009 REFL PAV MRKR TY II-A-A EA 907.000 $2.500 $2.750 $2.710 $2.600 $4.000 $3.000 $4.000
678 6001 PAV SURF PREP FOR MRK (4") LF 270.000 $0.100 $0.050 $0.010 $0.010 $5.000 $0.020 $1.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $3,500.000 $10,000.000 $9,050.000 $7,500.000 $15,000.000 $5,000.000 $20,000.000
Totals: $6,429,068.83 $5,527,215.43 $5,726,661.75 $5,865,306.65 $6,015,945.87 $6,128,544.13 $7,821,001.15