Show Job Controls
Bid Cobra

GRIMES SH 6 (0050-03-096)

Items: 179

County: GRIMES
Length: N/A
Highway: SH 6
District: BRYAN
Control Number: 0050-03-096
DBE Goal: N/A
Project: STP 2021(770)HES
Guaranty: N/A
Time: 579 WORKING DAYS
Engineer's Estimate: $18,724,906.07
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$18,724,906.07
$18,052,622.00
Over/Under Est: -3.59% -$672,284.07
Over/Under Est: 4.48% $838,579.92
Amt Left: 8.37% $1,510,863.99
Over/Under Est: 6.74% $1,262,376.20
Amt Left: 10.72% $1,934,660.27
Delta: -2.17% -$423,796.28
Over/Under Est: 12.59% $2,358,239.41
Amt Left: 16.79% $3,030,523.48
Delta: -5.48% -$1,095,863.21
Over/Under Est: 17.28% $3,236,546.80
Amt Left: 21.65% $3,908,830.87
Delta: -4.17% -$878,307.39
Over/Under Est: 20.31% $3,802,841.96
Amt Left: 24.79% $4,475,126.03
Delta: -2.58% -$566,295.16
Subcontractor Percentage Amount
TEXAS STERLING CONSTRUCTION CO. 2.98% $577,808.48
ALLSTATE SIGNAL & CONSTRUCTION, LLC 1.37% $265,636.79
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.15% $222,979.78
D. I. J. CONSTRUCTION, INC. 1.01% $195,834.42
JB PINNACLE GROUP, LLC 0.92% $178,383.83
BATTEN DRILLING, INC. 0.86% $166,750.10
DIIBS SPECIALISTS, LLC 0.81% $157,055.33
WATERS CONSTRUCTION COMPANY, INC. 0.78% $151,238.46
TOM-MAC, INC. 0.68% $131,848.92
WILLOW CITY SIGN & RAIL, INC. 0.31% $60,107.59
TORO BRAVO CONSTRUCTION, LLC 0.30% $58,168.64
LONESTAR TRAFFIC SAFETY, LLC 0.28% $54,290.73
PINNACLE GRINDING AND GROOVING LLC 0.15% $29,084.32
TRP CONSTRUCTION GROUP, LLC 0.08% $15,511.64
AIMS COMPANIES 0.07% $13,572.68
PENHALL COMPANY 0.07% $13,572.68
PROFESSIONAL TRAFFIC CONTROL LLC 0.03% $5,816.86
SCOTT DERR PAINTING CO, LLC 0.02% $3,877.91
Total: 11.87% $2,301,539.16

Bid Items & Bid Tabulations

179 Total 0 of 179
GRIMES  |  SH 6  |  BRYAN  |  0050-03-096  |  08/04/2021  |  $18,724,906.07  |  STP 2021(770)HES  |  HAZARD ELIM & SAFETY  |  579 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
HARPER BROTHERS CONSTRUCTION LLC
JAMES CONSTRUCTION GROUP, LLC
PREPARING ROW
STA 59.600 $750.000 $560.000 $6,300.000 $2,500.000 $17,500.000 $5,250.000 $14,800.000
REMOVING CONC (PAV)
SY 11,839.000 $8.000 $6.500 $7.000 $5.000 $7.000 $9.000 $12.330
REMOVING CONC (RIPRAP)
CY 92.000 $120.000 $35.500 $460.000 $100.000 $88.000 $140.000 $197.400
REMOVING CONC (DRIVEWAYS)
SY 168.000 $15.000 $7.000 $13.000 $15.000 $30.500 $14.000 $16.770
REMOVING CONCRETE(MOW STRIP)
LF 1,280.000 $8.000 $4.500 $10.000 $7.000 $10.000 $9.000 $3.890
REMOVING STAB BASE AND ASPH PAV (6")
SY 441.000 $4.000 $5.750 $8.000 $7.000 $9.210 $7.000 $6.060
REMOVING STAB BASE AND ASPH PAV (7")
SY 1,077.000 $4.500 $6.250 $8.000 $8.000 $6.400 $7.000 $5.800
REMOVING STB BASE AND ASPH PAV(10-14")
SY 22,964.000 $8.000 $2.000 $6.000 $5.000 $6.670 $7.000 $5.830
REMOVING STAB BASE & ASPH PAV (0-2")
SY 106.000 $5.000 $21.000 $6.000 $5.000 $10.500 $7.000 $3.920
REMOVING STAB BASE & ASPH PAV (12.5")
SY 26,407.000 $8.000 $4.250 $6.000 $5.000 $6.300 $7.000 $5.990
EXCAVATION (ROADWAY)
CY 285,850.000 $9.000 $6.000 $7.700 $10.000 $10.560 $9.500 $12.470
EXCAVATION (SPECIAL)
CY 3,080.900 $15.000 $9.000 $15.000 $20.000 $26.000 $2.000 $7.050
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 38,348.000 $9.000 $6.000 $4.000 $10.000 $18.140 $2.000 $6.120
FURNISHING AND PLACING TOPSOIL (4")
SY 208,259.000 $0.500 $0.500 $0.700 $1.000 $1.870 $2.500 $0.190
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 208,259.000 $0.100 $0.250 $0.310 $0.280 $0.280 $0.240 $0.250
CELL FBR MLCH SEED(TEMP)(WARM)
SY 104,135.000 $0.450 $0.250 $0.300 $0.170 $0.250 $0.130 $0.130
CELL FBR MLCH SEED(TEMP)(COOL)
SY 104,135.000 $0.450 $0.250 $0.300 $0.170 $0.250 $0.130 $0.130
VEGETATIVE WATERING
MG 4,166.500 $18.000 $11.500 $8.000 $10.000 $15.500 $24.000 $20.420
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 10,279.000 $1.100 $1.250 $0.900 $1.500 $1.080 $0.890 $0.910
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 5,761.000 $2.000 $1.500 $1.500 $1.500 $1.330 $1.240 $1.270
FL BS (CMP IN PLC)(TY A GR 5)(8")
SY 74,394.000 $13.000 $16.500 $16.000 $15.000 $14.080 $23.000 $19.680
CEMENT
TON 629.000 $165.000 $170.000 $159.000 $160.000 $162.000 $200.000 $180.120
CEMENT TREAT(EXIST MATL)(8")
SY 74,356.000 $2.250 $1.250 $1.700 $1.500 $0.740 $2.000 $1.450
CEM TRT(PLNT MX)(CL M)(TY A)(GR 4)(8")
SY 5,404.000 $30.000 $29.000 $27.000 $28.000 $23.270 $20.000 $17.160
ASPH (RC-250)
GAL 19,965.000 $4.000 $3.750 $4.100 $3.700 $3.750 $3.180 $3.780
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 592.000 $100.000 $130.000 $130.000 $120.000 $140.000 $187.580 $222.960
PFC (ASPHALT) PG76-22
TON 432.000 $100.000 $120.000 $130.000 $120.000 $120.000 $148.630 $176.670
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 6,420.000 $125.000 $120.000 $130.000 $120.000 $120.000 $148.630 $176.670
PLANE ASPH CONC PAV (0" TO 1 1/4")
SY 41,808.000 $2.000 $0.750 $1.400 $1.000 $1.250 $1.470 $1.920
CEM STABIL BKFL
CY 706.000 $100.000 $60.500 $60.000 $130.000 $105.250 $65.000 $44.450
SAND BACKFILL
CY 3,080.900 $20.000 $27.000 $77.000 $80.000 $66.500 $10.000 $61.030
FLOWABLE BACKFILL
CY 804.000 $190.000 $170.000 $150.000 $140.000 $130.000 $170.000 $146.410
TRENCH EXCAVATION PROTECTION
LF 3,244.000 $10.000 $0.250 $4.000 $10.000 $20.590 $1.000 $1.180
DRILL SHAFT (18 IN)
LF 622.000 $140.000 $79.000 $64.000 $120.000 $92.000 $100.000 $50.980
DRILL SHAFT (36 IN)
LF 3,087.000 $210.000 $230.000 $220.000 $270.000 $235.000 $300.000 $196.780
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 28.000 $135.000 $70.000 $80.000 $100.000 $66.000 $85.000 $66.870
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 310.000 $180.000 $200.000 $185.000 $250.000 $190.000 $159.820 $180.130
CL C CONC (ABUT)
CY 204.900 $760.000 $680.000 $1,000.000 $900.000 $745.000 $1,225.000 $756.420
CL C CONC (CAP)
CY 152.700 $960.000 $1,000.000 $1,000.000 $900.000 $813.000 $1,650.000 $830.510
CL C CONC (COLUMN)
CY 97.600 $870.000 $1,400.000 $1,000.000 $900.000 $762.000 $1,875.000 $1,036.910
CL C CONC (RAIL FOUNDATION)
CY 36.000 $550.000 $370.000 $640.000 $600.000 $645.000 $800.000 $638.990
REINF CONC SLAB
SF 34,730.000 $18.000 $16.000 $19.000 $17.000 $19.000 $25.000 $15.500
APPROACH SLAB
CY 227.500 $400.000 $490.000 $450.000 $600.000 $494.000 $650.000 $579.840
PRESTR CONC GIRDER (TX34)
LF 4,235.400 $140.000 $160.000 $155.000 $150.000 $169.700 $185.000 $144.760
RIPRAP (CONC)(4 IN)
CY 651.000 $465.000 $370.000 $470.000 $375.000 $474.000 $500.000 $403.820
RIPRAP (CONC)(5 IN)
CY 7.800 $550.000 $370.000 $530.000 $500.000 $526.000 $500.000 $619.300
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 66.000 $120.000 $110.000 $180.000 $150.000 $148.000 $135.000 $169.090
RIPRAP (STONE PROTECTION)(12 IN)
CY 74.300 $120.000 $120.000 $170.000 $170.000 $148.000 $135.000 $165.790
RIPRAP (STONE PROTECTION)(18 IN)
CY 518.000 $155.000 $120.000 $160.000 $150.000 $137.250 $135.000 $150.470
RIPRAP (STONE PROTECTION)(24 IN)
CY 3,569.000 $130.000 $110.000 $130.000 $150.000 $116.000 $135.000 $131.760
RIPRAP (MOW STRIP)(4 IN)
CY 111.000 $425.000 $410.000 $520.000 $450.000 $631.500 $600.000 $399.850
RAIL (TY SSTR)
LF 1,914.800 $85.000 $61.000 $74.000 $70.000 $57.000 $60.000 $39.050
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 296.000 $110.000 $120.000 $135.000 $130.000 $182.000 $190.000 $132.060
CONC BOX CULV (6 FT X 3 FT)
LF 185.000 $400.000 $360.000 $510.000 $400.000 $492.000 $530.000 $388.630
RC PIPE (CL III)(18 IN)
LF 180.000 $80.000 $46.500 $56.000 $60.000 $57.000 $120.000 $55.280
RC PIPE (CL III)(24 IN)
LF 146.000 $65.000 $54.500 $68.000 $80.000 $103.000 $120.000 $69.330
RC PIPE (CL III)(30 IN)
LF 243.000 $105.000 $71.500 $90.000 $90.000 $137.000 $130.000 $88.940
RC PIPE (CL III)(36 IN)
LF 168.000 $150.000 $96.000 $115.000 $120.000 $174.000 $160.000 $131.490
MANH (COMPL)(PRM)(48IN)
EA 1.000 $6,000.000 $5,600.000 $3,900.000 $6,000.000 $3,683.000 $8,515.000 $4,558.100
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $5,000.000 $3,800.000 $4,800.000 $6,500.000 $4,736.000 $6,750.000 $5,539.910
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $7,000.000 $4,000.000 $5,200.000 $7,500.000 $5,262.000 $7,000.000 $6,039.640
INLET(COMPL)(PAZD)(FG)(5FTX5FT-3FTX3FT)
EA 1.000 $7,500.000 $5,600.000 $6,200.000 $8,500.000 $6,841.000 $8,900.000 $7,103.760
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 1.000 $10,000.000 $4,500.000 $20,000.000 $8,700.000 $6,315.000 $16,200.000 $11,600.520
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $11,500.000 $5,400.000 $27,000.000 $12,000.000 $7,367.000 $16,675.000 $12,014.030
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 10.000 $1,300.000 $940.000 $1,700.000 $1,000.000 $947.000 $1,785.000 $1,117.270
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,500.000 $960.000 $2,300.000 $1,200.000 $1,000.000 $2,050.000 $1,276.770
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $1,750.000 $1,300.000 $2,400.000 $1,400.000 $1,050.000 $2,325.000 $1,364.970
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $2,000.000 $1,600.000 $2,900.000 $1,600.000 $2,600.000 $2,750.000 $1,488.420
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $2,250.000 $1,900.000 $3,700.000 $2,000.000 $3,150.000 $3,225.000 $1,635.410
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $2,500.000 $2,800.000 $4,300.000 $2,200.000 $3,600.000 $4,300.000 $1,617.770
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $3,000.000 $2,400.000 $4,500.000 $2,400.000 $4,200.000 $4,800.000 $2,964.080
REMOV STR (INLET)
EA 3.000 $900.000 $500.000 $600.000 $850.000 $790.000 $1,075.000 $308.170
REMOV STR (SET)
EA 4.000 $400.000 $280.000 $400.000 $450.000 $790.000 $1,000.000 $231.130
REMOV STR (WINGWALL)
EA 2.000 $1,800.000 $1,200.000 $800.000 $1,250.000 $1,263.000 $1,500.000 $462.260
REMOV STR (HEADWALL)
EA 6.000 $1,300.000 $1,200.000 $800.000 $850.000 $1,263.000 $1,800.000 $434.830
REMOV STR (PIPE)
LF 391.000 $14.000 $15.500 $19.000 $12.000 $26.000 $40.000 $9.040
REMOV STR (BOX CULVERT)
LF 221.000 $70.000 $53.500 $80.000 $70.000 $263.000 $70.000 $39.740
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $70,000.000 $35,000.000 $60,000.000 $30,000.000 $70,000.000 $250,000.000 $56,250.000
MOBILIZATION
LS 1.000 $1,700,082.370 $1,975,000.000 $1,600,000.000 $1,900,000.000 $1,322,900.000 $375,000.000 $2,104,753.380
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 37.000 $6,000.000 $3,900.000 $5,000.000 $3,000.000 $4,000.000 $9,000.000 $4,222.280
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,635.000 $35.000 $29.500 $27.000 $25.000 $27.670 $29.380 $26.290
ROCK FILTER DAMS (REMOVE)
LF 1,635.000 $10.000 $8.750 $7.000 $5.000 $8.200 $6.090 $7.790
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 858.000 $23.000 $26.500 $25.000 $15.000 $25.250 $36.850 $23.990
CONSTRUCTION EXITS (REMOVE)
SY 858.000 $8.000 $6.000 $5.000 $5.000 $5.620 $8.700 $5.340
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,582.000 $2.700 $2.000 $3.500 $3.000 $1.920 $2.750 $1.820
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,582.000 $0.900 $0.500 $0.250 $0.500 $0.400 $0.470 $0.380
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 418.000 $4.200 $5.250 $4.500 $5.000 $5.000 $8.000 $4.730
BIODEG EROSN CONT LOGS (REMOVE)
LF 418.000 $1.200 $0.500 $1.000 $1.000 $0.400 $3.000 $0.380
CONSTRUCTING DETOURS
SY 20,521.000 $60.500 $69.000 $85.000 $85.000 $62.760 $85.000 $60.380
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 7,770.000 $33.000 $34.000 $30.000 $40.000 $61.000 $60.000 $46.320
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 16,470.000 $11.500 $8.000 $8.000 $8.000 $10.830 $10.000 $8.430
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 7,770.000 $10.000 $11.000 $9.000 $6.000 $9.640 $10.000 $7.860
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 896.000 $80.000 $88.000 $70.000 $70.000 $84.000 $78.000 $43.700
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 127.000 $150.000 $320.000 $210.000 $170.000 $282.000 $280.000 $43.690
PERM CTB (SSCB)(TY 1)(MOD)
LF 1,003.000 $200.000 $360.000 $240.000 $150.000 $190.000 $320.000 $61.870
DRIVEWAYS (CONC)
SY 235.000 $90.000 $62.000 $106.000 $70.000 $126.000 $100.000 $84.430
DRIVEWAYS (ACP)
SY 1,024.000 $55.000 $29.000 $46.000 $30.000 $47.700 $60.000 $71.820
RUMBLE STRIPS (SHOULDER)
LF 24,172.000 $0.400 $0.250 $0.400 $0.350 $0.350 $0.400 $0.190
MTL W-BEAM GD FEN (TIM POST)
LF 1,175.000 $21.000 $24.000 $28.000 $28.000 $24.520 $24.000 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $1,800.000 $1,800.000 $2,200.000 $2,300.000 $1,736.000 $1,950.000 $1,950.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $1,300.000 $1,400.000 $1,500.000 $1,179.000 $1,260.000 $1,260.000
REMOVE METAL BEAM GUARD FENCE
LF 900.000 $3.500 $2.250 $3.000 $3.000 $1.050 $2.000 $2.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 18.000 $250.000 $170.000 $210.000 $200.000 $184.000 $150.000 $160.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $250.000 $220.000 $210.000 $250.000 $210.000 $200.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,000.000 $2,900.000 $2,900.000 $3,000.000 $2,790.000 $2,800.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $275.000 $220.000 $260.000 $200.000 $290.000 $150.000 $150.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 9.000 $2,250.000 $190.000 $1,400.000 $3,200.000 $1,474.000 $2,850.000 $2,850.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $1,000.000 $190.000 $600.000 $750.000 $631.000 $700.000 $700.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $22,000.000 $22,000.000 $25,000.000 $25,000.000 $25,575.000 $23,500.000 $23,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 5.000 $9,500.000 $10,000.000 $9,000.000 $10,000.000 $9,440.000 $9,850.000 $9,850.000
PIPE UNDERDRAINS (TY 6) (6")
LF 776.000 $10.000 $26.500 $36.000 $37.000 $32.460 $50.000 $19.920
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 3.000 $200.000 $260.000 $270.000 $300.000 $210.000 $265.000 $265.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 31.000 $3,500.000 $3,300.000 $3,000.000 $3,500.000 $3,102.000 $3,110.020 $2,948.000
CONDT (PVC) (SCH 40) (2")
LF 3,315.000 $7.500 $8.500 $7.600 $10.000 $7.940 $8.900 $7.540
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,505.000 $15.000 $13.000 $12.000 $15.000 $12.100 $11.890 $11.500
CONDT (RM) (2")
LF 620.000 $22.000 $29.000 $26.000 $35.000 $27.300 $27.730 $25.940
ELEC CONDR (NO.8) BARE
LF 5,120.000 $1.350 $1.250 $1.220 $1.500 $1.280 $1.290 $1.220
ELEC CONDR (NO.8) INSULATED
LF 10,200.000 $1.300 $1.500 $1.450 $1.600 $1.520 $1.530 $1.440
GROUND BOX TY A (122311)W/APRON
EA 24.000 $800.000 $810.000 $730.000 $750.000 $768.000 $650.700 $730.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 3.000 $6,500.000 $7,000.000 $6,400.000 $6,500.000 $6,662.000 $5,856.570 $6,330.000
ALUMINUM SIGNS (TY G)
SF 162.000 $35.000 $34.500 $27.000 $35.000 $32.630 $34.500 $34.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 33.000 $435.000 $560.000 $450.000 $500.000 $505.000 $440.000 $440.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 15.000 $465.000 $670.000 $570.000 $600.000 $654.000 $560.000 $560.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 4.000 $650.000 $950.000 $820.000 $900.000 $879.000 $810.000 $810.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $680.000 $920.000 $770.000 $800.000 $1,020.000 $765.000 $765.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 4.000 $950.000 $1,100.000 $1,050.000 $1,200.000 $1,163.000 $1,015.000 $1,015.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $1,400.000 $1,300.000 $1,800.000 $2,000.000 $2,115.000 $1,795.000 $1,790.000
REMOVE SM RD SN SUP&AM
EA 45.000 $75.000 $22.500 $100.000 $125.000 $63.000 $100.000 $100.000
IN SRSS & AM (RAIL)(130 MPH)(P-BM MNT)
EA 2.000 $1,500.000 $3,300.000 $3,000.000 $5,000.000 $3,158.000 $4,750.000 $4,750.000
INSTALL LRSS (STRUCT STEEL)
LB 1,230.000 $5.000 $5.500 $5.000 $5.000 $5.100 $4.250 $4.250
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 8.000 $35.000 $20.000 $24.000 $25.000 $21.000 $23.000 $23.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $35.000 $22.500 $24.000 $25.000 $21.000 $23.500 $23.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 8.000 $35.000 $20.000 $24.000 $25.000 $21.000 $23.000 $23.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 20.000 $35.000 $22.500 $24.000 $25.000 $21.000 $23.500 $23.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 11.000 $25.000 $25.500 $33.000 $40.000 $35.800 $32.000 $32.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 18.000 $35.000 $25.500 $33.000 $40.000 $37.000 $32.000 $32.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 10.000 $30.000 $18.000 $56.000 $60.000 $74.000 $55.000 $55.000
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 83.000 $3.000 $4.250 $5.000 $6.000 $5.260 $3.750 $5.460
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 1,442.000 $4.000 $4.250 $5.000 $6.000 $5.260 $3.750 $5.460
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 135.000 $3.000 $4.250 $5.000 $6.000 $5.260 $3.750 $5.460
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 286.000 $2.500 $2.250 $4.000 $5.000 $4.210 $3.750 $4.370
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 245.000 $4.000 $2.250 $4.000 $5.000 $4.210 $3.750 $4.370
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 13,450.000 $0.750 $1.250 $0.900 $1.000 $0.950 $0.800 $0.980
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 311.000 $0.900 $0.750 $1.500 $2.000 $1.580 $1.830 $1.640
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 93,171.000 $0.600 $0.750 $0.500 $0.600 $0.530 $0.800 $0.550
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 81,970.000 $0.600 $0.750 $0.500 $0.600 $0.530 $0.800 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,395.000 $0.700 $1.000 $1.000 $1.000 $1.000 $1.280 $0.660
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 240.000 $0.900 $1.000 $1.000 $1.000 $1.000 $1.280 $0.090
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 777.000 $0.700 $0.750 $0.550 $0.800 $0.580 $2.500 $0.600
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 112.000 $1.000 $1.000 $1.300 $2.000 $1.320 $2.700 $1.360
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,636.000 $0.900 $1.000 $0.850 $1.000 $0.890 $0.950 $0.930
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,931.000 $3.150 $3.250 $4.600 $5.000 $4.790 $3.600 $4.970
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 72.000 $7.000 $7.250 $9.000 $10.000 $9.420 $7.400 $9.770
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 12.000 $160.000 $170.000 $130.000 $150.000 $132.000 $130.000 $136.460
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 4.000 $360.000 $260.000 $470.000 $500.000 $495.000 $160.000 $513.100
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 12.000 $170.000 $190.000 $140.000 $150.000 $147.000 $133.000 $152.840
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 40.000 $35.000 $39.000 $35.000 $40.000 $37.000 $30.000 $38.210
PAVEMENT SEALER 4"
LF 2,283.000 $0.200 $0.100 $0.390 $0.450 $0.400 $0.150 $0.410
PAVEMENT SEALER 24"
LF 24.000 $3.000 $1.000 $4.500 $5.000 $5.000 $3.000 $4.800
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 4,750.000 $0.400 $0.500 $0.400 $0.420 $0.410 $0.390 $0.430
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 25,443.000 $0.400 $0.500 $0.400 $0.420 $0.410 $0.390 $0.430
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 25,447.000 $0.350 $0.500 $0.400 $0.420 $0.410 $0.390 $0.430
REFL PAV MRKR TY II-A-A
EA 44.000 $5.000 $5.500 $3.700 $4.000 $4.000 $4.000 $3.930
REFL PAV MRKR TY II-C-R
EA 588.000 $3.500 $5.500 $3.700 $4.000 $4.000 $4.000 $3.930
ELIM EXT PAV MRK & MRKS (4")
LF 41,713.000 $0.400 $0.500 $0.410 $0.600 $0.420 $0.440 $0.440
ELIM EXT PAV MRK & MRKS (8")
LF 4,453.000 $0.600 $0.750 $0.950 $1.000 $0.950 $0.770 $0.980
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 240.000 $5.000 $1.750 $4.600 $4.000 $3.680 $2.690 $3.820
REMOVING TRAFFIC SIGNALS
EA 1.000 $3,000.000 $2,800.000 $2,500.000 $3,500.000 $2,600.000 $3,737.920 $2,500.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 4.000 $650.000 $220.000 $200.000 $250.000 $210.500 $374.170 $200.000
SP MIXES SP-B PG64-22
TON 40,385.000 $70.000 $78.000 $79.000 $72.000 $77.340 $89.180 $106.000
SP MIXES SP-C PG64-22
TON 887.000 $125.000 $96.000 $100.000 $83.000 $92.870 $102.500 $121.840
SP MIXES SP-C SAC-A PG64-22
TON 987.000 $100.000 $94.500 $103.000 $97.000 $101.000 $108.650 $129.150
TACK COAT
GAL 13,860.000 $2.750 $2.250 $2.600 $3.000 $3.260 $2.050 $2.440
BONDING COURSE
GAL 16,676.000 $3.000 $2.250 $2.600 $3.000 $3.370 $2.050 $2.440
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 6.000 $500.000 $280.000 $130.000 $300.000 $215.000 $250.000 $191.780
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,500.000 $11,000.000 $12,500.000 $10,000.000 $1,050.000 $10,000.000 $17,637.340
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 240.000 $25.000 $19.500 $13.000 $15.000 $13.680 $9.000 $14.190
TMA (STATIONARY)
DAY 191.000 $150.000 $170.000 $150.000 $150.000 $350.000 $275.000 $233.690
TMA (MOBILE OPERATION)
DAY 44.000 $150.000 $170.000 $250.000 $250.000 $800.000 $475.000 $811.450
Totals: $18,724,906.070 $18,052,622.000 $19,563,485.990 $19,987,282.270 $21,083,145.480 $21,961,452.870 $22,527,748.074