PREPARING ROW
|
STA
|
59.600
|
$750.000
|
$560.000
|
$6,300.000
|
$2,500.000
|
$17,500.000
|
$5,250.000
|
$14,800.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
11,839.000
|
$8.000
|
$6.500
|
$7.000
|
$5.000
|
$7.000
|
$9.000
|
$12.330
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
92.000
|
$120.000
|
$35.500
|
$460.000
|
$100.000
|
$88.000
|
$140.000
|
$197.400
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
168.000
|
$15.000
|
$7.000
|
$13.000
|
$15.000
|
$30.500
|
$14.000
|
$16.770
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,280.000
|
$8.000
|
$4.500
|
$10.000
|
$7.000
|
$10.000
|
$9.000
|
$3.890
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
441.000
|
$4.000
|
$5.750
|
$8.000
|
$7.000
|
$9.210
|
$7.000
|
$6.060
|
|
|
REMOVING STAB BASE AND ASPH PAV (7")
|
SY
|
1,077.000
|
$4.500
|
$6.250
|
$8.000
|
$8.000
|
$6.400
|
$7.000
|
$5.800
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
22,964.000
|
$8.000
|
$2.000
|
$6.000
|
$5.000
|
$6.670
|
$7.000
|
$5.830
|
|
|
REMOVING STAB BASE & ASPH PAV (0-2")
|
SY
|
106.000
|
$5.000
|
$21.000
|
$6.000
|
$5.000
|
$10.500
|
$7.000
|
$3.920
|
|
|
REMOVING STAB BASE & ASPH PAV (12.5")
|
SY
|
26,407.000
|
$8.000
|
$4.250
|
$6.000
|
$5.000
|
$6.300
|
$7.000
|
$5.990
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
285,850.000
|
$9.000
|
$6.000
|
$7.700
|
$10.000
|
$10.560
|
$9.500
|
$12.470
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
3,080.900
|
$15.000
|
$9.000
|
$15.000
|
$20.000
|
$26.000
|
$2.000
|
$7.050
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
38,348.000
|
$9.000
|
$6.000
|
$4.000
|
$10.000
|
$18.140
|
$2.000
|
$6.120
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
208,259.000
|
$0.500
|
$0.500
|
$0.700
|
$1.000
|
$1.870
|
$2.500
|
$0.190
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
208,259.000
|
$0.100
|
$0.250
|
$0.310
|
$0.280
|
$0.280
|
$0.240
|
$0.250
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
104,135.000
|
$0.450
|
$0.250
|
$0.300
|
$0.170
|
$0.250
|
$0.130
|
$0.130
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
104,135.000
|
$0.450
|
$0.250
|
$0.300
|
$0.170
|
$0.250
|
$0.130
|
$0.130
|
|
|
VEGETATIVE WATERING
|
MG
|
4,166.500
|
$18.000
|
$11.500
|
$8.000
|
$10.000
|
$15.500
|
$24.000
|
$20.420
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
10,279.000
|
$1.100
|
$1.250
|
$0.900
|
$1.500
|
$1.080
|
$0.890
|
$0.910
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
5,761.000
|
$2.000
|
$1.500
|
$1.500
|
$1.500
|
$1.330
|
$1.240
|
$1.270
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(8")
|
SY
|
74,394.000
|
$13.000
|
$16.500
|
$16.000
|
$15.000
|
$14.080
|
$23.000
|
$19.680
|
|
|
CEMENT
|
TON
|
629.000
|
$165.000
|
$170.000
|
$159.000
|
$160.000
|
$162.000
|
$200.000
|
$180.120
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
74,356.000
|
$2.250
|
$1.250
|
$1.700
|
$1.500
|
$0.740
|
$2.000
|
$1.450
|
|
|
CEM TRT(PLNT MX)(CL M)(TY A)(GR 4)(8")
|
SY
|
5,404.000
|
$30.000
|
$29.000
|
$27.000
|
$28.000
|
$23.270
|
$20.000
|
$17.160
|
|
|
ASPH (RC-250)
|
GAL
|
19,965.000
|
$4.000
|
$3.750
|
$4.100
|
$3.700
|
$3.750
|
$3.180
|
$3.780
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
592.000
|
$100.000
|
$130.000
|
$130.000
|
$120.000
|
$140.000
|
$187.580
|
$222.960
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
432.000
|
$100.000
|
$120.000
|
$130.000
|
$120.000
|
$120.000
|
$148.630
|
$176.670
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
6,420.000
|
$125.000
|
$120.000
|
$130.000
|
$120.000
|
$120.000
|
$148.630
|
$176.670
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/4")
|
SY
|
41,808.000
|
$2.000
|
$0.750
|
$1.400
|
$1.000
|
$1.250
|
$1.470
|
$1.920
|
|
|
CEM STABIL BKFL
|
CY
|
706.000
|
$100.000
|
$60.500
|
$60.000
|
$130.000
|
$105.250
|
$65.000
|
$44.450
|
|
|
SAND BACKFILL
|
CY
|
3,080.900
|
$20.000
|
$27.000
|
$77.000
|
$80.000
|
$66.500
|
$10.000
|
$61.030
|
|
|
FLOWABLE BACKFILL
|
CY
|
804.000
|
$190.000
|
$170.000
|
$150.000
|
$140.000
|
$130.000
|
$170.000
|
$146.410
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
3,244.000
|
$10.000
|
$0.250
|
$4.000
|
$10.000
|
$20.590
|
$1.000
|
$1.180
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
622.000
|
$140.000
|
$79.000
|
$64.000
|
$120.000
|
$92.000
|
$100.000
|
$50.980
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,087.000
|
$210.000
|
$230.000
|
$220.000
|
$270.000
|
$235.000
|
$300.000
|
$196.780
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
28.000
|
$135.000
|
$70.000
|
$80.000
|
$100.000
|
$66.000
|
$85.000
|
$66.870
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
310.000
|
$180.000
|
$200.000
|
$185.000
|
$250.000
|
$190.000
|
$159.820
|
$180.130
|
|
|
CL C CONC (ABUT)
|
CY
|
204.900
|
$760.000
|
$680.000
|
$1,000.000
|
$900.000
|
$745.000
|
$1,225.000
|
$756.420
|
|
|
CL C CONC (CAP)
|
CY
|
152.700
|
$960.000
|
$1,000.000
|
$1,000.000
|
$900.000
|
$813.000
|
$1,650.000
|
$830.510
|
|
|
CL C CONC (COLUMN)
|
CY
|
97.600
|
$870.000
|
$1,400.000
|
$1,000.000
|
$900.000
|
$762.000
|
$1,875.000
|
$1,036.910
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
36.000
|
$550.000
|
$370.000
|
$640.000
|
$600.000
|
$645.000
|
$800.000
|
$638.990
|
|
|
REINF CONC SLAB
|
SF
|
34,730.000
|
$18.000
|
$16.000
|
$19.000
|
$17.000
|
$19.000
|
$25.000
|
$15.500
|
|
|
APPROACH SLAB
|
CY
|
227.500
|
$400.000
|
$490.000
|
$450.000
|
$600.000
|
$494.000
|
$650.000
|
$579.840
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
4,235.400
|
$140.000
|
$160.000
|
$155.000
|
$150.000
|
$169.700
|
$185.000
|
$144.760
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
651.000
|
$465.000
|
$370.000
|
$470.000
|
$375.000
|
$474.000
|
$500.000
|
$403.820
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
7.800
|
$550.000
|
$370.000
|
$530.000
|
$500.000
|
$526.000
|
$500.000
|
$619.300
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
66.000
|
$120.000
|
$110.000
|
$180.000
|
$150.000
|
$148.000
|
$135.000
|
$169.090
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
74.300
|
$120.000
|
$120.000
|
$170.000
|
$170.000
|
$148.000
|
$135.000
|
$165.790
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
518.000
|
$155.000
|
$120.000
|
$160.000
|
$150.000
|
$137.250
|
$135.000
|
$150.470
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
3,569.000
|
$130.000
|
$110.000
|
$130.000
|
$150.000
|
$116.000
|
$135.000
|
$131.760
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
111.000
|
$425.000
|
$410.000
|
$520.000
|
$450.000
|
$631.500
|
$600.000
|
$399.850
|
|
|
RAIL (TY SSTR)
|
LF
|
1,914.800
|
$85.000
|
$61.000
|
$74.000
|
$70.000
|
$57.000
|
$60.000
|
$39.050
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
296.000
|
$110.000
|
$120.000
|
$135.000
|
$130.000
|
$182.000
|
$190.000
|
$132.060
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
185.000
|
$400.000
|
$360.000
|
$510.000
|
$400.000
|
$492.000
|
$530.000
|
$388.630
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
180.000
|
$80.000
|
$46.500
|
$56.000
|
$60.000
|
$57.000
|
$120.000
|
$55.280
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
146.000
|
$65.000
|
$54.500
|
$68.000
|
$80.000
|
$103.000
|
$120.000
|
$69.330
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
243.000
|
$105.000
|
$71.500
|
$90.000
|
$90.000
|
$137.000
|
$130.000
|
$88.940
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
168.000
|
$150.000
|
$96.000
|
$115.000
|
$120.000
|
$174.000
|
$160.000
|
$131.490
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$6,000.000
|
$5,600.000
|
$3,900.000
|
$6,000.000
|
$3,683.000
|
$8,515.000
|
$4,558.100
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$5,000.000
|
$3,800.000
|
$4,800.000
|
$6,500.000
|
$4,736.000
|
$6,750.000
|
$5,539.910
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$7,000.000
|
$4,000.000
|
$5,200.000
|
$7,500.000
|
$5,262.000
|
$7,000.000
|
$6,039.640
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-3FTX3FT)
|
EA
|
1.000
|
$7,500.000
|
$5,600.000
|
$6,200.000
|
$8,500.000
|
$6,841.000
|
$8,900.000
|
$7,103.760
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
1.000
|
$10,000.000
|
$4,500.000
|
$20,000.000
|
$8,700.000
|
$6,315.000
|
$16,200.000
|
$11,600.520
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
1.000
|
$11,500.000
|
$5,400.000
|
$27,000.000
|
$12,000.000
|
$7,367.000
|
$16,675.000
|
$12,014.030
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,300.000
|
$940.000
|
$1,700.000
|
$1,000.000
|
$947.000
|
$1,785.000
|
$1,117.270
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$960.000
|
$2,300.000
|
$1,200.000
|
$1,000.000
|
$2,050.000
|
$1,276.770
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,750.000
|
$1,300.000
|
$2,400.000
|
$1,400.000
|
$1,050.000
|
$2,325.000
|
$1,364.970
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$1,600.000
|
$2,900.000
|
$1,600.000
|
$2,600.000
|
$2,750.000
|
$1,488.420
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,250.000
|
$1,900.000
|
$3,700.000
|
$2,000.000
|
$3,150.000
|
$3,225.000
|
$1,635.410
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$2,800.000
|
$4,300.000
|
$2,200.000
|
$3,600.000
|
$4,300.000
|
$1,617.770
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$2,400.000
|
$4,500.000
|
$2,400.000
|
$4,200.000
|
$4,800.000
|
$2,964.080
|
|
|
REMOV STR (INLET)
|
EA
|
3.000
|
$900.000
|
$500.000
|
$600.000
|
$850.000
|
$790.000
|
$1,075.000
|
$308.170
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$400.000
|
$280.000
|
$400.000
|
$450.000
|
$790.000
|
$1,000.000
|
$231.130
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,800.000
|
$1,200.000
|
$800.000
|
$1,250.000
|
$1,263.000
|
$1,500.000
|
$462.260
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,300.000
|
$1,200.000
|
$800.000
|
$850.000
|
$1,263.000
|
$1,800.000
|
$434.830
|
|
|
REMOV STR (PIPE)
|
LF
|
391.000
|
$14.000
|
$15.500
|
$19.000
|
$12.000
|
$26.000
|
$40.000
|
$9.040
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
221.000
|
$70.000
|
$53.500
|
$80.000
|
$70.000
|
$263.000
|
$70.000
|
$39.740
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$70,000.000
|
$35,000.000
|
$60,000.000
|
$30,000.000
|
$70,000.000
|
$250,000.000
|
$56,250.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,700,082.370
|
$1,975,000.000
|
$1,600,000.000
|
$1,900,000.000
|
$1,322,900.000
|
$375,000.000
|
$2,104,753.380
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
37.000
|
$6,000.000
|
$3,900.000
|
$5,000.000
|
$3,000.000
|
$4,000.000
|
$9,000.000
|
$4,222.280
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,635.000
|
$35.000
|
$29.500
|
$27.000
|
$25.000
|
$27.670
|
$29.380
|
$26.290
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,635.000
|
$10.000
|
$8.750
|
$7.000
|
$5.000
|
$8.200
|
$6.090
|
$7.790
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
858.000
|
$23.000
|
$26.500
|
$25.000
|
$15.000
|
$25.250
|
$36.850
|
$23.990
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
858.000
|
$8.000
|
$6.000
|
$5.000
|
$5.000
|
$5.620
|
$8.700
|
$5.340
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,582.000
|
$2.700
|
$2.000
|
$3.500
|
$3.000
|
$1.920
|
$2.750
|
$1.820
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,582.000
|
$0.900
|
$0.500
|
$0.250
|
$0.500
|
$0.400
|
$0.470
|
$0.380
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
418.000
|
$4.200
|
$5.250
|
$4.500
|
$5.000
|
$5.000
|
$8.000
|
$4.730
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
418.000
|
$1.200
|
$0.500
|
$1.000
|
$1.000
|
$0.400
|
$3.000
|
$0.380
|
|
|
CONSTRUCTING DETOURS
|
SY
|
20,521.000
|
$60.500
|
$69.000
|
$85.000
|
$85.000
|
$62.760
|
$85.000
|
$60.380
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
7,770.000
|
$33.000
|
$34.000
|
$30.000
|
$40.000
|
$61.000
|
$60.000
|
$46.320
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
16,470.000
|
$11.500
|
$8.000
|
$8.000
|
$8.000
|
$10.830
|
$10.000
|
$8.430
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
7,770.000
|
$10.000
|
$11.000
|
$9.000
|
$6.000
|
$9.640
|
$10.000
|
$7.860
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
896.000
|
$80.000
|
$88.000
|
$70.000
|
$70.000
|
$84.000
|
$78.000
|
$43.700
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
127.000
|
$150.000
|
$320.000
|
$210.000
|
$170.000
|
$282.000
|
$280.000
|
$43.690
|
|
|
PERM CTB (SSCB)(TY 1)(MOD)
|
LF
|
1,003.000
|
$200.000
|
$360.000
|
$240.000
|
$150.000
|
$190.000
|
$320.000
|
$61.870
|
|
|
DRIVEWAYS (CONC)
|
SY
|
235.000
|
$90.000
|
$62.000
|
$106.000
|
$70.000
|
$126.000
|
$100.000
|
$84.430
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,024.000
|
$55.000
|
$29.000
|
$46.000
|
$30.000
|
$47.700
|
$60.000
|
$71.820
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
24,172.000
|
$0.400
|
$0.250
|
$0.400
|
$0.350
|
$0.350
|
$0.400
|
$0.190
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,175.000
|
$21.000
|
$24.000
|
$28.000
|
$28.000
|
$24.520
|
$24.000
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$1,800.000
|
$1,800.000
|
$2,200.000
|
$2,300.000
|
$1,736.000
|
$1,950.000
|
$1,950.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,500.000
|
$1,300.000
|
$1,400.000
|
$1,500.000
|
$1,179.000
|
$1,260.000
|
$1,260.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
900.000
|
$3.500
|
$2.250
|
$3.000
|
$3.000
|
$1.050
|
$2.000
|
$2.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
18.000
|
$250.000
|
$170.000
|
$210.000
|
$200.000
|
$184.000
|
$150.000
|
$160.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$250.000
|
$220.000
|
$210.000
|
$250.000
|
$210.000
|
$200.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,000.000
|
$2,900.000
|
$2,900.000
|
$3,000.000
|
$2,790.000
|
$2,800.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$275.000
|
$220.000
|
$260.000
|
$200.000
|
$290.000
|
$150.000
|
$150.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
9.000
|
$2,250.000
|
$190.000
|
$1,400.000
|
$3,200.000
|
$1,474.000
|
$2,850.000
|
$2,850.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$1,000.000
|
$190.000
|
$600.000
|
$750.000
|
$631.000
|
$700.000
|
$700.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$22,000.000
|
$22,000.000
|
$25,000.000
|
$25,000.000
|
$25,575.000
|
$23,500.000
|
$23,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
5.000
|
$9,500.000
|
$10,000.000
|
$9,000.000
|
$10,000.000
|
$9,440.000
|
$9,850.000
|
$9,850.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
776.000
|
$10.000
|
$26.500
|
$36.000
|
$37.000
|
$32.460
|
$50.000
|
$19.920
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
3.000
|
$200.000
|
$260.000
|
$270.000
|
$300.000
|
$210.000
|
$265.000
|
$265.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
31.000
|
$3,500.000
|
$3,300.000
|
$3,000.000
|
$3,500.000
|
$3,102.000
|
$3,110.020
|
$2,948.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
3,315.000
|
$7.500
|
$8.500
|
$7.600
|
$10.000
|
$7.940
|
$8.900
|
$7.540
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,505.000
|
$15.000
|
$13.000
|
$12.000
|
$15.000
|
$12.100
|
$11.890
|
$11.500
|
|
|
CONDT (RM) (2")
|
LF
|
620.000
|
$22.000
|
$29.000
|
$26.000
|
$35.000
|
$27.300
|
$27.730
|
$25.940
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
5,120.000
|
$1.350
|
$1.250
|
$1.220
|
$1.500
|
$1.280
|
$1.290
|
$1.220
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
10,200.000
|
$1.300
|
$1.500
|
$1.450
|
$1.600
|
$1.520
|
$1.530
|
$1.440
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
24.000
|
$800.000
|
$810.000
|
$730.000
|
$750.000
|
$768.000
|
$650.700
|
$730.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
3.000
|
$6,500.000
|
$7,000.000
|
$6,400.000
|
$6,500.000
|
$6,662.000
|
$5,856.570
|
$6,330.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
162.000
|
$35.000
|
$34.500
|
$27.000
|
$35.000
|
$32.630
|
$34.500
|
$34.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
33.000
|
$435.000
|
$560.000
|
$450.000
|
$500.000
|
$505.000
|
$440.000
|
$440.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
$465.000
|
$670.000
|
$570.000
|
$600.000
|
$654.000
|
$560.000
|
$560.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
4.000
|
$650.000
|
$950.000
|
$820.000
|
$900.000
|
$879.000
|
$810.000
|
$810.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$680.000
|
$920.000
|
$770.000
|
$800.000
|
$1,020.000
|
$765.000
|
$765.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
4.000
|
$950.000
|
$1,100.000
|
$1,050.000
|
$1,200.000
|
$1,163.000
|
$1,015.000
|
$1,015.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
2.000
|
$1,400.000
|
$1,300.000
|
$1,800.000
|
$2,000.000
|
$2,115.000
|
$1,795.000
|
$1,790.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
45.000
|
$75.000
|
$22.500
|
$100.000
|
$125.000
|
$63.000
|
$100.000
|
$100.000
|
|
|
IN SRSS & AM (RAIL)(130 MPH)(P-BM MNT)
|
EA
|
2.000
|
$1,500.000
|
$3,300.000
|
$3,000.000
|
$5,000.000
|
$3,158.000
|
$4,750.000
|
$4,750.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,230.000
|
$5.000
|
$5.500
|
$5.000
|
$5.000
|
$5.100
|
$4.250
|
$4.250
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
8.000
|
$35.000
|
$20.000
|
$24.000
|
$25.000
|
$21.000
|
$23.000
|
$23.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$35.000
|
$22.500
|
$24.000
|
$25.000
|
$21.000
|
$23.500
|
$23.500
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
8.000
|
$35.000
|
$20.000
|
$24.000
|
$25.000
|
$21.000
|
$23.000
|
$23.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
20.000
|
$35.000
|
$22.500
|
$24.000
|
$25.000
|
$21.000
|
$23.500
|
$23.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
11.000
|
$25.000
|
$25.500
|
$33.000
|
$40.000
|
$35.800
|
$32.000
|
$32.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
18.000
|
$35.000
|
$25.500
|
$33.000
|
$40.000
|
$37.000
|
$32.000
|
$32.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
10.000
|
$30.000
|
$18.000
|
$56.000
|
$60.000
|
$74.000
|
$55.000
|
$55.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
83.000
|
$3.000
|
$4.250
|
$5.000
|
$6.000
|
$5.260
|
$3.750
|
$5.460
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
1,442.000
|
$4.000
|
$4.250
|
$5.000
|
$6.000
|
$5.260
|
$3.750
|
$5.460
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
135.000
|
$3.000
|
$4.250
|
$5.000
|
$6.000
|
$5.260
|
$3.750
|
$5.460
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
286.000
|
$2.500
|
$2.250
|
$4.000
|
$5.000
|
$4.210
|
$3.750
|
$4.370
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
245.000
|
$4.000
|
$2.250
|
$4.000
|
$5.000
|
$4.210
|
$3.750
|
$4.370
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
13,450.000
|
$0.750
|
$1.250
|
$0.900
|
$1.000
|
$0.950
|
$0.800
|
$0.980
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
311.000
|
$0.900
|
$0.750
|
$1.500
|
$2.000
|
$1.580
|
$1.830
|
$1.640
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
93,171.000
|
$0.600
|
$0.750
|
$0.500
|
$0.600
|
$0.530
|
$0.800
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
81,970.000
|
$0.600
|
$0.750
|
$0.500
|
$0.600
|
$0.530
|
$0.800
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,395.000
|
$0.700
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.280
|
$0.660
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
240.000
|
$0.900
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.280
|
$0.090
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
777.000
|
$0.700
|
$0.750
|
$0.550
|
$0.800
|
$0.580
|
$2.500
|
$0.600
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
112.000
|
$1.000
|
$1.000
|
$1.300
|
$2.000
|
$1.320
|
$2.700
|
$1.360
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,636.000
|
$0.900
|
$1.000
|
$0.850
|
$1.000
|
$0.890
|
$0.950
|
$0.930
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,931.000
|
$3.150
|
$3.250
|
$4.600
|
$5.000
|
$4.790
|
$3.600
|
$4.970
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
72.000
|
$7.000
|
$7.250
|
$9.000
|
$10.000
|
$9.420
|
$7.400
|
$9.770
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
12.000
|
$160.000
|
$170.000
|
$130.000
|
$150.000
|
$132.000
|
$130.000
|
$136.460
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
4.000
|
$360.000
|
$260.000
|
$470.000
|
$500.000
|
$495.000
|
$160.000
|
$513.100
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
12.000
|
$170.000
|
$190.000
|
$140.000
|
$150.000
|
$147.000
|
$133.000
|
$152.840
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
40.000
|
$35.000
|
$39.000
|
$35.000
|
$40.000
|
$37.000
|
$30.000
|
$38.210
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,283.000
|
$0.200
|
$0.100
|
$0.390
|
$0.450
|
$0.400
|
$0.150
|
$0.410
|
|
|
PAVEMENT SEALER 24"
|
LF
|
24.000
|
$3.000
|
$1.000
|
$4.500
|
$5.000
|
$5.000
|
$3.000
|
$4.800
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
4,750.000
|
$0.400
|
$0.500
|
$0.400
|
$0.420
|
$0.410
|
$0.390
|
$0.430
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
25,443.000
|
$0.400
|
$0.500
|
$0.400
|
$0.420
|
$0.410
|
$0.390
|
$0.430
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
25,447.000
|
$0.350
|
$0.500
|
$0.400
|
$0.420
|
$0.410
|
$0.390
|
$0.430
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
44.000
|
$5.000
|
$5.500
|
$3.700
|
$4.000
|
$4.000
|
$4.000
|
$3.930
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
588.000
|
$3.500
|
$5.500
|
$3.700
|
$4.000
|
$4.000
|
$4.000
|
$3.930
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
41,713.000
|
$0.400
|
$0.500
|
$0.410
|
$0.600
|
$0.420
|
$0.440
|
$0.440
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
4,453.000
|
$0.600
|
$0.750
|
$0.950
|
$1.000
|
$0.950
|
$0.770
|
$0.980
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
240.000
|
$5.000
|
$1.750
|
$4.600
|
$4.000
|
$3.680
|
$2.690
|
$3.820
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$3,000.000
|
$2,800.000
|
$2,500.000
|
$3,500.000
|
$2,600.000
|
$3,737.920
|
$2,500.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
4.000
|
$650.000
|
$220.000
|
$200.000
|
$250.000
|
$210.500
|
$374.170
|
$200.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
40,385.000
|
$70.000
|
$78.000
|
$79.000
|
$72.000
|
$77.340
|
$89.180
|
$106.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
887.000
|
$125.000
|
$96.000
|
$100.000
|
$83.000
|
$92.870
|
$102.500
|
$121.840
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
987.000
|
$100.000
|
$94.500
|
$103.000
|
$97.000
|
$101.000
|
$108.650
|
$129.150
|
|
|
TACK COAT
|
GAL
|
13,860.000
|
$2.750
|
$2.250
|
$2.600
|
$3.000
|
$3.260
|
$2.050
|
$2.440
|
|
|
BONDING COURSE
|
GAL
|
16,676.000
|
$3.000
|
$2.250
|
$2.600
|
$3.000
|
$3.370
|
$2.050
|
$2.440
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
6.000
|
$500.000
|
$280.000
|
$130.000
|
$300.000
|
$215.000
|
$250.000
|
$191.780
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,500.000
|
$11,000.000
|
$12,500.000
|
$10,000.000
|
$1,050.000
|
$10,000.000
|
$17,637.340
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
240.000
|
$25.000
|
$19.500
|
$13.000
|
$15.000
|
$13.680
|
$9.000
|
$14.190
|
|
|
TMA (STATIONARY)
|
DAY
|
191.000
|
$150.000
|
$170.000
|
$150.000
|
$150.000
|
$350.000
|
$275.000
|
$233.690
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
44.000
|
$150.000
|
$170.000
|
$250.000
|
$250.000
|
$800.000
|
$475.000
|
$811.450
|
|
Totals: |
$18,724,906.070
|
$18,052,622.000
|
$19,563,485.990
|
$19,987,282.270
|
$21,083,145.480
|
$21,961,452.870
|
$22,527,748.074
|