Job Info for 0910-07-082

County: GREGG Highway: CS Date: 08/02/2023 (1 year ago) Engineer's Estimate: $90,621 Control Number: 0910-07-082
Project: STP 2B23(062)HESG District: TYLER Time: 23 WORKING DAYS Type: ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $90,620.50
3LW CIVIL LLC   $90,510.00 1
-0.12% | -$110.50
THK CONSTRUCTION LLC   $106,917.45 2
17.98% | $16,296.95
18.13% | $16,407.45
TRUE ROADS CONSTRUCTION, LLC   $128,913.75 3
42.26% | $38,293.25
42.43% | $38,403.75
20.57% | $21,996.30
ICOS MANAGEMENT, LLC   $134,195.00 4
48.08% | $43,574.50
48.27% | $43,685.00
4.10% | $5,281.25
SCOUT 5 CONSTRUCTION LLC   $173,650.75 5
91.62% | $83,030.25
91.86% | $83,140.75
29.40% | $39,455.75
EAST TEXAS BRIDGE, INC.   $174,175.00 6
92.2% | $83,554.50
92.44% | $83,665.00
0.30% | $524.25
Subcontractor Percentage Amount
FLEX SUPPLY, LLC 5.19% $4,697.47
Total: 5.19% $4,697.47

Bid Items

Items: 26, 0 filtered
GREGG CS  |  TYLER  |  0910-07-082  |  08/02/2023  |  $90,621  |  STP 2B23(062)HESG  |  ROADWAY REHAB/RECON WITH NO ADDE  |  23 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate 3LW CIVIL LLC THK CONSTRUCTION LLC TRUE ROADS CONSTRUCTION, LLC ICOS MANAGEMENT, LLC SCOUT 5 CONSTRUCTION LLC EAST TEXAS BRIDGE, INC.
104 6009 REMOVING CONC (RIPRAP) SY 20.000 $70.000 $45.000 $50.000 $110.000 $132.000 $100.000 $50.000
104 6015 REMOVING CONC (SIDEWALKS) SY 9.000 $60.000 $30.000 $100.000 $120.000 $220.000 $130.000 $50.000
104 6022 REMOVING CONC (CURB AND GUTTER) LF 150.000 $15.000 $20.000 $11.000 $30.000 $88.000 $100.000 $25.000
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY 20.000 $50.000 $25.000 $50.000 $225.000 $220.000 $150.000 $75.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 100.000 $44.000 $60.000 $25.000 $60.000 $77.000 $90.000 $65.000
164 6005 BROADCAST SEED (PERM) (URBAN) (SANDY) SY 100.000 $3.000 $1.000 $4.000 $12.000 $2.000 $2.000 $5.000
169 6004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY 100.000 $5.000 $2.000 $4.000 $12.000 $12.000 $5.000 $10.000
420 6057 CL C CONC (WINGWALLS) CY 2.200 $1,500.000 $1,600.000 $6,800.000 $4,000.000 $3,850.000 $4,500.000 $5,000.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 22.000 $200.000 $210.000 $500.000 $350.000 $550.000 $600.000 $500.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 13.000 $800.000 $650.000 $846.500 $800.000 $880.000 $700.000 $1,000.000
496 6099 REMOVE STR (RAIL) LF 120.000 $30.000 $33.000 $10.000 $60.000 $55.000 $60.000 $50.000
500 6001 MOBILIZATION LS 1.000 $6,875.000 $9,000.000 $10,000.000 $12,000.000 $15,000.000 $30,000.000 $25,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 $7,500.000 $8,000.000 $3,347.000 $4,200.000 $1.000 $2,500.000 $15,000.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 100.000 $4.000 $5.000 $10.000 $6.000 $1.000 $10.000 $8.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 100.000 $0.750 $1.000 $5.000 $3.000 $1.000 $2.000 $2.000
529 6008 CONC CURB & GUTTER (TY II) LF 150.000 $60.000 $50.000 $80.000 $120.000 $66.000 $146.000 $70.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 206.250 $30.000 $38.000 $30.000 $38.000 $40.000 $57.000 $40.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000 $1,500.000 $1,700.000 $1,522.500 $1,800.000 $4,400.000 $2,500.000 $2,500.000
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF 50.000 $35.000 $34.000 $26.250 $38.000 $88.000 $40.000 $40.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 18.750 $100.000 $78.000 $105.000 $115.000 $220.000 $222.000 $156.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 $3,000.000 $3,300.000 $3,045.000 $3,300.000 $6,600.000 $4,000.000 $5,000.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 6.000 $28.000 $40.000 $26.250 $40.000 $33.000 $60.000 $50.000
662 6046 WK ZN PAV MRK REMOV (REFL) TY I-A EA 38.000 $4.000 $25.000 $13.150 $20.000 $1.000 $40.000 $50.000
662 6056 WK ZN PAV MRK REMOV (TRAF BTN) TY W EA 112.000 $4.000 $15.000 $4.000 $20.000 $1.000 $40.000 $50.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 20.000 $130.000 $100.000 $150.000 $125.000 $1.000 $400.000 $500.000
6185 6002 TMA (STATIONARY) DAY 20.000 $250.000 $1.000 $400.000 $350.000 $1.000 $0.100 $300.000
Totals: $90,620.50 $90,510.00 $106,917.45 $128,913.75 $134,195.00 $173,650.75 $174,175.00