PREPARING ROW
|
AC
|
0.220
|
$6,000.000
|
$50,000.000
|
$25,000.000
|
$50,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
20,246.000
|
$5.600
|
$5.000
|
$8.500
|
$15.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
434.000
|
$9.750
|
$10.000
|
$60.000
|
$20.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
137.000
|
$8.000
|
$10.000
|
$60.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,697.000
|
$12.000
|
$12.000
|
$20.500
|
$10.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
7,579.000
|
$4.000
|
$5.000
|
$10.000
|
$20.000
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
5,113.000
|
$4.000
|
$5.000
|
$15.000
|
$20.000
|
|
|
REMOVE STAB BASE AND ASPH PAV (6"-20")
|
SY
|
11,024.000
|
$8.250
|
$8.000
|
$10.000
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
19,310.000
|
$9.000
|
$8.500
|
$14.000
|
$9.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
192.000
|
$10.000
|
$30.000
|
$38.000
|
$40.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
50.000
|
$89.000
|
$75.000
|
$295.000
|
$150.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
1,222.000
|
$1.000
|
$3.000
|
$12.700
|
$1.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
1,822.000
|
$0.110
|
$0.160
|
$0.660
|
$0.300
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
1,822.000
|
$0.700
|
$0.900
|
$1.000
|
$1.500
|
|
|
LIME (QUICKLIME (DRY))
|
TON
|
442.000
|
$175.000
|
$245.000
|
$240.000
|
$350.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
18,428.000
|
$2.750
|
$4.000
|
$5.000
|
$7.000
|
|
|
CEMENT
|
TON
|
277.000
|
$170.000
|
$215.000
|
$250.000
|
$600.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
18,428.000
|
$4.000
|
$3.000
|
$3.200
|
$7.000
|
|
|
CONC PVMT (JOINTED - CPCD) (8")
|
SY
|
362.000
|
$76.000
|
$82.000
|
$145.000
|
$100.000
|
|
|
CONC PVMT (JOINTED - CPCD) (10")
|
SY
|
23,995.000
|
$96.250
|
$80.000
|
$112.000
|
$100.000
|
|
|
CONC PVMT (JOINTED - CPCD) (12")
|
SY
|
4,086.000
|
$74.000
|
$100.000
|
$153.000
|
$150.000
|
|
|
CONC PVMT (JOINTED-CPCD)(HES)(10")
|
SY
|
7,252.000
|
$87.800
|
$95.000
|
$135.000
|
$125.000
|
|
|
CONC PVMT (JC) (TRANSITION SLAB)
|
SY
|
120.000
|
$200.000
|
$130.000
|
$188.000
|
$250.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,200.000
|
$75.000
|
$140.000
|
$255.000
|
$350.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
56.000
|
$275.000
|
$120.000
|
$180.000
|
$100.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
518.000
|
$72.000
|
$120.000
|
$174.000
|
$100.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
3,449.000
|
$2.000
|
$6.000
|
$25.000
|
$30.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
200.000
|
$220.000
|
$180.000
|
$218.000
|
$200.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
6.000
|
$950.000
|
$1,000.000
|
$900.000
|
$600.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
1.000
|
$110.000
|
$500.000
|
$945.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,015.000
|
$75.000
|
$75.000
|
$85.000
|
$67.000
|
|
|
RC PIPE (CL III)(27 IN)
|
LF
|
35.000
|
$92.000
|
$105.000
|
$115.000
|
$80.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
131.000
|
$100.000
|
$105.000
|
$130.000
|
$100.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
479.000
|
$130.000
|
$145.000
|
$160.000
|
$170.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
1,856.000
|
$150.000
|
$190.000
|
$200.000
|
$200.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
303.000
|
$190.000
|
$240.000
|
$250.000
|
$290.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$4,800.000
|
$5,500.000
|
$6,300.000
|
$6,500.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX6FT)
|
EA
|
1.000
|
$6,500.000
|
$7,200.000
|
$8,800.000
|
$9,000.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
2.000
|
$9,600.000
|
$8,500.000
|
$9,500.000
|
$9,500.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
4.000
|
$6,000.000
|
$5,500.000
|
$7,300.000
|
$7,100.000
|
|
|
INLET (COMPL)(PCO)(5FT)(LEFT)
|
EA
|
10.000
|
$5,620.000
|
$6,500.000
|
$7,900.000
|
$7,500.000
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
10.000
|
$6,000.000
|
$6,500.000
|
$8,200.000
|
$7,500.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
17.000
|
$10,000.000
|
$7,000.000
|
$10,700.000
|
$9,500.000
|
|
|
INLET (COMPL)(PAZD)(SL)(3FTX3FT)
|
EA
|
2.000
|
$4,400.000
|
$4,000.000
|
$6,400.000
|
$7,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$5,000.000
|
$5,500.000
|
$6,900.000
|
$6,000.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
2.000
|
$7,000.000
|
$5,000.000
|
$6,800.000
|
$7,500.000
|
|
|
INLET (COMPL) (EXT) (TY CI)
|
EA
|
9.000
|
$1,500.000
|
$2,500.000
|
$1,000.000
|
$5,000.000
|
|
|
SET (TY I) (24 IN) (4: 1) (C)
|
EA
|
1.000
|
$4,200.000
|
$1,200.000
|
$1,200.000
|
$1,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
32.000
|
$600.000
|
$1,000.000
|
$850.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,820.000
|
$18.000
|
$10.000
|
$50.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$710,073.220
|
$540,000.000
|
$570,000.000
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$6,000.000
|
$6,000.000
|
$5,500.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
200.000
|
$28.000
|
$34.000
|
$52.800
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
200.000
|
$8.500
|
$9.000
|
$13.200
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
200.000
|
$22.000
|
$27.500
|
$39.600
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
200.000
|
$10.000
|
$9.000
|
$13.200
|
$20.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
200.000
|
$20.000
|
$30.000
|
$60.000
|
$200.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
300.000
|
$2.500
|
$3.250
|
$4.300
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
300.000
|
$0.750
|
$0.750
|
$1.300
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,000.000
|
$4.500
|
$4.400
|
$6.300
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,000.000
|
$1.200
|
$1.100
|
$1.300
|
$5.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,210.000
|
$40.000
|
$110.000
|
$125.000
|
$250.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
1,320.000
|
$16.000
|
$20.000
|
$16.000
|
$20.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
360.000
|
$23.000
|
$20.000
|
$16.000
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
2,920.000
|
$7.500
|
$7.000
|
$6.500
|
$10.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
380.000
|
$11.000
|
$7.000
|
$6.500
|
$14.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
1,320.000
|
$9.000
|
$15.000
|
$10.000
|
$10.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
360.000
|
$13.000
|
$15.000
|
$10.000
|
$12.000
|
|
|
CONC CURB (TY I)
|
LF
|
368.000
|
$15.000
|
$15.500
|
$28.000
|
$70.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
6,888.000
|
$6.000
|
$11.500
|
$12.500
|
$9.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
6,382.000
|
$85.000
|
$92.000
|
$110.000
|
$125.000
|
|
|
CONC MEDIAN
|
SY
|
1,627.000
|
$70.000
|
$74.000
|
$105.000
|
$100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
|
EA
|
2.000
|
$16,000.000
|
$29,000.000
|
$35,000.000
|
$40,000.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
327.000
|
$45.000
|
$45.000
|
$100.000
|
$25.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
20.000
|
$4,100.000
|
$6,000.000
|
$7,260.000
|
$50.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,795.000
|
$10.000
|
$10.000
|
$12.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
325.000
|
$19.000
|
$27.000
|
$35.000
|
$35.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,270.000
|
$1.500
|
$1.900
|
$2.250
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
5,520.000
|
$1.600
|
$1.950
|
$2.300
|
$3.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
10.000
|
$978.000
|
$925.000
|
$1,125.000
|
$1,000.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)SP(O)
|
EA
|
5.000
|
$5,830.000
|
$3,500.000
|
$4,225.000
|
$4,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
34.000
|
$525.000
|
$775.000
|
$930.000
|
$750.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
16.000
|
$80.000
|
$90.000
|
$125.000
|
$350.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
429.000
|
$4.000
|
$4.400
|
$5.300
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
340.000
|
$4.250
|
$4.400
|
$5.300
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
1,285.000
|
$3.000
|
$3.850
|
$4.650
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
1,018.000
|
$3.750
|
$3.850
|
$4.650
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
261.000
|
$1.400
|
$2.200
|
$2.650
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,313.000
|
$0.700
|
$2.200
|
$2.650
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,880.000
|
$1.500
|
$2.200
|
$2.650
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
56.000
|
$7.600
|
$9.000
|
$10.600
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
59.000
|
$13.000
|
$55.000
|
$66.000
|
$60.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
5,771.000
|
$0.700
|
$2.200
|
$2.650
|
$3.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
191.000
|
$1.200
|
$2.200
|
$2.650
|
$5.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
82.000
|
$2.500
|
$5.500
|
$6.600
|
$10.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
38.000
|
$36.000
|
$55.000
|
$66.000
|
$60.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
330.000
|
$6.000
|
$6.500
|
$8.000
|
$10.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
8,898.000
|
$0.120
|
$0.550
|
$0.700
|
$1.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
2.000
|
$50.000
|
$165.000
|
$200.000
|
$200.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
396.000
|
$0.350
|
$1.100
|
$1.350
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,493.000
|
$0.310
|
$1.100
|
$1.350
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
10,450.000
|
$0.350
|
$1.100
|
$1.350
|
$1.250
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$480.000
|
$415.000
|
$495.000
|
$600.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
182.000
|
$3.100
|
$4.400
|
$5.300
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
21.000
|
$2.900
|
$4.400
|
$5.300
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
8,898.000
|
$0.040
|
$0.110
|
$0.150
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$20.000
|
$80.000
|
$100.000
|
$100.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
139.000
|
$200.000
|
$200.000
|
$170.000
|
$300.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
6,299.000
|
$150.000
|
$135.000
|
$125.000
|
$170.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
598.000
|
$65.000
|
$75.000
|
$80.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
431.000
|
$133.200
|
$200.000
|
$195.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
431.000
|
$90.340
|
$30.000
|
$195.000
|
$200.000
|
|
Totals: |
$8,294,730.440
|
$8,374,226.450
|
$10,869,082.220
|
$11,616,671.600
|