Job Info for 6449-31-001

County: GRAYSON Highway: US0082 Date: 11/02/2023 (1 year ago) Engineer's Estimate: $661,010 Control Number: 6449-31-001
Project: RMC - 644931001 District: PARIS Time: 365 CALENDAR DAYS Type: METAL BEAM GUARD FENCE REPAIR
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $661,009.50
MARCOM'S MOWING SERVICE, LLC   $548,277.50 1
-17.05% | -$112,732.00
ROSS SA ENTERPRISE LLC   $586,804.00 2
-11.23% | -$74,205.50
7.03% | $38,526.50

Bid Items

Items: 52, 0 filtered
GRAYSON US0082  |  PARIS  |  6449-31-001  |  11/02/2023  |  $661,010  |  RMC - 644931001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate MARCOM'S MOWING SERVICE, LLC ROSS SA ENTERPRISE LLC
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 20.000 $450.000 $400.000 $250.000
500 6033 MOBILIZATION (CALLOUT) EA 12.000 $600.000 $1.000 $1.000
512 6026 PORT CTB (MOVE)(SGL SLP)(TY 2) LF 100.000 $50.000 $20.000 $5.000
512 6063 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF 1,000.000 $50.000 $23.000 $5.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 200.000 $41.760 $42.800 $45.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $2,053.000 $2,280.000 $2,000.000
540 6014 SHORT RADIUS LF 100.000 $43.050 $40.500 $40.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000 $1,560.000 $1,350.000 $6,132.000
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF 100.000 $35.810 $56.440 $37.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 200.000 $61.010 $65.680 $60.000
540 6035 MTL BM GD FEN TRANS (31"-28") EA 20.000 $500.000 $1,350.000 $600.000
540 6038 CONNECTOR PLATE FOR THRIE BEAM EA 4.000 $610.000 $850.000 $680.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,000.000 $10.000 $1.000 $10.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 10.000 $2,500.000 $1.000 $800.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 2.000 $200.000 $1.000 $500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 30.000 $3,000.000 $2,980.000 $3,600.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 20.000 $1,000.000 $1.000 $1.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 30.000 $5.000 $5.000 $1.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 30.000 $5.000 $5.000 $1.000
658 6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA 30.000 $5.000 $5.000 $1.000
658 6027 INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI) EA 30.000 $5.000 $5.000 $1.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 30.000 $50.000 $20.000 $1.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 100.000 $30.000 $50.000 $1.000
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 30.000 $30.000 $30.000 $1.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 2,500.000 $22.000 $19.300 $22.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 50.000 $79.240 $80.000 $5.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 25.000 $76.100 $73.000 $5.000
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF 50.000 $42.080 $39.430 $30.000
770 6010 REM / REPL TIMBER/STL POST W/O CONC FND EA 300.000 $75.000 $72.000 $1.000
770 6017 REALIGN POSTS EA 300.000 $15.000 $1.000 $1.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 300.000 $45.000 $52.000 $45.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 75.000 $81.000 $70.000 $100.000
770 6024 REPLACE TERMINAL ANCHOR POSTS EA 2.000 $5.000 $1.000 $250.000
770 6025 REPLACE HINGED TOP SGT STEEL POST EA 2.000 $800.000 $1,480.000 $350.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 50.000 $3,500.000 $3,040.000 $3,500.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 5.000 $1,100.000 $1,450.000 $1,000.000
770 6029 REM & RESET SGT IMPACT HEAD EA 5.000 $100.000 $100.000 $300.000
770 6031 REPLACE SGT CABLE ANCHOR EA 5.000 $110.000 $200.000 $1.000
770 6032 REPLACE SGT STRUT EA 3.000 $300.000 $55.000 $1.000
770 6033 REPLACE SGT OBJECT MARKER EA 10.000 $20.000 $20.000 $1.000
770 6052 REPAIR STEEL POST WITH BASE PLATE EA 6.000 $250.000 $225.000 $100.000
771 6002 REPLACE POSTS (TL-4) EA 300.000 $155.000 $172.000 $303.000
771 6004 CABLE SPLICE / TURNBUCKLE (TL-4) EA 5.000 $250.000 $350.000 $150.000
771 6006 REPAIR CONCRETE FOUNDATION (TL-4) EA 5.000 $250.000 $50.000 $1.000
771 6008 REPR OR REPLC CABLE BARR TERM SEC(TL-4) EA 10.000 $500.000 $500.000 $800.000
771 6010 REPLACE CABLE (TL-4) LF 200.000 $5.000 $5.000 $4.000
771 6011 CHECK / RE-TENSION CABLE EA 20.000 $200.000 $150.000 $50.000
774 6003 REMOVE AND REPLACE (NARROW REACT 350) EA 2.000 $5,000.000 $10,000.000 $5,000.000
774 6010 REPAIR (REACT) EA 2.000 $500.000 $500.000 $1,000.000
774 6079 REMOVE & REPLACE TRACC (TXDOT FURNISHD) EA 2.000 $2,500.000 $200.000 $3,500.000
774 6080 REMOVE & REPLACE REACT 350(TXDOT FRNSH) EA 2.000 $2,500.000 $200.000 $3,500.000
6185 6002 TMA (STATIONARY) DAY 60.000 $250.000 $1.000 $1.000
Totals: $661,009.50 $548,277.50 $586,804.00