Show Job Controls
Bid Cobra

GRAYSON US0082 (6379-87-001)

Items: 59

County: GRAYSON
Length: N/A
Highway: US0082
District: PARIS
Control Number: 6379-87-001
DBE Goal: N/A
Project: RMC - 637987001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $699,075.00
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$699,075.00
Over/Under Est: -50.02% -$349,645.98
Over/Under Est: -23.31% -$162,941.50
Amt Left: 53.43% $186,704.48
Over/Under Est: -16.45% -$115,023.00
Amt Left: 67.14% $234,622.98
Delta: -8.94% -$47,918.50

Bid Items & Bid Tabulations

59 Total 0 of 59
GRAYSON  |  US0082  |  PARIS  |  6379-87-001  |  07/02/2021  |  $699,075.00  |  RMC - 637987001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC
MARCOM'S MOWING SERVICE, LLC
SOUTHERN CROSS CONTRACTORS, LLC
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $600.000 $500.000 $450.000 $250.000
MOBILIZATION (CALLOUT)
EA 12.000 $600.000 $3,500.000 $1.000 $1.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 100.000 $75.000 $60.000 $50.000 $20.000
PORT CTB (MOVE) (SAFETY SH) (TY 2)
LF 100.000 $75.000 $60.000 $50.000 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 200.000 $35.000 $30.000 $41.760 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $1,600.000 $2,053.000 $1,875.000
SHORT RADIUS
LF 100.000 $35.000 $40.000 $43.050 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,250.000 $800.000 $1,560.000 $1,025.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $42.000 $24.000 $35.810 $25.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 200.000 $75.000 $60.000 $61.010 $65.000
MTL BM GD FEN TRANS (31"-28")
EA 20.000 $2,150.000 $750.000 $1.000 $800.000
CONNECTOR PLATE FOR THRIE BEAM
EA 4.000 $400.000 $950.000 $610.000 $600.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $10.000 $6.000 $10.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $200.000 $250.000 $2,500.000 $250.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $250.000 $250.000 $1.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $3,000.000 $500.000 $2,000.000 $2,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $500.000 $300.000 $3,000.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 30.000 $30.000 $10.000 $1.000 $12.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 30.000 $30.000 $10.000 $1.000 $15.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 30.000 $30.000 $10.000 $1.000 $15.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 30.000 $30.000 $10.000 $1.000 $15.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 20.000 $80.000 $200.000 $30.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 30.000 $40.000 $17.000 $50.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 100.000 $30.000 $17.000 $30.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 30.000 $30.000 $17.000 $30.000 $20.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,000.000 $20.000 $9.000 $17.260 $18.250
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $70.000 $20.000 $79.240 $60.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $75.000 $30.000 $76.100 $75.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 50.000 $35.000 $35.000 $42.080 $40.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 300.000 $80.000 $40.000 $60.000 $85.000
REALIGN POSTS
EA 300.000 $30.000 $10.000 $20.000 $35.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 300.000 $30.000 $20.000 $30.600 $39.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 75.000 $80.000 $100.000 $81.000 $95.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $250.000 $200.000 $5.000 $50.000
REPLACE HINGED TOP SGT STEEL POST
EA 2.000 $100.000 $200.000 $800.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 50.000 $3,250.000 $500.000 $3,500.000 $2,850.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,250.000 $1,250.000 $850.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $50.000 $150.000 $100.000 $300.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $100.000 $35.000 $110.000 $70.000
REPLACE SGT STRUT
EA 3.000 $350.000 $35.000 $300.000 $60.000
REPLACE SGT OBJECT MARKER
EA 10.000 $60.000 $25.000 $20.000 $25.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 100.000 $18.000 $15.000 $10.000 $5.000
REPAIR STEEL POST WITH BASE PLATE
EA 6.000 $250.000 $250.000 $250.000 $250.000
REPLACE POSTS (TL-4)
EA 300.000 $120.000 $50.000 $155.000 $140.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $250.000 $100.000 $250.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $250.000 $100.000 $250.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,000.000 $2,000.000 $500.000 $750.000
REPLACE CABLE (TL-4)
LF 200.000 $6.000 $7.000 $5.000 $5.000
CHECK / RE-TENSION CABLE
EA 20.000 $250.000 $500.000 $200.000 $200.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $15,000.000 $11,000.000 $5,000.000 $13,800.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 2.000 $20,000.000 $2,000.000 $5,000.000 $19,950.000
REPAIR (TRACC)
LF 15.000 $500.000 $200.000 $500.000 $800.000
REPAIR (REACT)
EA 2.000 $5,000.000 $200.000 $500.000 $1,500.000
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $18,000.000 $12,500.000 $10,000.000 $16,250.000
REPAIR (FASTRACC)
LF 25.000 $500.000 $200.000 $500.000 $500.000
REMOVE & REPLACE TRACC (TXDOT FURNISHD)
EA 2.000 $3,600.000 $1.000 $2,500.000 $1,500.000
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
EA 2.000 $3,600.000 $1.000 $2,500.000 $1,500.000
REPAIR (HEART)
EA 2.000 $3,000.000 $0.010 $500.000 $1,500.000
TMA (STATIONARY)
DAY 60.000 $250.000 $150.000 $1.000 $200.000
Totals: $699,075.000 $349,429.020 $536,133.500 $584,052.000