PREPARING ROW
|
STA
|
287.000
|
$200.000
|
$48.530
|
$16.000
|
$100.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
257.000
|
$15.000
|
$32.980
|
$61.500
|
$40.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
73.000
|
$60.000
|
$32.400
|
$47.000
|
$87.730
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
198.000
|
$16.260
|
$33.450
|
$32.000
|
$42.310
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
14,842.000
|
$15.000
|
$19.440
|
$21.500
|
$17.990
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
7,342.000
|
$35.000
|
$18.080
|
$26.000
|
$16.410
|
|
|
BACKFILL (TY A)
|
STA
|
287.000
|
$179.300
|
$223.420
|
$470.000
|
$384.770
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
13.270
|
$583.870
|
$621.000
|
$610.000
|
$699.970
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
13.270
|
$500.000
|
$464.400
|
$455.000
|
$523.460
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR 4)(9")
|
SY
|
69,778.000
|
$34.000
|
$30.790
|
$27.000
|
$24.390
|
|
|
REWORK BS MTL (TY B)(15")(DEN CONT)
|
SY
|
35,000.000
|
$24.000
|
$22.990
|
$22.000
|
$11.980
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
874.000
|
$340.000
|
$414.810
|
$400.000
|
$476.480
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
74,694.000
|
$6.000
|
$6.200
|
$5.500
|
$4.110
|
|
|
PRIME COAT (MC-30)
|
GAL
|
16,898.000
|
$5.250
|
$5.200
|
$5.150
|
$6.740
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
6,776.000
|
$6.000
|
$4.210
|
$5.750
|
$5.430
|
|
|
ASPH (AC-5)
|
GAL
|
25,684.000
|
$5.000
|
$3.520
|
$4.750
|
$5.270
|
|
|
AGGR(TY-B GR-3 SAC-A)
|
CY
|
614.000
|
$210.000
|
$217.670
|
$160.000
|
$171.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
15,814.000
|
$28.000
|
$30.000
|
$46.000
|
$41.650
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
4,384.000
|
$3.500
|
$6.490
|
$9.700
|
$8.130
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
36,549.000
|
$1.500
|
$2.810
|
$3.250
|
$3.030
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
13,060.000
|
$1.500
|
$3.300
|
$2.550
|
$3.560
|
|
|
TEMPORARY SPL SHORING
|
SF
|
300.000
|
$35.000
|
$108.000
|
$110.000
|
$66.950
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
190.000
|
$850.000
|
$783.000
|
$560.000
|
$1,305.820
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
0.800
|
$2,500.000
|
$1,620.000
|
$650.000
|
$2,434.690
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
147.000
|
$850.000
|
$810.000
|
$755.000
|
$870.400
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
25.000
|
$640.000
|
$1,296.000
|
$1,550.000
|
$1,156.480
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
30.000
|
$250.000
|
$124.200
|
$220.000
|
$115.650
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
483.000
|
$250.000
|
$172.800
|
$155.000
|
$170.430
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$11,000.000
|
$10,800.000
|
$14,500.000
|
$13,999.470
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$8,640.000
|
$12,960.000
|
$15,800.000
|
$17,042.830
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,000.000
|
$2,160.000
|
$3,900.000
|
$2,434.690
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$1,500.000
|
$2,916.000
|
$4,300.000
|
$2,921.630
|
|
|
ADJUSTING MANHOLES
|
EA
|
20.000
|
$2,500.000
|
$3,780.000
|
$2,200.000
|
$3,043.360
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$6,000.000
|
$1,620.000
|
$3,700.000
|
$6,086.730
|
|
|
REMOV STR (SET)
|
EA
|
34.000
|
$1,530.000
|
$324.000
|
$1,300.000
|
$608.670
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$4,000.000
|
$2,160.000
|
$1,500.000
|
$1,217.350
|
|
|
REMOV STR (PIPE)
|
LF
|
463.000
|
$30.000
|
$32.400
|
$55.000
|
$14.610
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
4.000
|
$160.000
|
$216.000
|
$325.000
|
$243.470
|
|
|
REMOVE STR (PIPE SUPPORT STRUCTURE)
|
LF
|
44.000
|
$350.000
|
$54.000
|
$300.000
|
$609.220
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,575,000.000
|
$872,854.860
|
$1,750,000.000
|
$1,875,138.400
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$23,000.000
|
$22,616.700
|
$35,000.000
|
$35,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,060.000
|
$3.500
|
$4.160
|
$10.000
|
$4.690
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,060.000
|
$1.300
|
$1.080
|
$4.000
|
$1.220
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
1,713.000
|
$200.000
|
$237.600
|
$104.000
|
$137.050
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
257.000
|
$100.000
|
$91.800
|
$53.000
|
$80.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
9,169.000
|
$25.000
|
$27.570
|
$35.000
|
$45.220
|
|
|
DRIVEWAYS (CONC)
|
SY
|
200.000
|
$150.000
|
$135.000
|
$135.000
|
$200.000
|
|
|
TURNOUTS (ACP)
|
SY
|
37.000
|
$130.000
|
$362.750
|
$90.000
|
$332.210
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
3,838.000
|
$60.000
|
$59.230
|
$40.000
|
$54.980
|
|
|
CONC SIDEWALKS (4")
|
SY
|
4,895.000
|
$155.000
|
$113.400
|
$75.000
|
$102.540
|
|
|
CURB RAMPS (TY 7)
|
SY
|
627.000
|
$145.000
|
$226.800
|
$175.000
|
$259.230
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
57,249.000
|
$0.250
|
$0.060
|
$0.350
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
12,125.000
|
$0.400
|
$0.100
|
$0.450
|
$0.150
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
45.000
|
$171.000
|
$151.200
|
$100.000
|
$180.060
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,856.000
|
$30.000
|
$32.990
|
$30.000
|
$34.090
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$2,000.000
|
$1,535.760
|
$1,800.000
|
$2,069.490
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
510.000
|
$3.500
|
$5.400
|
$2.150
|
$2.430
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,500.000
|
$3,465.720
|
$4,225.000
|
$4,869.380
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$400.000
|
$540.000
|
$215.000
|
$243.470
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
3.000
|
$400.000
|
$441.720
|
$850.000
|
$497.890
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
129.000
|
$40.000
|
$42.120
|
$79.250
|
$47.480
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$1,166.370
|
$871.560
|
$1,600.000
|
$982.400
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$1,051.050
|
$1,049.760
|
$1,600.000
|
$1,183.260
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,229.910
|
$1,381.320
|
$1,640.000
|
$1,556.980
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,432.810
|
$1,435.320
|
$1,700.000
|
$1,617.850
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
20.000
|
$750.000
|
$878.040
|
$1,100.000
|
$989.700
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
30.000
|
$45.000
|
$57.190
|
$43.000
|
$48.690
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
2.000
|
$150.250
|
$136.080
|
$185.000
|
$153.390
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
|
EA
|
4.000
|
$82.290
|
$136.080
|
$200.000
|
$153.390
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
11.000
|
$139.580
|
$136.080
|
$200.000
|
$153.390
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
41,990.000
|
$0.400
|
$0.320
|
$0.350
|
$0.370
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
84,764.000
|
$0.400
|
$0.320
|
$0.350
|
$0.370
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
13,783.000
|
$0.880
|
$1.080
|
$1.050
|
$1.220
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
396.000
|
$5.000
|
$1.080
|
$1.050
|
$1.220
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,933.000
|
$1.720
|
$1.350
|
$1.350
|
$1.520
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
503.000
|
$9.600
|
$10.800
|
$10.550
|
$12.170
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
12.000
|
$384.000
|
$243.000
|
$238.000
|
$273.900
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
12.000
|
$218.720
|
$351.000
|
$345.000
|
$395.640
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
4.000
|
$28.000
|
$108.000
|
$105.000
|
$121.730
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
126,754.000
|
$1.000
|
$0.810
|
$0.800
|
$0.910
|
|
|
REINFORMT GRID FOR ASPHALT PVMT OVERLAY
|
SY
|
123,842.000
|
$9.530
|
$7.130
|
$7.000
|
$8.750
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
43,053.000
|
$150.000
|
$156.610
|
$143.250
|
$151.430
|
|
|
TACK COAT
|
GAL
|
35,614.000
|
$6.000
|
$4.640
|
$6.000
|
$7.220
|
|
|
UNDERSEAL COURSE
|
GAL
|
35,235.000
|
$6.000
|
$6.880
|
$5.000
|
$4.320
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$19,947.430
|
$27,000.000
|
$24,585.260
|
|
|
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
|
LF
|
4,778.000
|
$0.800
|
$1.080
|
$1.050
|
$1.220
|
|
|
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
|
LF
|
67,587.000
|
$0.600
|
$0.700
|
$0.700
|
$0.790
|
|
|
HPPM W/RET REQ TY I(Y)6"(BRK)(090MIL)
|
LF
|
10,199.000
|
$0.750
|
$0.910
|
$0.900
|
$1.020
|
|
|
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
|
LF
|
64,700.000
|
$0.600
|
$0.700
|
$0.700
|
$0.790
|
|
|
TMA (STATIONARY)
|
DAY
|
190.000
|
$250.000
|
$486.240
|
$510.000
|
$538.090
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
100.000
|
$100.000
|
$109.860
|
$100.000
|
$105.150
|
|
|
REC REFL PAV MRKR TY I-C
|
EA
|
296.000
|
$26.000
|
$48.600
|
$47.550
|
$54.780
|
|
|
REC REFL PAV MRKR TY II-A-A
|
EA
|
1,342.000
|
$26.000
|
$48.600
|
$47.550
|
$54.780
|
|
Totals: |
$18,393,817.445
|
$17,457,097.328
|
$17,566,864.250
|
$18,105,003.088
|