PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
23.000
|
$300.000
|
$165.000
|
$355.000
|
$800.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
1.000
|
$2,500.000
|
$900.000
|
$3,500.000
|
$1,200.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
27,464.000
|
$19.000
|
$14.300
|
$15.500
|
$23.500
|
|
|
REMOVING CONC (CURB)
|
LF
|
319.000
|
$10.000
|
$11.000
|
$20.500
|
$15.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
1,536.000
|
$15.000
|
$19.500
|
$13.000
|
$13.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
12,944.000
|
$10.000
|
$6.000
|
$6.050
|
$13.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
31,547.000
|
$8.000
|
$4.550
|
$4.750
|
$6.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
6,264.000
|
$10.000
|
$12.550
|
$11.500
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
123,408.000
|
$13.000
|
$11.100
|
$12.750
|
$12.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
15,925.000
|
$19.000
|
$14.000
|
$18.000
|
$16.000
|
|
|
BLADING
|
HR
|
8.000
|
$400.000
|
$525.000
|
$615.000
|
$250.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
14.690
|
$700.000
|
$630.000
|
$700.000
|
$1,000.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
13.540
|
$550.000
|
$475.000
|
$530.000
|
$800.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
2,779.000
|
$3.000
|
$3.650
|
$4.050
|
$4.000
|
|
|
CEMENT
|
TON
|
342.000
|
$325.000
|
$265.000
|
$325.000
|
$350.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
31,537.000
|
$6.500
|
$3.750
|
$5.800
|
$7.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
7,715.000
|
$6.000
|
$5.300
|
$5.250
|
$7.000
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
6,567.000
|
$6.000
|
$4.350
|
$5.000
|
$5.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
27,454.000
|
$110.000
|
$153.000
|
$155.000
|
$110.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
64.000
|
$400.000
|
$370.000
|
$410.000
|
$350.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
338.000
|
$600.000
|
$530.000
|
$590.000
|
$640.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
630.000
|
$160.000
|
$91.500
|
$260.000
|
$120.000
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-4FTX4FT)
|
EA
|
1.000
|
$15,000.000
|
$30,000.000
|
$41,000.000
|
$28,660.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$5,500.000
|
$4,100.000
|
$2,650.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$2,000.000
|
$3,250.000
|
$2,900.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$600.000
|
$2,150.000
|
$2,900.000
|
$600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
116.000
|
$40.000
|
$60.000
|
$59.000
|
$50.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$140,000.000
|
$210,000.000
|
$170,000.000
|
$497,204.800
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,050,000.000
|
$1,290,000.000
|
$1,300,000.000
|
$1,333,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$20,000.000
|
$35,000.000
|
$11,500.000
|
$74,380.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,675.000
|
$6.000
|
$7.200
|
$3.550
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,675.000
|
$2.000
|
$3.500
|
$1.200
|
$1.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
8,667.000
|
$145.000
|
$145.000
|
$120.000
|
$180.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
10,800.000
|
$25.000
|
$12.000
|
$9.850
|
$25.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
10,800.000
|
$15.000
|
$9.000
|
$5.750
|
$6.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
10,800.000
|
$25.000
|
$12.000
|
$8.250
|
$12.000
|
|
|
TURNOUTS (RAP)
|
SY
|
1,300.000
|
$20.000
|
$8.000
|
$8.250
|
$16.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
12,250.000
|
$0.250
|
$1.550
|
$1.750
|
$1.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,025.000
|
$36.000
|
$33.300
|
$37.000
|
$31.500
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
LF
|
2.000
|
$2,800.000
|
$2,850.000
|
$3,200.000
|
$2,700.000
|
|
|
CONNECTOR PLATE FOR THRIE BEAM
|
EA
|
1.000
|
$900.000
|
$740.000
|
$825.000
|
$700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,990.000
|
$3.500
|
$3.200
|
$3.550
|
$3.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
3.000
|
$300.000
|
$320.000
|
$355.000
|
$300.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$320.000
|
$320.000
|
$355.000
|
$300.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
11,811.000
|
$14.000
|
$17.000
|
$19.000
|
$16.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
5.000
|
$4,000.000
|
$4,755.000
|
$5,300.000
|
$4,500.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
12,689.000
|
$3.500
|
$2.100
|
$2.350
|
$2.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
6.000
|
$1,000.000
|
$1,100.000
|
$1,200.000
|
$1,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$4,000.000
|
$3,550.000
|
$3,900.000
|
$3,350.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$350.000
|
$320.000
|
$355.000
|
$300.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
8.000
|
$1,000.000
|
$1,150.000
|
$1,200.000
|
$1,089.000
|
|
|
IN RD IL (TY ST) 50T-12-12(400W EQ)LED
|
EA
|
8.000
|
$9,500.000
|
$6,450.000
|
$8,200.000
|
$6,091.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,090.000
|
$18.000
|
$25.000
|
$23.500
|
$22.750
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
440.000
|
$40.000
|
$30.000
|
$47.000
|
$28.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,650.000
|
$2.000
|
$2.150
|
$2.950
|
$2.030
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
5,300.000
|
$2.500
|
$2.250
|
$2.950
|
$2.100
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$2,000.000
|
$1,350.000
|
$1,800.000
|
$1,275.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$400.000
|
$525.000
|
$470.000
|
$495.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
2.000
|
$1,000.000
|
$1,055.000
|
$1,200.000
|
$1,000.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$9,000.000
|
$8,100.000
|
$12,000.000
|
$7,629.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$975.000
|
$1,050.000
|
$1,100.000
|
$975.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$1,100.000
|
$1,215.000
|
$1,400.000
|
$1,150.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$500.000
|
$770.000
|
$855.000
|
$725.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
15.000
|
$200.000
|
$110.000
|
$120.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
28,633.000
|
$0.700
|
$0.500
|
$0.540
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
50,067.000
|
$0.700
|
$0.500
|
$0.540
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
3,603.000
|
$3.000
|
$2.650
|
$2.950
|
$2.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,572.000
|
$1.500
|
$1.600
|
$1.700
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,442.000
|
$1.500
|
$1.600
|
$1.700
|
$2.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
17,533.000
|
$0.400
|
$0.350
|
$0.350
|
$0.300
|
|
|
PAVEMENT SEALER 10"
|
LF
|
16,550.000
|
$0.600
|
$0.350
|
$0.350
|
$0.300
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
7,835.000
|
$1.000
|
$1.350
|
$1.450
|
$1.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
17,533.000
|
$0.250
|
$0.650
|
$0.710
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (10")
|
LF
|
16,550.000
|
$0.400
|
$0.750
|
$0.820
|
$0.700
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
5,094.000
|
$180.000
|
$150.000
|
$180.000
|
$160.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$8,500.000
|
$19,000.000
|
$12,000.000
|
|
|
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
|
LF
|
16,550.000
|
$11.000
|
$15.850
|
$17.500
|
$15.000
|
|
|
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
|
LF
|
6,601.000
|
$0.650
|
$1.600
|
$1.750
|
$1.500
|
|
|
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
|
LF
|
10,932.000
|
$0.650
|
$1.600
|
$1.750
|
$1.500
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
5,400.000
|
$35.000
|
$25.000
|
$33.000
|
$25.000
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
5,400.000
|
$3.000
|
$2.000
|
$3.550
|
$2.100
|
|
|
MODULAR GLARE SCREENS (MOVE)
|
LF
|
5,400.000
|
$3.000
|
$3.500
|
$8.850
|
$9.000
|
|
|
TMA (STATIONARY)
|
DAY
|
45.000
|
$250.000
|
$450.000
|
$295.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
48.000
|
$150.000
|
$85.000
|
$120.000
|
$100.000
|
|
Totals: |
$12,348,796.400
|
$12,919,745.100
|
$13,117,209.980
|
$14,183,888.800
|