Job Info for 0275-05-044

County: GRAY Highway: IH 40 Date: 10/02/2018 (6 years ago) Engineer's Estimate: $17,835,108 Control Number: 0275-05-044
Project: NH 2019(079) District: AMARILLO Time: 136 WORKING DAYS Type: OVERLAY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $17,835,107.50
KIEWIT INFRASTRUCTURE SOUTH CO.   $16,401,396.63 1
-8.04% | -$1,433,710.87
J. LEE MILLIGAN, INC.   $16,584,964.53 2
-7.01% | -$1,250,142.97
1.12% | $183,567.90
DUININCK, INC.   $17,366,162.04 3
-2.63% | -$468,945.46
5.88% | $964,765.41
4.71% | $781,197.51
RK HALL, LLC   $18,611,010.97 4
4.35% | $775,903.47
13.47% | $2,209,614.34
7.17% | $1,244,848.93
GILVIN-TERRILL, LTD.   $19,366,285.02 5
8.59% | $1,531,177.52
18.08% | $2,964,888.39
4.06% | $755,274.05

Bid Items

Items: 50, 0 filtered
GRAY IH 40  |  AMARILLO  |  0275-05-044  |  10/02/2018  |  $17,835,108  |  NH 2019(079)  |  OVERLAY  |  136 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate KIEWIT INFRASTRUCTURE SOUTH CO. J. LEE MILLIGAN, INC. DUININCK, INC. RK HALL, LLC GILVIN-TERRILL, LTD.
100 6001 PREPARING ROW AC 24.230 $400.000 $175.640 $390.000 $165.000 $580.000 $230.000
134 6001 BACKFILL (TY A) STA 1,055.260 $200.000 $165.990 $225.000 $175.000 $175.000 $216.000
164 6036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 22.950 $500.000 $438.060 $405.000 $405.000 $408.100 $385.000
164 6053 DRILL SEEDING (TEMP)(WARM OR COOL) AC 22.950 $500.000 $341.340 $315.000 $315.000 $318.000 $300.000
314 6009 EMULS ASPH (EROSN CONT)(MULTI) GAL 5,718.000 $3.000 $4.020 $3.250 $5.150 $3.800 $5.000
314 6009 EMULS ASPH (EROSN CONT)(MULTI) GAL 1,225.000 $3.000 $4.020 $3.250 $5.150 $3.800 $5.000
346 6015 STONE-MTRX-ASPH SMA-D SAC-A PG76-28 TON 116,244.000 $120.000 $108.000 $112.800 $122.250 $131.280 $115.000
351 6019 FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") SY 21,985.000 $30.000 $29.750 $23.300 $28.000 $27.280 $102.000
354 6022 PLANE ASPH CONC PAV(0" TO 3") SY 15,999.000 $3.000 $1.610 $1.800 $2.000 $2.420 $3.000
354 6036 PLANE CONC PAV(0" TO 1-1/2") SY 7,484.000 $2.000 $2.590 $3.200 $4.250 $3.050 $3.000
354 6048 PLANE ASPH CONC PAV (3") SY 8,001.000 $5.000 $3.540 $2.300 $2.050 $2.420 $3.000
354 6096 PLANE ASPH CONC PAV (3"- 5") SY 141,849.000 $3.000 $2.260 $2.200 $2.750 $2.120 $2.900
500 6001 MOBILIZATION LS 1.000 $1,250,000.000 $1,470,463.600 $1,214,300.000 $650,000.000 $1,000,000.000 $1,750,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $15,000.000 $20,000.000 $22,300.000 $28,000.000 $22,800.000 $36,000.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 211,053.000 $0.150 $0.110 $0.100 $0.120 $0.140 $0.120
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 1,725.000 $25.000 $25.600 $29.000 $23.500 $29.150 $23.000
540 6008 MTL BEAM GD FEN TRANS (T101) EA 12.000 $1,000.000 $989.900 $1,475.000 $915.000 $1,484.000 $870.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 5.000 $1,100.000 $1,126.430 $1,290.000 $1,000.000 $1,298.500 $990.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,675.000 $2.500 $1.990 $3.150 $1.850 $3.180 $2.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 8.000 $250.000 $199.120 $316.000 $185.000 $318.000 $175.000
542 6005 RM MTL BM GD FEN TRANS (T101) EA 12.000 $175.000 $170.670 $316.000 $155.000 $318.000 $150.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 7.000 $2,500.000 $2,787.640 $2,950.000 $2,600.000 $2,968.000 $2,450.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $350.000 $227.560 $316.000 $210.000 $318.000 $200.000
636 6002 ALUMINUM SIGNS (TY G) SF 199.000 $25.000 $32.430 $30.000 $30.000 $30.210 $21.000
644 6002 IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) EA 2.000 $1,000.000 $978.520 $906.000 $905.000 $911.600 $805.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 5.000 $1,000.000 $1,171.950 $1,085.000 $1,100.000 $1,091.800 $620.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 $1,000.000 $1,393.820 $1,290.000 $1,300.000 $1,298.500 $950.000
644 6064 IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 6.000 $2,000.000 $3,037.960 $2,812.000 $2,800.000 $2,830.200 $1,660.000
644 6076 REMOVE SM RD SN SUP&AM EA 7.000 $110.000 $113.780 $105.000 $105.000 $106.000 $60.000
644 6077 REMOVE BRDG MNT CLEARANCE SIGN ASSM EA 6.000 $500.000 $341.340 $316.000 $315.000 $318.000 $230.000
647 6001 INSTALL LRSS (STRUCT STEEL) LB 739.200 $6.500 $5.690 $5.300 $5.250 $5.300 $18.000
647 6003 REMOVE LRSA EA 3.000 $700.000 $910.250 $843.000 $840.000 $848.000 $1,070.000
658 6001 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA 126.000 $100.000 $73.960 $142.200 $68.500 $143.100 $68.000
658 6018 INSTL DEL ASSM (D-SY)SZ 1(FLX)GND EA 53.000 $115.000 $73.960 $142.200 $68.500 $143.100 $69.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 179.000 $20.000 $3.410 $12.650 $3.150 $12.720 $3.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 27.000 $50.000 $25.030 $42.150 $23.000 $42.400 $24.000
662 6060 WK ZN PAV MRK REMOV (W)4"(BRK) LF 43,192.000 $0.750 $0.800 $0.740 $0.730 $0.740 $0.700
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 129,579.000 $0.500 $0.800 $0.740 $0.730 $0.740 $0.700
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 129,579.000 $0.750 $0.800 $0.740 $0.730 $0.740 $0.700
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 11,746.000 $1.000 $2.280 $1.100 $1.050 $0.900 $1.000
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 5,210.000 $0.800 $0.690 $0.640 $0.640 $0.650 $0.610
666 6299 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 35,011.000 $0.450 $0.340 $0.320 $0.310 $0.320 $0.300
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 219,973.000 $0.350 $0.340 $0.320 $0.310 $0.320 $0.300
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 370.000 $1.000 $0.340 $0.320 $0.310 $0.320 $0.300
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 218,174.000 $1.000 $0.340 $0.320 $0.310 $0.320 $0.300
672 6010 REFL PAV MRKR TY II-C-R EA 1,387.000 $3.000 $3.930 $3.630 $3.600 $3.660 $3.450
3041 6001 UNDERSEAL COURSE GAL 76,215.000 $4.000 $3.470 $3.100 $4.500 $4.000 $4.500
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $20,000.000 $22,369.370 $22,650.000 $13,000.000 $5,000.000 $15,000.000
6185 6002 TMA (STATIONARY) DAY 2.000 $150.000 $300.000 $619.000 $250.000 $500.000 $700.000
6185 6003 TMA (MOBILE OPERATION) HR 340.000 $40.000 $71.390 $61.900 $105.000 $80.000 $70.000
Totals: $17,835,107.50 $16,401,396.66 $16,584,964.53 $17,366,162.04 $18,611,010.97 $19,366,285.02