Job Info for 0535-04-031

County: GONZALES Highway: IH 10 Date: 08/03/2023 (1 year ago) Engineer's Estimate: $2,189,204 Control Number: 0535-04-031
Project: C 535-4-31 District: YOAKUM Time: 92 WORKING DAYS Type: UPGRADE DYNAMIC MESSAGE SIGN BOARDS
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
Plans: Plans | Revision | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,189,203.75
TRAF-TEX, INC.   $2,182,973.85 1
-0.28% | -$6,229.90
THE LEVY COMPANY, INC.   $2,318,868.46 2
5.92% | $129,664.71
6.23% | $135,894.61

Bid Items

Items: 35, 0 filtered
GONZALES IH 10  |  YOAKUM  |  0535-04-031  |  08/03/2023  |  $2,189,204  |  C 535-4-31  |  UPGRADE DYNAMIC MESSAGE SIGN BOARDS  |  92 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TRAF-TEX, INC. THE LEVY COMPANY, INC.
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 239.750 $65.000 $250.000 $83.240
247 6366 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) CY 302.000 $300.000 $250.000 $342.520
416 6005 DRILL SHAFT (42 IN) LF 189.000 $375.000 $775.000 $512.320
416 6006 DRILL SHAFT (48 IN) LF 270.000 $475.000 $790.000 $610.400
432 6001 RIPRAP (CONC)(4 IN) CY 9.000 $525.000 $1,658.000 $382.910
500 6001 MOBILIZATION LS 1.000 $190,000.000 $120,279.000 $231,886.840
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 $2,500.000 $3,631.000 $10,348.980
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 900.000 $10.000 $4.160 $5.530
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 900.000 $2.500 $1.330 $1.740
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 2,500.000 $45.000 $26.630 $23.950
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 8.000 $2,200.000 $1,691.000 $1,510.000
540 6021 MTL THRIE-BEAM GD FEN (TIM POST) EA 1.000 $2,700.000 $2,491.000 $2,205.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 175.000 $3.500 $3.570 $3.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 9.000 $3,500.000 $3,726.000 $3,260.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 1.000 $275.000 $354.000 $225.000
618 6007 CONDT (HDPE) (2") (STL ENCSE) LF 6,705.000 $50.000 $25.290 $36.970
618 6070 CONDT (RM) (2") LF 1,080.000 $50.000 $27.000 $19.660
620 6015 ELEC CONDR (NO.2) BARE LF 7,275.000 $5.500 $3.550 $3.430
620 6016 ELEC CONDR (NO.2) INSULATED LF 16,030.000 $5.000 $3.780 $3.710
624 6002 GROUND BOX TY A (122311)W/APRON EA 18.000 $975.000 $1,349.000 $1,340.890
628 6250 ELC SRV TY D 120/240 100(NS)SS(N)SP(O) EA 6.000 $6,500.000 $7,843.000 $7,387.110
650 6021 INS OH SN SUP(25 FT BAL TEE) EA 9.000 $35,000.000 $53,647.000 $60,897.530
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 3.000 $8,500.000 $2,134.000 $3,342.100
6007 6010 FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER) LF 2,120.000 $4.000 $4.830 $7.370
6007 6011 FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER) LF 490.000 $6.000 $21.210 $13.350
6007 6021 FIBER OPTIC SPLICE ENCLOSURE EA 9.000 $3,100.000 $1,155.000 $913.530
6007 6023 FIBER OPTIC PATCH PANEL (12 POSITION) EA 9.000 $1,400.000 $457.000 $963.860
6010 6002 CCTV FIELD EQUIPMENT (DIGITAL) EA 9.000 $8,750.000 $6,381.000 $9,126.360
6010 6003 CCTV FIELD CONTROLLER EA 9.000 $4,200.000 $5,725.000 $0.010
6028 6002 INSTALL DMS (FOUNDATION MTD CABINET) EA 9.000 $12,000.000 $15,420.000 $13,656.500
6064 6046 ITS POLE (55 FT)(90 MPH) EA 9.000 $24,000.000 $19,314.000 $23,871.040
6064 6080 ITS POLE MNT CAB (TY 2)(CONF 1) EA 9.000 $6,200.000 $8,153.000 $5,454.350
6123 6001 ETHERNET SWITCH (INSTALL ONLY) EA 18.000 $400.000 $327.000 $359.330
6185 6002 TMA (STATIONARY) DAY 27.000 $400.000 $345.000 $247.300
6263 6002 BLUETOOTH DETECTION SYSTEM (INSTALL) EA 9.000 $2,500.000 $1,567.000 $1,553.280
Totals: $2,189,203.75 $2,182,973.85 $2,318,868.46