Show Job Controls
Bid Cobra

GONZALES US 183 (0153-02-043)

Items: 46

County: GONZALES
Length: N/A
Highway: US 183
District: YOAKUM
Control Number: 0153-02-043
DBE Goal: N/A
Project: BR 2018(990)
Guaranty: N/A
Time: 171 WORKING DAYS
Engineer's Estimate: $2,347,402.00
Date: 06/05/2018 (8 years ago)
Contract Number: N/A
Type: MISC BRIDGE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,347,402.00
$3,013,760.00
Over/Under Est: 28.39% $666,358.00
$3,137,094.10
Over/Under Est: 33.64% $789,692.10
Amt Left: 4.09% $123,334.10
Over/Under Est: 47.67% $1,119,066.00
Amt Left: 15.02% $452,708.00
Delta: -10.50% -$329,373.90
$3,878,485.00
Over/Under Est: 65.22% $1,531,083.00
Amt Left: 28.69% $864,725.00
Delta: -11.89% -$412,017.00

Bid Items & Bid Tabulations

46 Total 0 of 46
GONZALES  |  US 183  |  YOAKUM  |  0153-02-043  |  06/05/2018  |  $2,347,402.00  |  BR 2018(990)  |  MISC BRIDGE REPAIR  |  171 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CHAMPION INFRASTRUCTURE, LLC
RELMCO, INC.
SCR CIVIL CONSTRUCTION, LLC
RESTEK, INC.
PREPARING ROW
STA 1.000 $3,000.000 $6,500.000 $8,500.000 $8,200.000 $7,500.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 41.000 $50.000 $60.000 $55.000 $206.000 $150.000
BLADING
HR 10.000 $100.000 $120.000 $60.750 $245.000 $300.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 775.000 $2.000 $2.000 $2.250 $1.500 $1.000
VEGETATIVE WATERING
MG 1.000 $100.000 $1,200.000 $675.000 $600.000 $10,000.000
CEM STABIL BKFL
CY 130.000 $175.000 $240.000 $114.140 $350.000 $175.000
FLOWABLE BACKFILL
CY 10.000 $300.000 $260.000 $259.470 $1,500.000 $850.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 386.000 $150.000 $220.000 $80.000 $25.000 $250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 117.000 $250.000 $180.000 $100.000 $323.000 $250.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 541.000 $150.000 $170.000 $150.000 $381.000 $350.000
CLEAN AND PAINT EXIST STR (REF NO. 1)
EA 1.000 $96,000.000 $102,000.000 $101,161.550 $106,000.000 $126,600.000
CLEAN AND PAINT EXIST STR (REF NO. 2)
EA 1.000 $62,000.000 $108,000.000 $109,405.670 $115,000.000 $137,400.000
CLEAN AND PAINT EXIST STR (REF NO. 3)
EA 1.000 $15,000.000 $32,000.000 $34,431.970 $34,000.000 $39,000.000
CLEAN AND PAINT EXIST STR (REF NO. 4)
EA 1.000 $15,000.000 $72,000.000 $76,249.970 $79,100.000 $94,000.000
CLEAN AND PAINT EXIST STR (REF NO. 5)
EA 1.000 $10,500.000 $72,000.000 $76,249.970 $42,000.000 $48,600.000
CLEAN AND PAINT EXIST STR (REF NO. 6)
EA 1.000 $21,000.000 $72,000.000 $76,249.970 $79,100.000 $94,000.000
CLEAN AND PAINT EXIST STR (REF NO. 7)
EA 1.000 $21,000.000 $77,000.000 $76,249.970 $79,100.000 $94,000.000
CLEAN AND PAINT EXIST STR (REF NO. 8)
EA 1.000 $67,500.000 $250,000.000 $237,547.970 $254,000.000 $305,000.000
CLEAN AND PAINT EXIST STR (REF NO. 9)
EA 1.000 $304,000.000 $290,000.000 $58,327.970 $320,000.000 $383,670.000
CLEAN AND PAINT EXIST STR (REF NO. 10)
EA 1.000 $400,000.000 $400,000.000 $297,287.970 $423,000.000 $508,950.000
CLEAN EXIST STR
LS 1.000 $10,000.000 $75,000.000 $392,871.970 $80,100.000 $94,000.000
RETROFIT RAIL (TY T551)
LF 1,950.000 $175.000 $240.000 $105.000 $226.000 $250.000
RAISING EXIST STRUCT
LS 1.000 $130,000.000 $40,000.000 $395,000.000 $94,000.000 $150,000.000
MOBILIZATION
LS 1.000 $200,000.000 $220,000.000 $300,000.000 $346,000.000 $215,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $4,200.000 $6,500.000 $10,000.000 $3,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,950.000 $3.000 $4.000 $6.370 $2.250 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,950.000 $2.000 $2.000 $2.150 $1.000 $5.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 1,020.000 $60.000 $42.000 $40.000 $47.000 $50.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 3,420.000 $30.000 $18.000 $15.000 $12.000 $50.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 1,020.000 $15.000 $15.000 $28.000 $14.000 $50.000
TURNOUTS (SURF TREAT)
SY 390.000 $40.000 $75.000 $55.000 $134.000 $25.000
MTL W-BEAM GD FEN (TIM POST)
LF 700.000 $24.000 $23.000 $65.000 $37.000 $27.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $1,800.000 $1,700.000 $2,835.000 $1,700.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 916.000 $2.000 $2.500 $4.500 $15.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $250.000 $225.000 $1,000.000 $125.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,600.000 $2,600.000 $4,222.500 $2,800.000 $3,250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 10.000 $1,500.000 $2,500.000 $3,000.000 $1,400.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $600.000 $1,800.000 $2,000.000 $1,000.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $9,500.000 $12,500.000 $9,000.000 $2,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $30.000 $40.000 $22.500 $100.000 $50.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 1.000 $2,000.000 $8,500.000 $4,500.000 $5,400.000 $5,000.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.500 $8,000.000 $3,600.000 $20,000.000 $66,000.000 $15,000.000
CNC CRACK REPAIR (DISCRETE)(ROUT)
LF 10.000 $20.000 $120.000 $882.900 $150.000 $150.000
REP STL BRIDGE MEMBER (BEARINGS)
EA 65.000 $1,000.000 $1,400.000 $850.000 $1,450.000 $3,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $18,000.000 $16,875.000 $29,000.000 $10,000.000
TMA (STATIONARY)
EA 1.000 $5,000.000 $36,000.000 $25,000.000 $47,000.000 $20,000.000
Totals: $2,347,402.000 $3,013,760.000 $3,137,094.100 $3,466,468.000 $3,878,485.000