GOLIAD US 183 (0155-02-029)

Items: 174

County: GOLIAD
Length: N/A
Highway: US 183
District: CORPUS CHRISTI
Control Number: 0155-02-029
DBE Goal: N/A
Project: C 155-2-29
Guaranty: N/A
Time: 465 WORKING DAYS
Engineer's Estimate: $22,746,369.99
Date: 11/04/2021 (4 years ago)
Contract Number: N/A
Type: REHABILITATE ROADWAY AND ADD PASSING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$22,746,369.99
$22,867,692.86
Over/Under Est: 0.53% $121,322.87
Over/Under Est: 13.7% $3,115,678.75
Amt Left: 13.09% $2,994,355.88
Over/Under Est: 20.31% $4,619,679.44
Amt Left: 19.67% $4,498,356.57
Delta: -5.82% -$1,504,000.69
$33,296,390.21
Over/Under Est: 46.38% $10,550,020.22
Amt Left: 45.6% $10,428,697.35
Delta: -21.67% -$5,930,340.78
Subcontractor Percentage Amount
LISKA CONSTRUCTION COMPANY, INC. 7.72% $2,014,809.83
ROADWAY SPECIALTIES, INC. 1.96% $511,532.03
HIGHWAY BARRICADES AND SERVICES, LLC 1.00% $260,985.73
ROAD SOLUTIONS L.L.C. 0.56% $146,152.01
JB PINNACLE GROUP, LLC 0.55% $143,542.15
LONE STAR EROSION CONTROL 0.41% $107,004.15
TRAF-TEX, INC. 0.39% $101,784.43
EGGEMEYER LAND CLEARING, LLC 0.37% $96,564.72
HARDY HOLE DRILLING 0.25% $65,246.43
SCR CIVIL CONSTRUCTION, LLC 0.24% $62,636.57
FLASHER EQUIPMENT COMPANY 0.19% $49,587.29
DEPENDABLE FENCE 0.16% $41,757.72
PROFESSIONAL TRAFFIC CONTROL LLC 0.09% $23,488.72
A K FUQUAY CONSTRUCTION 0.08% $20,878.86
PINNACLE GRINDING AND GROOVING LLC 0.06% $15,659.14
SK CONCRETE SERVICES LLC 0.03% $7,829.57
A&J REBAR LLC 0.00% $0.00
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
HB FARMER FOUNDATION, LLC 0.00% $0.00
HERMANOS STEEL, LLC 0.00% $0.00
BEAVER BOYS SERVICES LLC 0.00% $0.00
Total: 14.06% $3,669,459.35

Bid Items & Bid Tabulations

174 Total 0 of 174
GOLIAD  |  US 183  |  CORPUS CHRISTI  |  0155-02-029  |  11/04/2021  |  $22,746,369.99  |  C 155-2-29  |  REHAB ROADWAY AND ADD PASSING LANES  |  465 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
TEXAS MATERIALS GROUP, INC.
FNF CONSTRUCTION, INC.
PREPARING ROW
STA 817.000 $2,000.000 $519.270 $550.000 $665.000 $500.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 86.000 $165.000 $157.500 $158.000 $153.000 $500.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 84.000 $575.000 $420.000 $360.000 $408.000 $1,500.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 36.000 $1,450.000 $840.000 $890.000 $817.000 $3,000.000
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 2.000 $1,800.000 $2,100.000 $3,200.000 $2,050.000 $5,000.000
EXCAVATION (ROADWAY)
CY 20,469.000 $8.000 $11.220 $14.000 $16.500 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 15,748.000 $8.000 $11.220 $10.000 $15.000 $4.000
BACKFILL (TY A OR B)
STA 1,094.000 $130.000 $106.500 $170.000 $150.000 $100.000
BLADING
HR 50.000 $92.000 $96.900 $150.000 $120.000 $150.000
FURNISHING AND PLACING TOPSOIL (4")
SY 42,121.000 $2.000 $1.020 $1.000 $1.000 $0.600
BROADCAST SEED (TEMP) (WARM)
SY 21,061.000 $0.250 $0.170 $0.280 $0.170 $0.300
BROADCAST SEED (TEMP) (COOL)
SY 21,061.000 $0.250 $0.170 $0.280 $0.170 $0.300
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 42,121.000 $0.140 $0.200 $0.280 $0.200 $0.350
VEGETATIVE WATERING
MG 769.000 $13.000 $13.320 $35.000 $23.000 $100.000
PLANT MATERIAL (5 GAL) (TREE)
EA 25.000 $18.000 $150.000 $340.000 $210.000 $50.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 46,805.000 $68.000 $67.280 $91.000 $100.000 $60.000
LIME (HYDRATED LIME (SLURRY))
TON 1,353.000 $192.000 $173.250 $260.000 $232.000 $275.000
LIME TRT (SUBGRADE)(8")
SY 24,616.000 $3.500 $2.050 $5.500 $3.850 $4.000
LIME TRT (SUBGRADE)(12")
SY 28,690.000 $3.000 $3.080 $7.000 $5.300 $4.000
CEMENT
TON 354.000 $160.000 $173.250 $190.000 $179.000 $400.000
CEMENT TREAT (SUBGRADE) (8")
SY 650.000 $2.500 $2.050 $25.000 $10.000 $25.000
CEMENT TREAT (SUBGRADE)(12")
SY 6,646.000 $1.000 $3.080 $6.000 $7.000 $7.500
PRIME COAT (RC-250)
GAL 7,396.000 $3.100 $4.590 $5.000 $4.750 $3.750
ASPH (RC-250)
GAL 65,270.000 $3.600 $4.060 $4.000 $4.500 $3.500
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 143,350.000 $3.300 $3.730 $4.000 $4.000 $4.750
AGGR (TY-B GR-5)
CY 2,147.000 $120.000 $68.080 $92.000 $149.000 $120.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 4,715.000 $80.000 $90.360 $145.000 $114.000 $120.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 53,552.000 $40.000 $32.820 $37.000 $41.000 $52.250
PLANE ASPH CONC PAV(0" TO 3")
SY 2,150.000 $1.600 $2.440 $8.000 $3.900 $2.000
PLANE ASPH CONC PAV (1")
SY 4,674.000 $1.000 $2.440 $3.300 $3.900 $1.000
CEM STABIL BKFL
CY 559.000 $80.000 $190.000 $160.000 $163.000 $230.000
CUT & RESTORING PAV
SY 541.000 $82.000 $110.000 $88.000 $50.000 $140.000
TRENCH EXCAVATION PROTECTION
LF 408.000 $3.000 $10.000 $5.250 $5.000 $7.000
TEMPORARY SPL SHORING
SF 1,142.000 $33.000 $35.000 $45.000 $48.000 $30.000
DRILL SHAFT (18 IN)
LF 120.000 $100.000 $81.610 $140.000 $94.000 $225.000
DRILL SHAFT (36 IN)
LF 520.000 $185.000 $212.070 $230.000 $204.000 $700.000
DRILL SHAFT (60 IN)
LF 1,032.000 $455.000 $590.190 $420.000 $583.000 $1,975.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 72.000 $185.000 $131.000 $140.000 $255.000 $300.000
CL C CONC (ABUT)
CY 60.900 $915.000 $1,200.000 $1,160.000 $1,600.000 $3,000.000
CL C CONC (CAP)
CY 61.200 $1,000.000 $1,200.000 $1,580.000 $1,590.000 $4,000.000
CL C CONC (COLUMN)
CY 45.200 $945.000 $1,000.000 $1,000.000 $1,300.000 $3,000.000
CL C CONC (RAC-R)
CY 40.000 $1,200.000 $1,500.000 $600.000 $1,545.000 $6,000.000
REINF CONC SLAB
SF 15,272.000 $16.000 $20.000 $18.000 $28.500 $55.000
PRESTR CONC GIRDER (TX34)
LF 2,310.000 $130.000 $150.000 $160.000 $151.000 $200.000
RIPRAP (CONC)(5 IN)
CY 151.000 $540.000 $450.000 $415.000 $490.000 $675.000
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 526.600 $190.000 $200.000 $193.000 $185.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 430.000 $515.000 $550.000 $425.000 $460.000 $550.000
RAIL (TY T223)
LF 1,126.000 $100.000 $145.000 $90.000 $118.000 $550.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 138.000 $120.000 $180.000 $140.000 $143.000 $125.000
CONC BOX CULV (3 FT X 2 FT)
LF 162.000 $250.000 $353.360 $320.000 $306.000 $425.000
CONC BOX CULV (4 FT X 2 FT)
LF 70.000 $270.000 $371.730 $340.000 $326.000 $450.000
CONC BOX CULV (4 FT X 4 FT)
LF 67.000 $300.000 $499.780 $405.000 $393.000 $550.000
CONC BOX CULV (5 FT X 4 FT)
LF 589.000 $350.000 $661.290 $470.000 $460.000 $600.000
CONC BOX CULV (6 FT X 5 FT)
LF 87.000 $500.000 $721.660 $630.000 $613.000 $800.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 161.000 $550.000 $598.470 $470.000 $460.000 $650.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 31.000 $600.000 $752.120 $530.000 $510.000 $700.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 74.000 $700.000 $881.480 $580.000 $560.000 $775.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 17.000 $710.000 $1,025.910 $630.000 $613.000 $850.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 59.000 $750.000 $1,031.370 $660.000 $639.000 $875.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 22.000 $800.000 $1,075.190 $700.000 $690.000 $950.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 34.000 $860.000 $1,252.340 $760.000 $740.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 611.000 $60.000 $71.480 $68.000 $66.500 $100.000
RC PIPE (CL III)(30 IN)
LF 75.000 $110.000 $183.710 $105.000 $103.000 $150.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $22,700.000 $13,438.730 $19,000.000 $18,385.000 $25,000.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 18.000 $7,500.000 $4,005.850 $4,750.000 $4,600.000 $6,500.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $6,750.000 $6,308.640 $5,250.000 $5,100.000 $7,000.000
SET (TY I)(S=3 FT)(HW= 5 FT)(4:1)(C)
EA 4.000 $7,500.000 $5,560.280 $5,250.000 $5,100.000 $7,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 8.000 $7,600.000 $4,118.850 $5,800.000 $5,625.000 $8,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 10.000 $7,600.000 $7,026.970 $6,000.000 $5,825.000 $8,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 8.000 $7,700.000 $5,973.550 $5,250.000 $5,100.000 $7,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $7,700.000 $9,569.410 $6,300.000 $6,130.000 $8,500.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $7,700.000 $7,572.580 $6,800.000 $6,640.000 $9,000.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
EA 3.000 $7,800.000 $5,713.380 $6,800.000 $6,640.000 $9,000.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 19.000 $7,800.000 $8,102.760 $5,780.000 $5,620.000 $7,839.340
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 1.000 $8,000.000 $6,011.480 $8,400.000 $8,200.000 $11,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $8,000.000 $8,049.530 $9,450.000 $9,200.000 $12,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $8,200.000 $11,303.820 $10,500.000 $10,200.000 $14,000.000
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C)
EA 2.000 $8,400.000 $8,979.890 $10,500.000 $10,200.000 $14,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 52.000 $1,275.000 $2,464.850 $1,050.000 $1,025.000 $2,000.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,900.000 $2,002.100 $2,680.000 $2,600.000 $2,500.000
CLEAN EXIST CULVERTS
EA 34.000 $2,000.000 $1,426.150 $2,525.000 $2,550.000 $3,500.000
REMOV STR (BOX CULVERT)
EA 3.000 $6,000.000 $3,551.350 $2,625.000 $2,550.000 $4,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $71,000.000 $93,956.040 $78,000.000 $107,000.000 $150,000.000
REMOV STR (PIPE)
EA 27.000 $420.000 $525.750 $525.000 $510.000 $1,000.000
MOBILIZATION
LS 1.000 $1,450,000.000 $1,853,018.310 $2,300,000.000 $2,206,770.000 $3,250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $5,659.000 $2,957.840 $1,925.000 $12,200.000 $30,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 585.000 $26.290 $55.000 $58.000 $26.550 $40.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 60.000 $46.300 $65.000 $70.000 $66.400 $125.000
ROCK FILTER DAMS (REMOVE)
LF 645.000 $10.530 $10.000 $26.000 $10.000 $6.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,092.000 $16.220 $14.000 $22.000 $14.300 $23.000
CONSTRUCTION EXITS (REMOVE)
SY 1,092.000 $3.810 $2.000 $6.000 $2.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,175.000 $2.500 $1.900 $4.000 $1.940 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,175.000 $1.000 $0.750 $1.500 $0.750 $3.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,080.000 $6.000 $5.250 $5.500 $5.350 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,080.000 $1.500 $1.000 $1.500 $1.000 $1.500
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 8.000 $3,712.000 $7,748.290 $4,600.000 $3,610.000 $3,500.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,530.000 $55.000 $23.060 $16.000 $22.000 $40.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,530.000 $13.000 $10.020 $8.000 $5.000 $13.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,530.000 $16.500 $10.560 $14.000 $17.000 $20.000
DRIVEWAYS (ACP)
SY 6,119.000 $42.000 $39.420 $27.000 $33.700 $40.000
DRIVEWAYS (BASE)
SY 2,391.000 $20.000 $13.140 $56.000 $64.800 $60.000
RUMBLE STRIPS (SHOULDER)
LF 158,751.000 $0.180 $0.130 $0.300 $0.140 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 69,709.000 $0.200 $0.130 $0.300 $0.200 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 4,825.000 $20.000 $26.420 $28.000 $29.500 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,600.000 $2,506.540 $2,630.000 $2,700.000 $2,250.000
SHORT RADIUS
LF 130.000 $45.000 $33.660 $36.000 $37.000 $40.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 4.000 $1,150.000 $933.560 $980.000 $915.000 $1,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,310.000 $1,485.870 $1,560.000 $1,490.000 $1,500.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 300.000 $740.000 $27.880 $30.000 $31.400 $35.000
REMOVE METAL BEAM GUARD FENCE
LF 3,775.000 $2.000 $1.500 $1.600 $3.450 $4.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $190.000 $204.730 $215.000 $270.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 36.000 $2,400.000 $3,375.430 $3,555.000 $3,225.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 28.000 $260.000 $204.840 $215.000 $270.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,385.000 $1,500.000 $840.000 $1,000.000 $200.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,300.000 $850.000 $525.000 $495.000 $750.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,500.000 $7,350.000 $8,920.000 $8,865.000 $8,000.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 39.000 $210.000 $229.760 $240.000 $330.000 $400.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 13.000 $575.000 $742.070 $780.000 $560.000 $650.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 9.000 $3,109.000 $3,746.000 $4,000.000 $4,264.000 $5,000.000
CONDT (PVC) (SCH 40) (2")
LF 2,390.000 $8.000 $12.000 $13.000 $9.960 $12.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 150.000 $17.000 $18.590 $20.000 $15.320 $18.000
ELEC CONDR (NO.10) INSULATED
LF 7,620.000 $1.500 $1.290 $1.400 $1.840 $2.200
GROUND BOX TY A (122311)W/APRON
EA 5.000 $656.000 $719.000 $755.000 $919.000 $1,000.000
ELC SRV TY D 120/240 060(NS)SS(N)GC(U)
EA 1.000 $7,770.000 $7,204.000 $7,560.000 $6,587.000 $7,500.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 60.000 $670.000 $744.900 $780.000 $689.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 14.000 $699.000 $890.740 $940.000 $970.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 53.000 $791.000 $807.720 $850.000 $919.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 1.000 $800.000 $996.920 $1,045.000 $1,250.000 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 14.000 $971.000 $895.300 $940.000 $1,225.000 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 8.000 $1,060.000 $984.480 $1,030.000 $1,275.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 3.000 $890.000 $1,149.840 $1,200.000 $1,380.000 $1,600.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 8.000 $880.000 $1,025.380 $1,080.000 $1,330.000 $1,400.000
REMOVE SM RD SN SUP&AM
EA 126.000 $80.000 $85.930 $90.000 $60.000 $75.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $20.000 $20.460 $22.000 $18.350 $20.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 90.000 $27.000 $20.720 $22.000 $18.350 $20.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 40.000 $100.000 $92.890 $98.000 $76.600 $85.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 38.000 $67.000 $98.150 $105.000 $76.600 $85.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 11,020.000 $0.370 $0.300 $0.300 $0.310 $0.350
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 112,917.000 $0.290 $0.280 $0.300 $0.290 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 76,156.000 $0.310 $0.300 $0.300 $0.310 $0.350
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 192.000 $1.680 $3.250 $3.500 $3.320 $180.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 49,594.000 $0.690 $0.340 $0.400 $0.350 $0.400
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 48.000 $9.000 $14.000 $15.000 $14.300 $16.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 50,260.000 $0.710 $0.340 $0.400 $0.350 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 9,551.000 $0.640 $1.410 $1.800 $1.070 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,840.000 $0.550 $1.410 $1.800 $1.070 $2.000
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 1,465.000 $0.900 $0.320 $0.350 $0.330 $0.400
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 240.000 $0.800 $0.650 $0.700 $0.660 $0.750
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 4,585.000 $0.750 $0.650 $0.700 $0.660 $0.750
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 8,641.000 $0.370 $0.320 $0.350 $0.330 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 160,134.000 $0.380 $0.280 $0.300 $0.290 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 6,706.000 $0.390 $0.320 $0.350 $0.330 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 130,006.000 $0.380 $0.290 $0.300 $0.300 $0.350
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 250.000 $15.500 $14.000 $15.000 $14.300 $17.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 35.000 $210.000 $185.000 $195.000 $188.000 $200.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 9.000 $412.500 $450.000 $472.000 $459.000 $500.000
PREFAB PAV MRK TY C (W) (WORD)
EA 35.000 $275.000 $225.000 $236.000 $229.000 $300.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 2,415.000 $13.000 $14.250 $15.000 $14.500 $17.000
PREFAB PAV MRK TY C (Y) (MED NOSE)
EA 1.000 $360.000 $225.000 $235.000 $230.000 $250.000
REFL PAV MRKR TY II-A-A
EA 2,682.000 $4.000 $3.250 $3.400 $3.320 $4.000
REFL PAV MRKR TY II-C-R
EA 672.000 $2.000 $3.250 $3.400 $3.320 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 27,670.000 $0.770 $0.350 $0.400 $0.360 $0.400
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 1,200.000 $70.000 $67.300 $45.000 $46.000 $50.000
REMOVE CENTERLINE TEXTURING
LF 380.000 $3.250 $11.220 $19.000 $14.600 $0.750
D-GR HMA TY-B SAC-B PG64-22
TON 35,247.000 $70.000 $73.620 $84.000 $92.000 $100.000
D-GR HMA TY-D SAC-B PG70-22
TON 46,229.000 $70.000 $87.080 $97.000 $98.000 $107.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 98.000 $160.000 $127.670 $180.000 $160.000 $200.000
TACK COAT
GAL 44,102.000 $3.500 $3.380 $3.300 $3.450 $4.500
GEOGRID BASE REINFORCEMENT (TY II)
SY 210,420.000 $1.300 $1.020 $1.400 $1.400 $1.750
BIRD EXCLUSION METHOD
SF 1,260.000 $10.000 $8.990 $23.000 $8.750 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,370.000 $7,590.870 $34,400.000 $20,000.000 $50,000.000
TMA (STATIONARY)
DAY 802.000 $145.000 $253.030 $180.000 $170.000 $175.000
TMA (MOBILE OPERATION)
HR 488.000 $70.000 $101.210 $56.000 $50.000 $55.000
SOLAR POWERED LED SIGN
EA 1.000 $3,650.000 $6,283.000 $6,600.000 $3,575.000 $4,500.000
Totals: $22,746,369.990 $22,867,692.860 $25,862,048.740 $27,366,049.430 $33,296,390.210