PREPARING ROW
|
STA
|
1,324.000
|
$1,000.000
|
$288.840
|
$300.000
|
$2,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
527.000
|
$50.000
|
$60.150
|
$20.000
|
$50.000
|
|
|
REMOVING STAB BASE & ASPH PAV (10"-12")
|
SY
|
39,942.000
|
$2.000
|
$5.190
|
$6.000
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
96,242.000
|
$14.000
|
$13.390
|
$15.750
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
84,418.000
|
$25.000
|
$9.780
|
$11.750
|
$25.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
1,332.000
|
$110.000
|
$296.120
|
$350.000
|
$250.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
160,336.000
|
$0.200
|
$0.260
|
$0.650
|
$0.500
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
80,168.000
|
$0.120
|
$0.200
|
$0.600
|
$0.250
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
80,168.000
|
$0.120
|
$0.200
|
$0.600
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
2,519.000
|
$20.000
|
$71.500
|
$10.000
|
$25.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
77,194.000
|
$60.000
|
$72.450
|
$53.500
|
$110.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
5,564.000
|
$250.000
|
$270.000
|
$410.000
|
$500.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
262,798.000
|
$6.000
|
$5.000
|
$5.000
|
$4.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
45,201.000
|
$6.000
|
$6.500
|
$6.500
|
$7.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
50,850.000
|
$4.700
|
$4.910
|
$4.750
|
$6.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
2,095.000
|
$120.000
|
$297.610
|
$150.000
|
$200.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
50,850.000
|
$4.000
|
$5.200
|
$5.500
|
$5.500
|
|
|
CEM STABIL BKFL
|
CY
|
223.000
|
$250.000
|
$275.000
|
$300.000
|
$250.000
|
|
|
CUT & RESTORING PAV
|
SY
|
42.000
|
$122.000
|
$330.000
|
$65.000
|
$100.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
21,008.000
|
$24.000
|
$35.710
|
$80.000
|
$20.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
46.000
|
$510.000
|
$621.500
|
$700.000
|
$900.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
102.000
|
$190.000
|
$220.000
|
$200.000
|
$225.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,068.000
|
$85.000
|
$79.200
|
$94.500
|
$150.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,382.000
|
$135.000
|
$203.500
|
$140.000
|
$175.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
12.000
|
$210.000
|
$385.000
|
$275.000
|
$325.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
14.000
|
$9,200.000
|
$11,000.000
|
$15,000.000
|
$20,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
36.000
|
$1,250.000
|
$1,980.000
|
$2,400.000
|
$3,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$2,750.000
|
$2,750.000
|
$3,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$2,140.000
|
$3,300.000
|
$4,000.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,990.000
|
$4,950.000
|
$4,500.000
|
$10,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$2,150.000
|
$3,300.000
|
$3,000.000
|
$4,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,786,000.000
|
$2,555,752.710
|
$3,600,000.000
|
$4,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$9,000.000
|
$14,873.440
|
$65,000.000
|
$30,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,550.000
|
$50.000
|
$67.670
|
$61.100
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,550.000
|
$12.000
|
$26.790
|
$21.600
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
32,976.000
|
$4.000
|
$4.290
|
$5.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
32,976.000
|
$1.000
|
$1.100
|
$1.250
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,180.000
|
$8.000
|
$10.550
|
$7.550
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,180.000
|
$3.000
|
$3.120
|
$1.250
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,073.000
|
$86.000
|
$75.010
|
$75.000
|
$50.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
1,887.000
|
$150.000
|
$116.000
|
$225.000
|
$200.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
12.000
|
$5,850.000
|
$6,296.400
|
$5,500.000
|
$10,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,500.000
|
$85.000
|
$117.000
|
$85.000
|
$125.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
28,260.000
|
$9.000
|
$18.000
|
$4.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,500.000
|
$13.000
|
$28.780
|
$4.000
|
$50.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
293.000
|
$100.000
|
$370.990
|
$215.000
|
$150.000
|
|
|
DRIVEWAYS AND TURNOUTS (SURF TREAT)
|
SY
|
4,780.000
|
$55.000
|
$76.630
|
$55.000
|
$60.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
264,800.000
|
$0.150
|
$0.130
|
$0.150
|
$0.500
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
132,400.000
|
$0.150
|
$0.130
|
$0.150
|
$0.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
42.000
|
$1,400.000
|
$1,470.250
|
$510.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$3,294.870
|
$510.000
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,500.000
|
$9,000.000
|
$7,500.000
|
$20,000.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
2.000
|
$500.000
|
$467.500
|
$270.000
|
$600.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$750.000
|
$720.500
|
$560.000
|
$1,000.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
3.000
|
$380.000
|
$302.500
|
$170.000
|
$400.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
310.000
|
$30.000
|
$22.000
|
$66.000
|
$100.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
770.000
|
$3.000
|
$1.380
|
$5.000
|
$7.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
390.000
|
$3.200
|
$1.650
|
$6.000
|
$8.000
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
1,160.000
|
$2.700
|
$6.600
|
$8.000
|
$11.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,760.000
|
$2,640.000
|
$3,000.000
|
$4,000.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
|
EA
|
2.000
|
$2,800.000
|
$7,150.000
|
$7,000.000
|
$9,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
42.000
|
$700.000
|
$907.500
|
$769.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$940.000
|
$880.000
|
$886.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
12.000
|
$1,240.000
|
$1,039.500
|
$1,216.000
|
$1,300.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
47.000
|
$270.000
|
$566.500
|
$770.000
|
$700.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$800.000
|
$715.000
|
$789.000
|
$1,000.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
46.000
|
$90.000
|
$77.000
|
$78.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
64,190.000
|
$1.000
|
$0.720
|
$1.100
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
336.000
|
$9.100
|
$13.200
|
$14.000
|
$18.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
13,210.000
|
$0.950
|
$0.940
|
$1.100
|
$1.500
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
2,872.000
|
$1.150
|
$1.050
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,406.000
|
$0.850
|
$1.080
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
108.000
|
$6.000
|
$8.800
|
$15.000
|
$20.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
24,004.000
|
$0.160
|
$0.170
|
$0.200
|
$0.250
|
|
REFL PAV MRK TY II (W) 4" (DOT)
|
LF
|
2,872.000
|
$0.500
|
$0.610
|
$0.650
|
$1.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
272,571.000
|
$0.130
|
$0.150
|
$0.170
|
$0.250
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
3,406.000
|
$0.300
|
$0.350
|
$0.500
|
$0.750
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
108.000
|
$5.000
|
$1.320
|
$10.000
|
$13.000
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
70.000
|
$0.130
|
$1.320
|
$2.000
|
$3.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
532,716.000
|
$0.130
|
$0.140
|
$0.170
|
$0.250
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
24,004.000
|
$0.450
|
$0.540
|
$0.590
|
$0.750
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
273,833.000
|
$0.450
|
$0.500
|
$0.540
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
536,440.000
|
$0.450
|
$0.500
|
$0.540
|
$0.750
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
16.000
|
$230.000
|
$286.000
|
$265.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
22.000
|
$400.000
|
$605.000
|
$675.000
|
$1,000.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
16.000
|
$250.000
|
$352.000
|
$365.000
|
$500.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,433.000
|
$3.500
|
$4.400
|
$4.250
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
8,105.000
|
$3.600
|
$4.400
|
$4.250
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
37,360.000
|
$0.400
|
$0.720
|
$0.850
|
$2.000
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
2.000
|
$7,300.000
|
$8,800.000
|
$11,000.000
|
$15,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$6,000.000
|
$5,500.000
|
$16,000.000
|
$20,000.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$280.000
|
$165.000
|
$600.000
|
$800.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$280.000
|
$165.000
|
$600.000
|
$800.000
|
|
|
VEH SIG SEC (12")LED(HOUSING ONLY)
|
EA
|
16.000
|
$350.000
|
$330.000
|
$300.000
|
$400.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
385.000
|
$4.500
|
$4.950
|
$10.000
|
$13.000
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
3.000
|
$12,000.000
|
$15,400.000
|
$15,000.000
|
$20,000.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$5,000.000
|
$12,807.960
|
$10,125.000
|
$10,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$2,000.000
|
$16,018.870
|
$12,075.000
|
$10,000.000
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
38,660.000
|
$130.000
|
$140.000
|
$174.000
|
$185.000
|
|
|
TACK COAT
|
GAL
|
30,364.000
|
$3.900
|
$4.760
|
$6.000
|
$5.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
31,937.000
|
$150.000
|
$181.650
|
$224.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
826.000
|
$80.000
|
$126.560
|
$90.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
413.000
|
$200.000
|
$400.170
|
$535.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
70.000
|
$150.000
|
$565.550
|
$950.000
|
$700.000
|
|
Totals: |
$30,745,794.620
|
$32,993,650.710
|
$38,267,177.670
|
$48,158,887.000
|