Job Info for 0463-04-026

County: GLASSCOCK Highway: SH 158 Date: 07/11/2018 (6 years ago) Engineer's Estimate: $19,682,228 Control Number: 0463-04-026
Project: NH 1802(312) District: SAN ANGELO Time: 217 WORKING DAYS Type: ACP OVERLAY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $19,682,227.84
RK HALL, LLC   $20,119,919.30 1
2.22% | $437,691.46
REECE ALBERT, INC.   $21,266,003.25 2
8.05% | $1,583,775.41
5.7% | $1,146,083.95
KIEWIT INFRASTRUCTURE SOUTH CO.   $21,415,156.50 3
8.8% | $1,732,928.66
6.44% | $1,295,237.20
0.70% | $149,153.25
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY   $24,441,374.14 4
24.18% | $4,759,146.30
21.48% | $4,321,454.84
14.13% | $3,026,217.64
DELHUR INDUSTRIES, INC.   $26,990,435.23 5
37.13% | $7,308,207.39
34.15% | $6,870,515.93
10.43% | $2,549,061.09

Bid Items

Items: 58, 0 filtered
GLASSCOCK SH 158  |  SAN ANGELO  |  0463-04-026  |  07/11/2018  |  $19,682,228  |  NH 1802(312)  |  ACP OVERLAY  |  217 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate RK HALL, LLC REECE ALBERT, INC. KIEWIT INFRASTRUCTURE SOUTH CO. JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY DELHUR INDUSTRIES, INC.
104 6011 REMOVING CONC (MEDIANS) SY 54.000 $18.000 $101.510 $16.840 $75.000 $20.000 $120.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 3,778.000 $10.000 $12.000 $10.790 $10.860 $8.000 $11.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 24.000 $460.000 $1,742.730 $1,953.560 $1,800.000 $1,580.000 $600.000
134 6002 BACKFILL (TY B) STA 2,135.600 $200.000 $114.310 $153.900 $100.000 $70.000 $120.000
134 6004 BACKFILL (TY A OR B) STA 185.300 $240.000 $141.240 $165.360 $100.000 $73.000 $300.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 4,983.000 $0.250 $0.790 $0.810 $0.320 $0.350 $0.860
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 4,983.000 $5.000 $1.520 $1.560 $2.500 $3.000 $2.750
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 1,036.000 $42.000 $67.240 $69.100 $30.000 $100.000 $72.000
310 6001 PRIME COAT (MULTI OPTION) GAL 466.000 $4.250 $6.240 $6.210 $4.020 $8.000 $6.880
314 6009 EMULS ASPH (EROSN CONT)(MULTI) GAL 6,628.000 $4.000 $13.850 $3.530 $2.910 $3.000 $4.130
315 6004 FOG SEAL (CSS-1H) GAL 29,711.000 $3.500 $3.070 $3.030 $2.900 $4.000 $4.130
316 6001 ASPH (MULTI OPTION) GAL 956.000 $3.000 $4.920 $5.000 $4.480 $6.000 $8.530
316 6238 AGGR(TY-PD GR-3 SAC-B) CY 25.000 $100.000 $376.410 $453.020 $540.960 $200.000 $440.000
344 6120 SUPERPAVE MIXTURES SP-D SAC-B PG70-22 TON 218,658.000 $73.000 $77.320 $82.640 $81.000 $88.750 $104.010
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 5,901.000 $50.000 $59.900 $55.520 $68.320 $70.000 $54.510
351 6012 FLEXIBLE PAVEMENT STRUCTURE REPAIR(2") SY 5,901.000 $20.000 $16.050 $19.450 $19.280 $25.000 $35.200
354 6020 PLANE ASPH CONC PAV(0" TO 1") SY 8,049.000 $2.500 $9.910 $2.890 $1.800 $3.890 $2.850
354 6045 PLANE ASPH CONC PAV (2") SY 57,729.000 $1.250 $3.010 $2.090 $2.000 $4.760 $2.450
432 6002 RIPRAP (CONC)(5 IN) CY 5.000 $550.000 $1,942.330 $886.350 $3,000.000 $8,730.770 $900.000
460 6010 CMP AR (GAL STL DES 3) LF 56.000 $80.000 $113.760 $89.880 $75.000 $99.650 $120.000
467 6537 SET (TY II) (DES 3) (CMP) (6: 1) (P) EA 2.000 $950.000 $2,219.930 $1,901.500 $2,500.000 $1,245.070 $1,800.000
496 6050 REMOV STR (DRIVEWAY CULVERT) EA 1.000 $300.000 $1,670.960 $1,284.300 $1,500.000 $1,457.600 $1,200.000
500 6001 MOBILIZATION LS 1.000 $1,030,000.000 $199,466.520 $246,344.440 $821,869.000 $1,000,000.000 $963,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 13.000 $9,000.000 $15,000.000 $9,214.870 $25,000.000 $5,000.000 $35,770.600
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 40.000 $4.000 $12.730 $11.140 $5.820 $6.000 $12.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 40.000 $4.000 $4.290 $7.900 $16.290 $1.000 $2.400
530 6006 DRIVEWAYS (SURF TREAT) SY 240.000 $4.750 $35.540 $30.210 $50.000 $35.000 $36.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 464,858.000 $0.160 $0.090 $0.120 $0.120 $0.300 $0.080
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 229,995.000 $0.180 $0.090 $0.170 $0.170 $0.500 $0.100
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 6,262.500 $25.000 $23.890 $27.520 $27.700 $21.000 $28.050
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,200.000 $1,102.500 $1,133.140 $1,140.620 $300.000 $1,155.000
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 1.000 $1,500.000 $1,155.000 $1,187.100 $1,194.930 $2,500.000 $1,210.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,635.000 $3.000 $2.100 $2.160 $2.170 $4.000 $2.200
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 42.000 $2,500.000 $2,782.500 $2,994.730 $3,014.480 $2,500.000 $3,052.500
658 6015 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 EA 336.000 $30.000 $31.500 $21.580 $21.730 $25.000 $22.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 37,365.000 $1.500 $1.820 $1.630 $2.170 $1.000 $1.660
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 50,056.000 $1.500 $1.310 $1.660 $2.170 $1.000 $1.700
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 4,879.000 $1.000 $0.550 $0.760 $0.560 $0.650 $0.570
666 6137 REFL PAV MRK TY I (Y)8"(SLD)(090MIL) LF 1,254.000 $1.000 $0.550 $0.760 $0.560 $0.650 $0.570
666 6178 REFL PAV MRK TY II (W) 8" (SLD) LF 4,879.000 $0.200 $0.270 $0.380 $0.280 $1.000 $0.290
666 6211 REFL PAV MRK TY II (Y) 8" (SLD) LF 1,254.000 $0.200 $0.270 $0.270 $0.280 $1.000 $0.290
666 6299 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 116,560.000 $0.260 $0.270 $0.320 $0.280 $0.450 $0.290
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 466,147.000 $0.260 $0.270 $0.300 $0.280 $0.450 $0.290
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 764,304.000 $0.260 $0.270 $0.290 $0.280 $0.450 $0.290
666 6322 RE PM W/RET REQ TY II (W) 4" (BRK) LF 116,280.000 $0.150 $0.130 $0.140 $0.130 $0.450 $0.130
666 6323 RE PM W/RET REQ TY II (W) 4" (SLD) LF 472,614.000 $0.100 $0.130 $0.120 $0.130 $0.450 $0.130
666 6327 RE PM W/RET REQ TY II (Y) 4" (SLD) LF 762,111.000 $0.100 $0.130 $0.120 $0.130 $0.450 $0.130
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 4.000 $240.000 $420.000 $237.420 $434.520 $200.000 $440.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 4.000 $275.000 $603.750 $269.800 $624.620 $250.000 $632.500
672 6006 REFL PAV MRKR TY I-A EA 62.000 $3.000 $3.150 $3.780 $3.260 $4.000 $3.300
672 6007 REFL PAV MRKR TY I-C EA 6,005.000 $3.000 $3.050 $2.700 $3.150 $4.000 $3.190
672 6009 REFL PAV MRKR TY II-A-A EA 12,195.000 $3.000 $3.050 $2.700 $3.150 $4.000 $3.190
672 6010 REFL PAV MRKR TY II-C-R EA 62.000 $3.000 $3.150 $3.780 $3.260 $4.000 $3.300
730 6107 FULL - WIDTH MOWING CYC 6.000 $8,000.000 $20,252.460 $25,285.270 $3,000.000 $12,000.000 $18,000.000
734 6002 LITTER REMOVAL CYC 6.000 $8,000.000 $14,697.130 $14,601.350 $2,000.000 $12,000.000 $12,000.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 736.000 $95.000 $100.950 $41.550 $53.130 $165.000 $90.000
6185 6002 TMA (STATIONARY) DAY 368.000 $180.000 $117.660 $241.260 $175.940 $800.000 $26.400
6185 6003 TMA (MOBILE OPERATION) HR 380.000 $20.000 $67.490 $56.120 $62.350 $200.000 $108.000
Totals: $19,682,227.84 $20,119,919.31 $21,266,003.26 $21,415,156.50 $24,441,374.14 $26,990,435.24