Show Job Controls
Bid Cobra

GARZA US0084 (6324-59-001)

Items: 37

County: GARZA
Length: N/A
Highway: US0084
District: LUBBOCK
Control Number: 6324-59-001
DBE Goal: N/A
Project: BPM - 632459001
Guaranty: N/A
Time: 60 W
Engineer's Estimate: $633,243.50
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$633,243.50
$833,015.00
Over/Under Est: 31.55% $199,771.50
Over/Under Est: 53.49% $338,712.20
Amt Left: 16.68% $138,940.70

Bid Items & Bid Tabulations

37 Total 0 of 37
GARZA  |  US0084  |  LUBBOCK  |  6324-59-001  |  06/06/2018  |  $633,243.50  |  BPM - 632459001  |  BRIDGE MAINT  |  60 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
GILVIN-TERRILL, LTD.
REMOVING CONC (MISC)
SY 43.600 $20.000 $50.000 $50.000
BACKFILL (TY B)
STA 5.000 $150.000 $1,000.000 $750.000
D-GR HMA TY-D SAC-B PG70-28
TON 229.000 $250.000 $200.000 $200.000
CL C CONC (RAC-R)(HPC)
CY 85.500 $500.000 $1,200.000 $2,000.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 196.900 $200.000 $150.000 $150.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 690.000 $150.000 $125.000 $175.000
CONC STR REPAIR (STANDARD)
SF 275.000 $150.000 $100.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 167.800 $425.000 $600.000 $600.000
RAIL (TY T223)
LF 87.500 $125.000 $200.000 $450.000
RETROFIT RAIL (TY T631)
LF 409.400 $85.000 $150.000 $58.000
GABIONS (3' X 3')(GALV)
CY 64.000 $205.000 $200.000 $400.000
GABION (1.5' X 3')(GALV)
CY 9.000 $250.000 $250.000 $400.000
CLEAN EXIST CULVERTS
EA 1.000 $1,500.000 $5,000.000 $10,000.000
REMOVE STR (RAIL)
LF 87.500 $50.000 $20.000 $50.000
MOBILIZATION
LS 1.000 $35,000.000 $80,000.000 $97,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,000.000 $7,500.000 $17,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 65.000 $5.000 $10.000 $10.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 300.000 $35.000 $125.000 $100.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 300.000 $7.500 $20.000 $20.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 300.000 $10.000 $20.000 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,050.000 $25.000 $40.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,500.000 $1,550.000
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $1,000.000 $1,500.000 $1,799.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,000.000 $1,000.000 $800.000
REMOVE METAL BEAM GUARD FENCE
LF 2,250.000 $3.000 $5.000 $1.750
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 16.000 $100.000 $50.000 $100.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 16.000 $2,250.000 $2,000.000 $2,200.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $10,000.000 $5,000.000 $9,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,500.000 $2,000.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $750.000 $2,000.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF(BI)
EA 42.000 $50.000 $50.000 $120.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 6.000 $25.000 $50.000 $22.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 24.000 $65.000 $50.000 $70.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $30.000 $50.000 $120.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 30.000 $1.000 $2.000 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,200.000 $0.500 $4.000 $3.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,200.000 $0.500 $4.000 $3.500
Totals: $633,243.500 $833,015.000 $971,955.700