GALVESTON SH0146 (6430-54-001)

Items: 28

County: GALVESTON
Length: N/A
Highway: SH0146
District: HOUSTON
Control Number: 6430-54-001
DBE Goal: N/A
Project: RMC - 643054001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $406,886.59
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
DAVID LAZARO
JOEL CLARKE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$406,886.59
$489,130.00
Over/Under Est: 20.21% $82,243.41
$493,188.00
Over/Under Est: 21.21% $86,301.41
Amt Left: 0.83% $4,058.00
Over/Under Est: 23.62% $96,103.41
Amt Left: 2.83% $13,860.00
Delta: -1.99% -$9,802.00

Bid Items & Bid Tabulations

28 Total 0 of 28
GALVESTON  |  SH0146  |  HOUSTON  |  6430-54-001  |  04/05/2023  |  $406,886.59  |  RMC - 643054001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
RHINO EQUITY, LLC
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
RIPRAP (MOW STRIP)(4 IN)
CY 150.000 $458.810 $420.000 $250.000 $550.000
MOBILIZATION (CALLOUT)
EA 15.000 $641.280 $1,000.000 $1,000.000 $1,000.000
MOBILIZATION (EMERGENCY)
EA 5.000 $496.870 $1,500.000 $1.000 $1,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $20.250 $22.500 $35.000 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,107.110 $2,150.000 $1,800.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,118.560 $1,400.000 $900.000 $1,500.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 200.000 $42.880 $30.000 $60.000 $75.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $1.580 $3.000 $1.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $139.960 $250.000 $1.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,758.520 $2,750.000 $3,500.000 $3,500.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 10.000 $514.160 $250.000 $1.000 $550.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 50.000 $44.840 $3.000 $15.000 $40.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 50.000 $22.190 $20.000 $15.000 $15.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $16.420 $35.000 $20.000 $20.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 12.600 $24.210 $50.000 $50.000 $150.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 500.000 $15.890 $30.000 $35.000 $25.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 250.000 $48.810 $80.000 $40.000 $65.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 100.000 $47.480 $120.000 $50.000 $120.000
REALIGN POSTS
EA 80.000 $14.990 $10.000 $8.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,000.000 $19.830 $60.000 $30.000 $35.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $64.970 $80.000 $95.000 $93.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 45.000 $2,747.710 $2,000.000 $3,500.000 $2,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $914.020 $1,300.000 $1,000.000 $1,250.000
REM & RESET SGT IMPACT HEAD
EA 25.000 $94.610 $150.000 $100.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $78.600 $100.000 $20.000 $100.000
REPLACE SGT STRUT
EA 10.000 $52.200 $100.000 $20.000 $80.000
REPAIR (TRACC)
LF 10.000 $91.960 $350.000 $150.000 $100.000
TMA (STATIONARY)
DAY 100.000 $104.820 $1.000 $500.000 $100.000
Totals: $406,886.586 $489,130.000 $493,188.000 $502,990.000