GALVESTON FM 2004 (2523-01-026)

Items: 102

County: GALVESTON
Length: N/A
Highway: FM 2004
District: HOUSTON
Control Number: 2523-01-026
DBE Goal: N/A
Project: C 2523-1-26
Guaranty: N/A
Time: 201 WORKING DAYS
Engineer's Estimate: $7,104,632.84
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: WIDEN SLDRS, ADD PASSING LN, LEVEL UP & SUPER PAVE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$7,104,632.84
$7,147,856.63
Over/Under Est: 0.61% $43,223.79
Over/Under Est: 3.68% $261,658.50
Amt Left: 3.06% $218,434.71
Subcontractor Percentage Amount
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 6.11% $448,963.53
STRIPE LINES, INC. 2.04% $149,899.44
TRAFFIC SIGNS & LINES, LLC 1.12% $82,297.73
HIGHWAY 1 LLC 0.16% $11,756.82
WEST TEXAS ROCK RESOURCES, LLC 0.15% $11,022.02
RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC 0.07% $5,143.61
Total: 9.65% $709,083.15

Bid Items & Bid Tabulations

102 Total 0 of 102
GALVESTON  |  FM 2004  |  HOUSTON  |  2523-01-026  |  08/04/2021  |  $7,104,632.84  |  C 2523-1-26  |  WIDEN SLDRS, ADD PASSING LN, LEVEL U...  |  201 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
DURWOOD GREENE CONSTRUCTION CO.
REMOVING CONC (SIDEWALKS)
SY 41.100 $5.130 $42.000 $40.000
EXCAVATION (SPECIAL)
CY 25.000 $7.890 $26.000 $60.000
SUBGRADE WIDENING (ORD COMP)
STA 352.480 $300.000 $600.000 $1,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 5,810.000 $8.580 $14.500 $20.000
BACKFILL (TY B)
STA 11.100 $200.000 $750.000 $500.000
BLOCK SODDING
SY 149,802.000 $2.420 $2.800 $1.000
FERTILIZER
AC 3.440 $640.710 $610.000 $850.000
VEGETATIVE WATERING
MG 412.680 $16.270 $9.000 $20.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
SY 28,648.000 $27.540 $22.000 $20.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 26,553.000 $69.960 $76.000 $80.000
ASPH (MULTI OPTION)
GAL 67,270.000 $2.840 $2.900 $3.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 1,617.000 $114.620 $160.000 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 750.000 $65.690 $87.000 $60.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 750.000 $30.200 $37.000 $42.000
PLAN & TEXT CONC PAV(0" TO 1-1/2")
SY 1,089.000 $5.250 $6.700 $5.000
PLANE ASPH CONC PAV (1.5")
SY 138,501.000 $2.000 $1.000 $1.650
CEM STABIL BKFL
CY 630.950 $45.000 $38.000 $65.000
CUT AND RESTORE PAV (FLEX BASE)
SY 457.000 $40.000 $160.000 $100.000
TRENCH EXCAVATION PROTECTION
LF 218.000 $4.000 $5.600 $15.000
RIPRAP (MOW STRIP)(4 IN)
CY 19.710 $471.020 $620.000 $850.000
CONC BOX CULV (5 FT X 3 FT)
LF 42.000 $280.000 $420.000 $650.000
CONC BOX CULV (5 FT X 4 FT)
LF 52.000 $330.000 $450.000 $690.000
RC PIPE (CL III)(18 IN)
LF 18.000 $62.000 $66.000 $220.000
RC PIPE (CL III)(24 IN)
LF 246.000 $72.000 $75.000 $165.000
RC PIPE (CL III)(30 IN)
LF 58.000 $110.000 $92.000 $280.000
WINGWALL (FW - 0) (HW=4 FT)
EA 2.000 $12,000.000 $7,600.000 $12,000.000
WINGWALL (FW - 0) (HW=5 FT)
EA 2.000 $14,000.000 $13,000.000 $19,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $7,700.000 $3,100.000 $3,200.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 74.000 $1,100.000 $1,070.000 $1,150.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,500.000 $1,100.000 $1,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 4.000 $1,600.000 $1,300.000 $1,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 107.000 $1,550.000 $1,300.000 $1,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 5.000 $3,000.000 $2,700.000 $3,300.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $3,100.000 $2,900.000 $3,300.000
REMOV & RE - LAY PIPE (18 IN)
LF 36.000 $33.000 $75.000 $135.000
REMOV & RE - LAY PIPE (24 IN)
LF 746.000 $37.000 $82.000 $115.000
REMOV & RE - LAY PIPE (30 IN)
LF 40.000 $43.000 $95.000 $220.000
REMOV STR (SET)
EA 20.000 $500.000 $500.000 $600.000
REMOV STR (WINGWALL)
EA 3.000 $2,200.000 $1,100.000 $1,400.000
REMOV STR (PIPE)
LF 182.000 $18.000 $18.500 $20.000
REMOV STR (BOX CULVERT)
LF 16.000 $60.000 $34.000 $40.000
MOBILIZATION
LS 1.000 $631,000.000 $285,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $1,500.000 $3,200.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 230.000 $40.000 $52.000 $85.000
ROCK FILTER DAMS (REMOVE)
LF 230.000 $8.600 $11.000 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,775.000 $2.490 $4.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,775.000 $0.670 $0.550 $1.000
DRIVEWAYS (ACP)
SY 68.000 $40.000 $115.000 $55.000
DRIVEWAYS (BASE)
SY 389.000 $20.000 $29.000 $18.000
CONC SIDEWALKS (4")
SY 41.100 $36.270 $175.000 $450.000
RUMBLE STRIPS (SHOULDER)
LF 75,311.000 $0.210 $0.110 $0.230
RUMBLE STRIPS (CENTERLINE)
LF 35,983.000 $0.590 $0.110 $0.240
MTL W-BEAM GD FEN (TIM POST)
LF 125.000 $19.640 $28.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,779.000 $1,900.000 $2,300.000
REMOVE METAL BEAM GUARD FENCE
LF 167.500 $2.970 $2.300 $4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,649.000 $3,000.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $329.000 $300.000 $350.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 4.000 $214.020 $240.000 $250.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 3.000 $269.000 $250.000 $350.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 4.000 $512.360 $520.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 82.000 $450.000 $440.000 $525.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $571.000 $540.000 $575.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $700.000 $650.000 $800.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $676.000 $975.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $700.000 $770.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $815.000 $850.000 $1,200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 9.000 $31.000 $36.000 $45.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 19.000 $30.000 $70.000 $90.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 8,718.000 $0.250 $0.250 $0.230
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 900.000 $1.080 $0.250 $0.240
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 225,933.000 $0.230 $0.250 $0.220
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 9,510.000 $0.510 $0.360 $0.350
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 900.000 $0.960 $0.760 $0.750
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 900.000 $2.200 $1.300 $1.250
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 26,856.000 $0.260 $0.250 $0.050
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 93,360.000 $0.240 $0.250 $0.220
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 300.000 $1.110 $0.430 $0.420
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,170.000 $0.950 $0.870 $0.850
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 300.000 $3.140 $2.950 $2.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 300.000 $6.600 $6.100 $6.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 2,906.000 $0.700 $0.550 $0.550
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,906.000 $0.520 $0.420 $0.400
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 75,311.000 $0.480 $0.420 $0.400
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 8,952.000 $0.490 $0.420 $0.400
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 31,120.000 $0.510 $0.420 $0.400
PREFAB PAV MRK TY C (W) (ARROW)
EA 30.000 $249.000 $190.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 27.000 $270.000 $220.000 $220.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 4.000 $575.000 $460.000 $450.000
REFL PAV MRKR TY I-C
EA 180.000 $4.450 $4.100 $4.000
REFL PAV MRKR TY II-A-A
EA 180.000 $4.320 $4.100 $4.000
PAV SURF PREP FOR MRK (6")
LF 118,589.000 $0.050 $0.010 $0.010
PAV SURF PREP FOR MRK (8")
LF 3,170.000 $0.090 $0.010 $0.010
PAV SURF PREP FOR MRK (12")
LF 300.000 $0.160 $0.050 $0.050
PAV SURF PREP FOR MRK (24")
LF 300.000 $0.280 $0.050 $0.050
PAV SURF PREP FOR MRK (ARROW)
EA 60.000 $10.970 $2.550 $2.500
PAV SURF PREP FOR MRK (WORD)
EA 27.000 $13.200 $2.550 $2.500
PAV SURF PREP FOR MRK (RR XING)
EA 4.000 $13.430 $10.100 $10.000
SP MIXES SP-D PG70-22
TON 3,508.000 $100.000 $100.000 $100.000
SP MIXES SP-D SAC-A PG70-22
TON 15,766.000 $80.000 $98.000 $100.000
TACK COAT
GAL 2,566.000 $1.890 $2.800 $5.000
TMA (STATIONARY)
DAY 27.000 $200.000 $155.000 $450.000
TMA (MOBILE OPERATION)
DAY 9.000 $470.000 $155.000 $450.000
Totals: $7,104,632.835 $7,147,856.630 $7,366,291.340