Job Info for 2523-01-026

County: GALVESTON Highway: FM 2004 Date: 08/04/2021 (3 years ago) Engineer's Estimate: $7,104,633 Control Number: 2523-01-026
Project: C 2523-1-26 District: HOUSTON Time: 201 WORKING DAYS Type: WIDEN SLDRS, ADD PASSING LN, LEVEL UP & SUPER PAVE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $7,104,632.84
TEXAS MATERIALS GROUP, INC.   $7,147,856.63 1
0.61% | $43,223.79
DURWOOD GREENE CONSTRUCTION CO.   $7,366,291.34 2
3.68% | $261,658.50
3.06% | $218,434.71
Subcontractor Percentage Amount
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 6.27% $448,170.61
STRIPE LINES, INC. 2.09% $149,390.20
TRAFFIC SIGNS & LINES, LLC 1.14% $81,485.57
HIGHWAY 1 LLC 0.16% $11,436.57
WEST TEXAS ROCK RESOURCES, LLC 0.15% $10,721.78
RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC 0.06% $4,288.71
Total: 9.87% $705,493.44

Bid Items

Items: 102, 0 filtered
GALVESTON FM 2004  |  HOUSTON  |  2523-01-026  |  08/04/2021  |  $7,104,633  |  C 2523-1-26  |  WIDEN SLDRS, ADD PASSING LN, LEVEL UP & SUPER PAVE  |  201 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TEXAS MATERIALS GROUP, INC. DURWOOD GREENE CONSTRUCTION CO.
104 6015 REMOVING CONC (SIDEWALKS) SY 41.100 $5.130 $42.000 $40.000
110 6003 EXCAVATION (SPECIAL) CY 25.000 $7.890 $26.000 $60.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 352.480 $300.000 $600.000 $1,000.000
132 6007 EMBANKMENT (FINAL)(ORD COMP)(TY D) CY 5,810.000 $8.580 $14.500 $20.000
134 6002 BACKFILL (TY B) STA 11.100 $200.000 $750.000 $500.000
162 6002 BLOCK SODDING SY 149,802.000 $2.420 $2.800 $1.000
166 6001 FERTILIZER AC 3.440 $640.710 $610.000 $850.000
168 6001 VEGETATIVE WATERING MG 412.680 $16.270 $9.000 $20.000
247 6231 FL BS (CMP IN PLACE)(TY A GR 1-2)(10") SY 28,648.000 $27.540 $22.000 $20.000
292 6002 ASPHALT STAB BASE (GR 2)(PG 64) TON 26,553.000 $69.960 $76.000 $80.000
316 6001 ASPH (MULTI OPTION) GAL 67,270.000 $2.840 $2.900 $3.000
316 6434 AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B) CY 1,617.000 $114.620 $160.000 $125.000
351 6008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 750.000 $65.690 $87.000 $60.000
351 6013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 750.000 $30.200 $37.000 $42.000
354 6016 PLAN & TEXT CONC PAV(0" TO 1-1/2") SY 1,089.000 $5.250 $6.700 $5.000
354 6041 PLANE ASPH CONC PAV (1.5") SY 138,501.000 $2.000 $1.000 $1.650
400 6005 CEM STABIL BKFL CY 630.950 $45.000 $38.000 $65.000
400 6012 CUT AND RESTORE PAV (FLEX BASE) SY 457.000 $40.000 $160.000 $100.000
402 6001 TRENCH EXCAVATION PROTECTION LF 218.000 $4.000 $5.600 $15.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 19.710 $471.020 $620.000 $850.000
462 6007 CONC BOX CULV (5 FT X 3 FT) LF 42.000 $280.000 $420.000 $650.000
462 6008 CONC BOX CULV (5 FT X 4 FT) LF 52.000 $330.000 $450.000 $690.000
464 6003 RC PIPE (CL III)(18 IN) LF 18.000 $62.000 $66.000 $220.000
464 6005 RC PIPE (CL III)(24 IN) LF 246.000 $72.000 $75.000 $165.000
464 6007 RC PIPE (CL III)(30 IN) LF 58.000 $110.000 $92.000 $280.000
466 6151 WINGWALL (FW - 0) (HW=4 FT) EA 2.000 $12,000.000 $7,600.000 $12,000.000
466 6152 WINGWALL (FW - 0) (HW=5 FT) EA 2.000 $14,000.000 $13,000.000 $19,000.000
467 6171 SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C) EA 2.000 $7,700.000 $3,100.000 $3,200.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 74.000 $1,100.000 $1,070.000 $1,150.000
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 2.000 $1,500.000 $1,100.000 $1,400.000
467 6394 SET (TY II) (24 IN) (RCP) (6: 1) (C) EA 4.000 $1,600.000 $1,300.000 $1,500.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 107.000 $1,550.000 $1,300.000 $1,500.000
467 6422 SET (TY II) (30 IN) (RCP) (6: 1) (C) EA 5.000 $3,000.000 $2,700.000 $3,300.000
467 6423 SET (TY II) (30 IN) (RCP) (6: 1) (P) EA 4.000 $3,100.000 $2,900.000 $3,300.000
472 6004 REMOV & RE - LAY PIPE (18 IN) LF 36.000 $33.000 $75.000 $135.000
472 6006 REMOV & RE - LAY PIPE (24 IN) LF 746.000 $37.000 $82.000 $115.000
472 6008 REMOV & RE - LAY PIPE (30 IN) LF 40.000 $43.000 $95.000 $220.000
496 6004 REMOV STR (SET) EA 20.000 $500.000 $500.000 $600.000
496 6005 REMOV STR (WINGWALL) EA 3.000 $2,200.000 $1,100.000 $1,400.000
496 6007 REMOV STR (PIPE) LF 182.000 $18.000 $18.500 $20.000
496 6008 REMOV STR (BOX CULVERT) LF 16.000 $60.000 $34.000 $40.000
500 6001 MOBILIZATION LS 1.000 $631,000.000 $285,000.000 $300,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 $10,000.000 $1,500.000 $3,200.000
506 6004 ROCK FILTER DAMS (INSTALL) (TY 4) LF 230.000 $40.000 $52.000 $85.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 230.000 $8.600 $11.000 $7.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,775.000 $2.490 $4.000 $3.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,775.000 $0.670 $0.550 $1.000
530 6005 DRIVEWAYS (ACP) SY 68.000 $40.000 $115.000 $55.000
530 6016 DRIVEWAYS (BASE) SY 389.000 $20.000 $29.000 $18.000
531 6001 CONC SIDEWALKS (4") SY 41.100 $36.270 $175.000 $450.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 75,311.000 $0.210 $0.110 $0.230
533 6002 RUMBLE STRIPS (CENTERLINE) LF 35,983.000 $0.590 $0.110 $0.240
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 125.000 $19.640 $28.000 $32.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 3.000 $1,779.000 $1,900.000 $2,300.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 167.500 $2.970 $2.300 $4.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 3.000 $2,649.000 $3,000.000 $3,200.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 3.000 $329.000 $300.000 $350.000
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 4.000 $214.020 $240.000 $250.000
560 6012 MAILBOX INSTALL-D (TWW-POST) TY 4 EA 3.000 $269.000 $250.000 $350.000
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 4.000 $512.360 $520.000 $600.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 82.000 $450.000 $440.000 $525.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 16.000 $571.000 $540.000 $575.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $700.000 $650.000 $800.000
644 6017 IN SM RD SN SUP&AM TY10BWG(2)SA(P) EA 1.000 $676.000 $975.000 $1,100.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 7.000 $700.000 $770.000 $850.000
644 6034 IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) EA 2.000 $815.000 $850.000 $1,200.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 9.000 $31.000 $36.000 $45.000
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 19.000 $30.000 $70.000 $90.000
662 6005 WK ZN PAV MRK NON-REMOV (W)6"(BRK) LF 8,718.000 $0.250 $0.250 $0.230
662 6006 WK ZN PAV MRK NON-REMOV (W)6"(DOT) LF 900.000 $1.080 $0.250 $0.240
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 225,933.000 $0.230 $0.250 $0.220
662 6012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF 9,510.000 $0.510 $0.360 $0.350
662 6014 WK ZN PAV MRK NON-REMOV (W)12"(SLD) LF 900.000 $0.960 $0.760 $0.750
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 900.000 $2.200 $1.300 $1.250
662 6035 WK ZN PAV MRK NON-REMOV (Y)6"(BRK) LF 26,856.000 $0.260 $0.250 $0.050
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 93,360.000 $0.240 $0.250 $0.220
666 6018 REFL PAV MRK TY I (W)6"(DOT)(100MIL) LF 300.000 $1.110 $0.430 $0.420
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 3,170.000 $0.950 $0.870 $0.850
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 300.000 $3.140 $2.950 $2.900
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 300.000 $6.600 $6.100 $6.000
666 6162 RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL) LF 2,906.000 $0.700 $0.550 $0.550
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 2,906.000 $0.520 $0.420 $0.400
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 75,311.000 $0.480 $0.420 $0.400
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 8,952.000 $0.490 $0.420 $0.400
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 31,120.000 $0.510 $0.420 $0.400
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 30.000 $249.000 $190.000 $200.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 27.000 $270.000 $220.000 $220.000
668 6089 PREFAB PAV MRK TY C (W) (RR XING) EA 4.000 $575.000 $460.000 $450.000
672 6007 REFL PAV MRKR TY I-C EA 180.000 $4.450 $4.100 $4.000
672 6009 REFL PAV MRKR TY II-A-A EA 180.000 $4.320 $4.100 $4.000
678 6002 PAV SURF PREP FOR MRK (6") LF 118,589.000 $0.050 $0.010 $0.010
678 6004 PAV SURF PREP FOR MRK (8") LF 3,170.000 $0.090 $0.010 $0.010
678 6006 PAV SURF PREP FOR MRK (12") LF 300.000 $0.160 $0.050 $0.050
678 6008 PAV SURF PREP FOR MRK (24") LF 300.000 $0.280 $0.050 $0.050
678 6009 PAV SURF PREP FOR MRK (ARROW) EA 60.000 $10.970 $2.550 $2.500
678 6016 PAV SURF PREP FOR MRK (WORD) EA 27.000 $13.200 $2.550 $2.500
678 6020 PAV SURF PREP FOR MRK (RR XING) EA 4.000 $13.430 $10.100 $10.000
3077 6051 SP MIXES SP-D PG70-22 TON 3,508.000 $100.000 $100.000 $100.000
3077 6052 SP MIXES SP-D SAC-A PG70-22 TON 15,766.000 $80.000 $98.000 $100.000
3077 6075 TACK COAT GAL 2,566.000 $1.890 $2.800 $5.000
6185 6002 TMA (STATIONARY) DAY 27.000 $200.000 $155.000 $450.000
6185 6005 TMA (MOBILE OPERATION) DAY 9.000 $470.000 $155.000 $450.000
Totals: $7,104,632.84 $7,147,856.63 $7,366,291.34