Job Info for 0976-03-104

County: GALVESTON Highway: FM 518 Date: 05/08/2020 (4 years ago) Engineer's Estimate: $2,236,122 Control Number: 0976-03-104
Project: STP 2020(664)TP District: HOUSTON Time: 120 WORKING DAYS Type: CONSTRUCTION OF A 10' WIDE SHARED USED PATH
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,236,121.60
ARANDA BROTHERS CONSTRUCTION CO., INC.   $2,146,673.65 1
-4% | -$89,447.95
TRIPLE B SERVICES LLP   $2,326,433.77 2
4.04% | $90,312.17
8.37% | $179,760.12
ISI CONTRACTING, INC.   $2,545,732.53 3
13.85% | $309,610.93
18.59% | $399,058.88
9.43% | $219,298.76
SER CONSTRUCTION PARTNERS, LLC   $2,587,093.48 4
15.7% | $350,971.88
20.52% | $440,419.83
1.62% | $41,360.95
ENCINO LANDSCAPE, INC.   $2,588,125.46 5
15.74% | $352,003.86
20.56% | $441,451.81
0.04% | $1,031.98
MAIN LANE INDUSTRIES LTD.   $2,634,584.10 6
17.82% | $398,462.50
22.73% | $487,910.45
1.80% | $46,458.64
HARPER BROTHERS CONSTRUCTION LLC   $2,799,317.89 7
25.19% | $563,196.29
30.4% | $652,644.24
6.25% | $164,733.79
RAGLE CONSTRUCTION, INC.   $2,844,787.65 8
27.22% | $608,666.05
32.52% | $698,114.00
1.62% | $45,469.76
ANGEL BROTHERS HOLDINGS CORP.   $2,973,849.75 9
32.99% | $737,728.15
38.53% | $827,176.10
4.54% | $129,062.10
TIKON GROUP, INC.   $3,153,213.80 10
41.01% | $917,092.20
46.89% | $1,006,540.15
6.03% | $179,364.05
FNH CONSTRUCTION, LLC   $3,242,246.00 11
44.99% | $1,006,124.40
51.04% | $1,095,572.35
2.82% | $89,032.20

Bid Items

Items: 86, 0 filtered
GALVESTON FM 518  |  HOUSTON  |  0976-03-104  |  05/08/2020  |  $2,236,122  |  STP 2020(664)TP  |  CONSTRUCTION OF A 10' WIDE SHARED USED PATH  |  120 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ARANDA BROTHERS CONSTRUCTION CO., INC. TRIPLE B SERVICES LLP ISI CONTRACTING, INC. SER CONSTRUCTION PARTNERS, LLC ENCINO LANDSCAPE, INC. MAIN LANE INDUSTRIES LTD. HARPER BROTHERS CONSTRUCTION LLC RAGLE CONSTRUCTION, INC. ANGEL BROTHERS HOLDINGS CORP. TIKON GROUP, INC. FNH CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 84.470 $1,000.000 $1,500.000 $400.000 $800.000 $1,600.000 $2,500.000 $2,000.000 $1,000.000 $940.000 $2,600.000 $500.000 $2,000.000
104 6009 REMOVING CONC (RIPRAP) SY 402.000 $10.000 $9.000 $7.800 $15.000 $10.900 $20.000 $10.000 $10.000 $8.000 $45.000 $45.000 $20.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 317.000 $10.000 $9.000 $7.800 $15.000 $8.300 $20.000 $10.000 $10.000 $12.000 $50.000 $12.000 $20.000
104 6021 REMOVING CONC (CURB) LF 142.000 $5.000 $9.000 $4.650 $3.550 $3.000 $20.000 $10.000 $3.000 $16.000 $75.000 $10.000 $20.000
104 6028 REMOVING CONC (MISC) SY 276.000 $10.000 $9.000 $7.800 $15.000 $10.900 $20.000 $10.000 $10.000 $16.000 $50.000 $12.000 $20.000
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY 228.000 $8.000 $9.000 $7.800 $13.330 $9.700 $20.000 $10.000 $10.000 $10.000 $70.000 $9.000 $20.000
110 6001 EXCAVATION (ROADWAY) CY 3,982.000 $10.000 $10.000 $16.000 $25.490 $20.000 $20.000 $28.000 $15.000 $26.000 $40.000 $15.000 $20.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 50.000 $15.000 $18.000 $140.000 $105.190 $24.800 $20.000 $43.000 $15.000 $31.000 $40.000 $25.000 $30.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 941.000 $12.000 $19.000 $32.250 $53.490 $3.200 $20.000 $20.000 $5.000 $7.000 $40.000 $15.000 $30.000
161 6009 EROSION CONTROL COMPOST CY 10.000 $25.000 $35.000 $73.750 $30.300 $87.400 $20.000 $185.000 $150.000 $185.630 $80.000 $100.000 $100.000
162 6002 BLOCK SODDING SY 12,145.000 $3.000 $3.500 $5.700 $4.000 $4.100 $4.000 $4.000 $5.000 $5.500 $4.000 $7.500 $6.000
166 6001 FERTILIZER AC 2.500 $650.000 $1,650.000 $510.000 $1,500.000 $1,001.300 $700.000 $2,000.000 $1,500.000 $1,250.000 $1,000.000 $1,000.000 $3,500.000
168 6001 VEGETATIVE WATERING MG 301.220 $15.000 $35.000 $1.000 $15.000 $25.800 $10.000 $20.000 $40.000 $16.000 $30.000 $65.000 $50.000
276 6224 CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6") SY 11,237.000 $6.500 $10.000 $24.000 $15.000 $17.200 $10.000 $21.000 $18.000 $20.000 $22.950 $10.000 $30.000
400 6005 CEM STABIL BKFL CY 30.000 $65.000 $60.000 $47.500 $48.000 $449.600 $100.000 $100.000 $45.000 $100.000 $130.000 $150.000 $350.000
403 6001 TEMPORARY SPL SHORING SF 2,330.000 $12.000 $30.000 $39.000 $53.000 $23.300 $24.000 $15.000 $10.000 $38.500 $50.000 $55.000 $55.000
409 6001 PRESTR CONC PIL (16 IN SQ) LF 400.000 $90.000 $140.000 $200.000 $265.000 $226.000 $95.000 $220.000 $280.000 $180.000 $210.000 $150.000 $150.000
420 6011 CL B CONC (FLUME) CY 18.000 $400.000 $410.000 $1,415.000 $800.000 $799.600 $500.000 $600.000 $900.000 $900.000 $700.000 $650.000 $1,500.000
420 6013 CL C CONC (ABUT) CY 25.000 $900.000 $970.000 $1,950.000 $950.000 $2,467.600 $800.000 $1,900.000 $1,800.000 $1,100.000 $2,000.000 $650.000 $1,500.000
420 6029 CL C CONC (CAP) CY 12.000 $900.000 $1,000.000 $2,500.000 $1,000.000 $2,195.400 $900.000 $2,000.000 $3,500.000 $2,750.000 $2,000.000 $750.000 $1,500.000
422 6001 REINF CONC SLAB SF 2,004.000 $13.000 $14.250 $25.000 $30.000 $33.600 $20.000 $39.500 $50.000 $40.000 $35.000 $28.000 $20.000
422 6015 APPROACH SLAB CY 10.000 $500.000 $605.000 $2,100.000 $800.000 $1,047.100 $500.000 $1,000.000 $750.000 $700.000 $1,100.000 $655.000 $1,500.000
423 6004 RETAINING WALL (CONC BLOCK) SF 1,851.000 $40.000 $35.000 $25.500 $70.000 $44.400 $30.000 $44.000 $30.000 $24.000 $25.000 $38.000 $55.000
423 6008 RETAINING WALL (CAST - IN - PLACE) SF 3,200.000 $70.000 $45.000 $31.000 $45.000 $70.000 $95.000 $52.000 $90.000 $80.000 $55.000 $45.000 $65.000
425 6035 PRESTR CONC GIRDER (TX28) LF 249.500 $110.000 $195.000 $265.000 $240.000 $186.000 $220.000 $190.000 $260.000 $500.000 $240.000 $120.000 $85.000
432 6001 RIPRAP (CONC)(4 IN) CY 150.000 $375.000 $325.000 $510.000 $460.000 $398.400 $420.000 $550.000 $500.000 $500.000 $550.000 $650.000 $550.000
432 6008 RIPRAP (CONC)(CL B)(RR8&RR9) CY 60.000 $415.000 $330.000 $750.000 $525.000 $399.600 $500.000 $600.000 $500.000 $550.000 $650.000 $750.000 $650.000
432 6009 RIPRAP (CONC) (CL B) (4") CY 12.000 $420.000 $365.000 $210.000 $780.000 $512.500 $500.000 $600.000 $400.000 $1,100.000 $580.000 $650.000 $650.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 4.300 $440.000 $420.000 $1,175.000 $780.000 $805.100 $500.000 $600.000 $800.000 $750.000 $600.000 $655.000 $550.000
442 6007 STR STEEL (MISC NON - BRIDGE) LB 1,838.400 $7.000 $9.000 $7.000 $19.000 $6.200 $5.000 $12.000 $1.000 $7.000 $10.000 $35.000 $10.000
450 6029 RAIL (TY C1W) LF 630.500 $260.000 $220.000 $160.000 $240.000 $243.900 $150.000 $190.000 $200.000 $175.000 $200.000 $235.000 $185.000
450 6103 RAIL (TY PR11) LF 973.000 $90.000 $140.000 $62.500 $70.000 $123.700 $75.000 $130.000 $100.000 $60.000 $80.000 $175.000 $150.000
454 6004 ARMOR JOINT (SEALED) LF 32.000 $100.000 $105.000 $125.000 $110.000 $90.000 $100.000 $150.000 $300.000 $85.000 $80.000 $125.000 $100.000
464 6003 RC PIPE (CL III)(18 IN) LF 88.000 $60.000 $70.000 $110.000 $90.000 $112.600 $90.000 $120.000 $150.000 $70.000 $200.000 $72.000 $85.000
464 6005 RC PIPE (CL III)(24 IN) LF 65.000 $80.000 $85.000 $90.000 $120.000 $118.500 $95.000 $150.000 $150.000 $105.000 $210.000 $122.000 $125.000
464 6009 RC PIPE (CL III)(42 IN) LF 76.000 $100.000 $190.000 $190.000 $240.000 $135.500 $180.000 $210.000 $230.000 $140.000 $350.000 $388.000 $450.000
465 6004 MANH (COMPL)(PRM)(72IN) EA 1.000 $5,500.000 $8,250.000 $6,505.000 $8,000.000 $9,115.700 $6,500.000 $7,500.000 $23,000.000 $5,000.000 $9,000.000 $6,780.000 $8,500.000
465 6187 INLET(COMPL)(DROP)(TY 1)(1 GRATE) EA 3.000 $4,200.000 $2,950.000 $3,500.000 $4,500.000 $2,469.600 $5,000.000 $4,000.000 $6,000.000 $6,200.000 $2,700.000 $3,500.000 $6,500.000
466 6097 HEADWALL (CH - PW - 0) (DIA= 24 IN) EA 1.000 $5,000.000 $8,450.000 $4,000.000 $3,400.000 $4,721.200 $5,500.000 $5,000.000 $15,000.000 $8,000.000 $4,500.000 $7,800.000 $4,500.000
467 6356 SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 4.000 $650.000 $450.000 $1,415.000 $820.000 $1,432.100 $1,000.000 $2,000.000 $2,000.000 $1,000.000 $2,000.000 $2,500.000 $2,000.000
479 6001 ADJUSTING MANHOLES EA 1.000 $440.000 $650.000 $345.000 $420.000 $352.800 $1,000.000 $500.000 $800.000 $2,000.000 $2,000.000 $1,500.000 $2,500.000
479 6010 ADJUSTING MANHOLES (ELECTRIC BOX) EA 1.000 $250.000 $300.000 $335.000 $420.000 $1,120.000 $600.000 $500.000 $800.000 $1,500.000 $2,200.000 $1,500.000 $850.000
479 6012 ADJUSTING MANHOLES (TELEPHONE BOX) EA 1.000 $250.000 $350.000 $350.000 $420.000 $1,120.000 $1,000.000 $500.000 $800.000 $1,500.000 $2,200.000 $1,500.000 $850.000
496 6003 REMOV STR (MANHOLE) EA 1.000 $650.000 $600.000 $560.000 $1,100.000 $1,232.000 $500.000 $750.000 $800.000 $600.000 $2,500.000 $2,500.000 $2,500.000
496 6004 REMOV STR (SET) EA 4.000 $500.000 $450.000 $445.000 $1,100.000 $187.600 $600.000 $600.000 $500.000 $500.000 $2,000.000 $500.000 $1,500.000
496 6007 REMOV STR (PIPE) LF 57.000 $25.000 $10.000 $24.000 $23.000 $38.100 $20.000 $10.000 $10.000 $35.000 $40.000 $10.000 $30.000
500 6001 MOBILIZATION LS 1.000 $203,000.000 $220,000.000 $10,000.000 $191,000.000 $250,000.000 $200,000.000 $250,000.000 $90,000.000 $278,000.000 $280,000.000 $350,000.000 $300,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $5,000.000 $2,100.000 $850.000 $2,000.000 $3,360.000 $8,500.000 $4,400.000 $7,000.000 $9,000.000 $2,000.000 $3,500.000 $8,500.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 360.000 $35.000 $25.000 $100.000 $90.000 $33.600 $30.000 $30.000 $57.100 $26.760 $30.000 $290.000 $30.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 360.000 $10.000 $5.000 $32.000 $30.000 $12.300 $10.000 $11.000 $10.750 $7.840 $10.000 $35.000 $15.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 468.000 $25.000 $25.000 $35.000 $30.000 $28.000 $30.000 $26.000 $49.070 $30.750 $25.000 $25.000 $40.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 468.000 $9.000 $10.000 $22.500 $10.000 $5.600 $10.000 $8.000 $2.780 $8.790 $8.000 $10.000 $20.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 4,843.000 $2.500 $3.000 $3.000 $3.500 $2.300 $2.000 $2.000 $3.500 $2.680 $2.500 $5.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 4,843.000 $1.000 $2.000 $0.850 $1.000 $0.700 $0.700 $1.000 $1.360 $0.530 $0.750 $2.000 $2.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 280.000 $5.000 $6.000 $5.400 $6.000 $13.400 $5.000 $4.000 $7.410 $6.000 $3.500 $6.000 $18.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 280.000 $1.000 $1.000 $1.000 $1.200 $2.200 $1.000 $1.600 $1.020 $3.000 $0.900 $2.000 $9.000
529 6002 CONC CURB (TY II) LF 101.000 $15.000 $7.000 $8.250 $6.000 $18.800 $20.000 $45.000 $25.000 $10.000 $31.000 $25.000 $50.000
529 6022 CONC CURB (DOWEL) (TY II) LF 15.000 $15.000 $15.000 $28.000 $7.300 $18.800 $20.000 $60.000 $100.000 $45.000 $85.000 $45.000 $50.000
530 6004 DRIVEWAYS (CONC) SY 266.000 $75.000 $65.000 $130.000 $100.000 $58.200 $80.000 $70.000 $65.000 $75.000 $100.000 $88.000 $85.000
531 6001 CONC SIDEWALKS (4") SY 29.000 $45.000 $60.000 $110.000 $59.000 $57.100 $70.000 $60.000 $120.000 $100.000 $50.000 $72.000 $65.000
531 6003 CONC SIDEWALKS (6") SY 9,658.000 $68.000 $48.000 $65.000 $49.000 $52.500 $70.000 $50.000 $79.000 $65.000 $57.000 $78.000 $60.000
531 6004 CURB RAMPS (TY 1) EA 5.000 $2,000.000 $1,550.000 $1,425.000 $1,600.000 $1,691.200 $1,700.000 $1,300.000 $2,000.000 $1,300.000 $1,600.000 $2,500.000 $3,000.000
531 6009 CURB RAMPS (TY 6) EA 1.000 $2,600.000 $1,650.000 $1,700.000 $1,600.000 $1,747.200 $2,600.000 $2,500.000 $3,000.000 $1,000.000 $1,800.000 $5,100.000 $3,000.000
531 6010 CURB RAMPS (TY 7) EA 5.000 $2,600.000 $1,700.000 $1,700.000 $1,600.000 $1,747.200 $1,700.000 $2,400.000 $2,000.000 $1,600.000 $1,700.000 $2,500.000 $3,000.000
550 6001 CHAIN LINK FENCE (INSTALL) (6') LF 2,587.000 $20.000 $18.000 $19.500 $32.000 $19.300 $25.000 $18.000 $15.000 $40.250 $20.000 $45.000 $40.000
550 6003 CHAIN LINK FENCE (REMOVE) LF 1,186.000 $18.000 $3.000 $4.750 $8.000 $4.700 $8.000 $10.000 $3.500 $7.000 $7.000 $25.000 $10.000
550 6022 GATE (INSTALL)(DOUBLE)(6' X 16') EA 1.000 $1,000.000 $1,500.000 $1,350.000 $2,500.000 $1,341.800 $1,000.000 $1,500.000 $2,000.000 $1,906.760 $1,500.000 $25,000.000 $2,000.000
636 6001 ALUMINUM SIGNS (TY A) SF 11.000 $30.000 $25.000 $22.000 $200.000 $17.600 $25.000 $19.000 $250.000 $19.500 $19.000 $500.000 $30.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 12.000 $440.000 $455.000 $370.000 $530.000 $431.200 $500.000 $325.000 $250.000 $325.000 $450.000 $465.000 $1,000.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 11.000 $450.000 $355.000 $335.000 $450.000 $308.000 $500.000 $300.000 $250.000 $295.000 $300.000 $356.000 $650.000
644 6076 REMOVE SM RD SN SUP&AM EA 1.000 $80.000 $150.000 $95.000 $95.000 $95.200 $100.000 $85.000 $250.000 $85.000 $65.000 $1,500.000 $450.000
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 300.000 $3.000 $8.000 $4.550 $4.000 $3.600 $4.000 $4.000 $3.750 $3.800 $6.200 $5.000 $8.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 65.000 $5.000 $27.000 $11.400 $9.000 $7.200 $8.000 $10.000 $7.000 $7.340 $10.500 $15.000 $15.000
666 6224 PAVEMENT SEALER 4" LF 4,096.000 $0.050 $0.500 $0.250 $0.350 $0.200 $0.300 $0.200 $0.250 $0.300 $1.050 $0.500 $2.000
666 6228 PAVEMENT SEALER 12" LF 300.000 $0.050 $1.150 $0.500 $1.200 $0.600 $1.000 $0.500 $2.000 $1.000 $2.100 $12.000 $3.000
666 6230 PAVEMENT SEALER 24" LF 65.000 $1.000 $2.500 $1.150 $2.400 $1.300 $2.000 $1.000 $4.000 $2.000 $4.200 $15.000 $5.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 2,639.000 $0.400 $1.150 $1.150 $0.800 $1.300 $0.640 $1.000 $0.800 $0.640 $1.600 $0.500 $3.000
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 1,457.000 $0.400 $1.500 $1.150 $0.800 $1.300 $0.640 $1.000 $0.800 $0.640 $1.600 $0.500 $3.000
678 6001 PAV SURF PREP FOR MRK (4") LF 4,096.000 $0.050 $0.500 $0.100 $0.020 $0.300 $0.020 $0.100 $0.010 $0.020 $0.550 $0.250 $3.000
678 6006 PAV SURF PREP FOR MRK (12") LF 300.000 $0.500 $1.350 $0.300 $0.250 $0.800 $0.200 $0.300 $0.010 $0.200 $1.050 $0.250 $2.000
678 6008 PAV SURF PREP FOR MRK (24") LF 65.000 $0.500 $2.250 $0.650 $0.480 $1.700 $0.400 $0.600 $0.010 $0.400 $2.100 $2.000 $3.000
690 6136 REMOVE RADAR VEHICLE DETECTION SYSTEM EA 1.000 $450.000 $650.000 $905.000 $3,600.000 $1,120.000 $4,900.000 $700.000 $3,000.000 $2,500.000 $500.000 $1,500.000 $3,000.000
740 6005 ANTI - GRAFFITI COATNG(PERMNENT-TY III) SF 2,479.000 $1.000 $1.750 $1.000 $2.000 $1.100 $1.000 $0.900 $0.900 $1.990 $0.950 $5.000 $10.000
1004 6001 TREE PROTECTION EA 2.000 $260.000 $500.000 $225.000 $200.000 $1,680.000 $500.000 $350.000 $1,000.000 $500.000 $350.000 $425.000 $1,000.000
5033 6001 FIXED BOLLARD EA 2.000 $500.000 $1,350.000 $1,500.000 $1,000.000 $1,437.000 $1,000.000 $1,500.000 $2,000.000 $650.000 $400.000 $2,000.000 $1,500.000
6185 6002 TMA (STATIONARY) DAY 89.000 $250.000 $185.000 $400.000 $200.000 $166.900 $200.000 $220.000 $600.000 $210.000 $150.000 $500.000 $350.000
Totals: $2,236,121.60 $2,146,673.65 $2,326,433.77 $2,545,732.53 $2,587,093.49 $2,588,125.46 $2,634,584.10 $2,799,317.89 $2,844,787.65 $2,973,849.75 $3,153,213.80 $3,242,246.00