Job Info for 0912-73-223

County: GALVESTON Highway: VA Date: 08/04/2022 (2 years ago) Engineer's Estimate: $4,337,106 Control Number: 0912-73-223
Project: F 2022(930) District: HOUSTON Time: 296 WORKING DAYS Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,337,106.08
SER CONSTRUCTION PARTNERS, LLC   $4,496,853.15 1
3.68% | $159,747.07
TEXAS WALL & LANDSCAPE   $4,694,609.30 2
8.24% | $357,503.22
4.4% | $197,756.15
ARANDA BROTHERS CONSTRUCTION CO., INC.   $4,724,808.70 3
8.94% | $387,702.62
5.07% | $227,955.55
0.64% | $30,199.40
ENCINO LANDSCAPE, INC.   $5,619,449.90 4
29.57% | $1,282,343.82
24.96% | $1,122,596.75
18.93% | $894,641.20
BRIZO CONSTRUCTION, LLC   $5,684,853.46 5
31.07% | $1,347,747.38
26.42% | $1,188,000.31
1.16% | $65,403.56
TI-ZACK CONCRETE, INC.   $6,495,559.92 6
49.77% | $2,158,453.84
44.45% | $1,998,706.77
14.26% | $810,706.46

Bid Items

Items: 93, 0 filtered
GALVESTON VA  |  HOUSTON  |  0912-73-223  |  08/04/2022  |  $4,337,106  |  F 2022(930)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  296 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate SER CONSTRUCTION PARTNERS, LLC TEXAS WALL & LANDSCAPE ARANDA BROTHERS CONSTRUCTION CO., INC. ENCINO LANDSCAPE, INC. BRIZO CONSTRUCTION, LLC TI-ZACK CONCRETE, INC.
100 6002 PREPARING ROW STA 180.500 $2,500.000 $1,450.000 $1,350.000 $1,100.000 $3,333.000 $500.000 $1,100.000
100 6006 PREP ROW (TREE)(LESS THAN 24" DIA) EA 14.000 $960.000 $997.500 $530.000 $550.000 $800.000 $500.000 $1,100.000
100 6007 PREP ROW (TREE)(GREATER THAN 24" DIA) EA 1.000 $5,000.000 $3,150.000 $1,500.000 $750.000 $3,000.000 $1,500.000 $2,750.000
100 6028 PREP ROW (TREE PRUNING) EA 6.000 $920.000 $315.000 $732.000 $350.000 $2,000.000 $1,000.000 $165.000
104 6001 REMOVING CONC (PAV) SY 1,929.000 $13.000 $43.100 $6.000 $12.000 $20.000 $20.000 $37.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 8,174.000 $13.000 $28.900 $12.000 $15.000 $20.000 $15.000 $35.000
104 6029 REMOVING CONC (CURB OR CURB & GUTTER) LF 3,202.000 $13.000 $8.700 $2.500 $3.000 $20.000 $6.500 $9.000
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY 536.000 $19.000 $21.700 $9.000 $12.500 $20.000 $9.000 $13.000
105 6011 REMOVING STAB BASE AND ASPH PAV (2"-6") SY 809.000 $8.000 $27.600 $70.000 $13.500 $20.000 $9.400 $17.000
105 6037 REMOVING STAB BASE AND ASPH PAV(0"-16") SY 1,306.000 $7.000 $23.100 $70.000 $14.500 $20.000 $11.000 $22.000
110 6003 EXCAVATION (SPECIAL) CY 1,500.000 $11.000 $22.300 $50.000 $16.500 $20.000 $45.000 $5.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 3,847.000 $12.000 $15.200 $32.000 $22.500 $20.000 $41.000 $60.000
161 6009 EROSION CONTROL COMPOST CY 65.000 $14.500 $102.900 $65.000 $95.000 $20.000 $40.280 $33.000
162 6002 BLOCK SODDING SY 14,025.000 $5.000 $5.300 $6.000 $6.500 $4.000 $4.160 $3.000
166 6001 FERTILIZER AC 2.900 $1,160.000 $1,050.000 $2,600.000 $1,650.000 $500.000 $671.290 $550.000
168 6001 VEGETATIVE WATERING MG 341.390 $22.000 $36.800 $150.000 $85.000 $10.000 $51.020 $33.000
275 6003 CEMENT TREAT (NEW BASE) (6") SY 1,265.000 $2.000 $39.500 $102.000 $25.000 $5.000 $17.000 $3.000
310 6009 PRIME COAT (MC-30) GAL 128.000 $6.000 $12.200 $90.000 $10.000 $10.000 $8.000 $6.000
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 1,265.000 $72.000 $57.600 $85.000 $135.000 $100.000 $112.000 $94.000
360 6043 CONC PVMT (CONT REINF)(FAST TRK)(13") SY 1,756.000 $133.000 $148.100 $164.000 $125.000 $150.000 $185.000 $318.000
423 6008 RETAINING WALL (CAST - IN - PLACE) SF 307.000 $75.000 $81.000 $170.000 $75.000 $100.000 $80.000 $70.000
432 6001 RIPRAP (CONC)(4 IN) CY 4.000 $505.000 $819.500 $865.000 $450.000 $500.000 $1,060.000 $954.000
432 6003 RIPRAP (CONC)(6 IN) CY 37.000 $400.000 $1,070.400 $384.000 $485.000 $500.000 $940.000 $954.000
432 6022 RIPRAP (STONE COMMON)(DRY)(6 IN) CY 8.000 $290.000 $238.400 $475.000 $550.000 $300.000 $270.000 $165.000
442 6007 STR STEEL (MISC NON - BRIDGE) LB 6,494.000 $15.000 $10.800 $6.250 $12.750 $20.000 $11.000 $10.000
450 6048 RAIL (HANDRAIL)(TY B) LF 43.000 $300.000 $150.000 $280.000 $170.000 $250.000 $226.000 $220.000
471 6003 GRATE & FRAME EA 29.000 $2,620.000 $1,800.000 $958.000 $1,050.000 $4,000.000 $1,520.000 $2,973.000
479 6001 ADJUSTING MANHOLES EA 4.000 $1,350.000 $548.500 $1,800.000 $650.000 $1,000.000 $470.630 $1,767.000
479 6002 ADJUSTING INLETS EA 22.000 $4,370.000 $2,548.900 $729.000 $550.000 $4,000.000 $800.000 $1,285.000
479 6004 ADJUSTING MANHOLES (SANITARY) EA 15.000 $2,110.000 $724.900 $550.000 $650.000 $1,600.000 $470.000 $1,414.000
479 6005 ADJUSTING MANHOLES (WATER VALVE BOX) EA 12.000 $520.000 $469.800 $236.000 $450.000 $500.000 $175.000 $1,178.000
479 6008 ADJUSTING MANHOLES (WATER METER) EA 3.000 $423.000 $469.800 $289.000 $550.000 $500.000 $420.000 $236.000
479 6012 ADJUSTING MANHOLES (TELEPHONE BOX) EA 5.000 $3,500.000 $3,265.500 $900.000 $500.000 $1,000.000 $420.000 $1,414.000
500 6001 MOBILIZATION LS 1.000 $266,000.000 $440,000.000 $315,000.000 $475,000.000 $450,000.000 $560,000.000 $600,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 20.000 $9,600.000 $3,500.000 $8,500.000 $4,500.000 $8,000.000 $10,000.000 $11,000.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 8,108.000 $3.500 $2.100 $3.000 $2.000 $3.000 $5.000 $1.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 8,108.000 $1.000 $0.500 $2.000 $1.000 $0.500 $0.600 $1.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 1,892.000 $8.000 $6.300 $7.000 $9.000 $5.000 $10.000 $1.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 2,197.000 $6.000 $12.600 $8.000 $13.000 $5.000 $14.000 $1.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 4,089.000 $2.000 $2.100 $2.000 $2.000 $0.500 $1.000 $1.000
528 6004 LANDSCAPE PAVERS SY 926.000 $77.000 $160.000 $100.000 $75.000 $111.000 $100.000 $165.000
529 6002 CONC CURB (TY II) LF 2,264.000 $13.000 $14.000 $11.000 $8.000 $25.000 $18.000 $53.000
529 6008 CONC CURB & GUTTER (TY II) LF 871.000 $28.000 $53.300 $40.000 $15.750 $30.000 $44.000 $53.000
529 6011 CONC CURB (DOWEL) LF 1,513.000 $8.500 $8.300 $26.000 $9.000 $25.000 $30.000 $35.000
529 6020 CONC CURB & GUTTER (ARMOR CURB) LF 30.000 $290.000 $303.400 $505.000 $175.000 $400.000 $440.000 $869.000
530 6025 DRIVEWAYS (CONC) (FAST TRACK) SY 9,631.000 $87.000 $91.200 $93.000 $105.000 $120.000 $130.000 $160.000
531 6001 CONC SIDEWALKS (4") SY 11,357.000 $63.000 $62.600 $70.000 $90.000 $90.000 $120.000 $110.000
531 6003 CONC SIDEWALKS (6") SY 4.000 $90.000 $205.800 $120.000 $95.000 $90.000 $120.000 $165.000
531 6018 CURB RAMPS (TY 1) SY 66.000 $190.000 $151.700 $136.000 $225.000 $169.000 $170.000 $165.000
531 6019 CURB RAMPS (TY 2) SY 232.000 $165.000 $143.800 $150.000 $235.000 $169.000 $170.000 $165.000
531 6022 CURB RAMPS (TY 5) SY 13.000 $255.000 $141.600 $277.000 $225.000 $169.000 $175.000 $165.000
531 6024 CURB RAMPS (TY 7) SY 382.000 $160.000 $144.400 $210.000 $260.000 $169.000 $160.000 $165.000
531 6027 CURB RAMPS (TY 10) SY 464.000 $175.000 $155.800 $93.000 $260.000 $169.000 $160.000 $165.000
531 6031 CURB RAMPS (TY 22) SY 52.000 $300.000 $138.000 $227.000 $250.000 $169.000 $170.000 $165.000
531 6032 CONC SIDEWALKS (SPECIAL) (TYPE A) SY 27.000 $530.000 $292.300 $545.000 $165.000 $500.000 $780.000 $477.000
536 6005 CONCRETE MEDIAN (NOSE) SY 88.000 $171.000 $66.700 $322.000 $95.000 $200.000 $83.000 $165.000
624 6009 GROUND BOX TY D (162922) EA 20.000 $1,665.000 $1,575.000 $1,300.000 $1,200.000 $1,000.000 $671.290 $1,705.000
624 6028 REMOVE GROUND BOX EA 20.000 $750.000 $404.300 $500.000 $400.000 $500.000 $134.260 $424.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 25.000 $665.000 $567.000 $400.000 $300.000 $500.000 $933.090 $765.000
644 6070 RELOCATE SM RD SN SUP&AM TY S80 EA 8.000 $1,280.000 $693.000 $400.000 $350.000 $800.000 $1,060.640 $869.000
644 6076 REMOVE SM RD SN SUP&AM EA 6.000 $130.000 $126.000 $106.000 $350.000 $100.000 $114.120 $94.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 75.000 $1.000 $5.300 $3.000 $3.000 $2.000 $3.020 $2.000
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 370.000 $3.000 $6.300 $4.000 $4.500 $4.000 $5.370 $4.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 8,588.000 $7.000 $7.600 $5.500 $9.000 $10.000 $10.740 $9.000
666 6170 REFL PAV MRK TY II (W) 4" (SLD) LF 2,100.000 $0.500 $0.500 $0.500 $1.000 $1.000 $0.810 $7.000
666 6178 REFL PAV MRK TY II (W) 8" (SLD) LF 75.000 $1.000 $5.300 $2.350 $1.350 $1.000 $1.610 $1.000
666 6180 REFL PAV MRK TY II (W) 12" (SLD) LF 370.000 $2.000 $2.100 $1.750 $2.250 $5.000 $2.950 $2.000
666 6182 REFL PAV MRK TY II (W) 24" (SLD) LF 8,588.000 $4.500 $3.800 $3.500 $4.550 $5.000 $5.640 $5.000
666 6205 REFL PAV MRK TY II (Y) 4" (BRK) LF 310.000 $0.500 $0.500 $1.000 $1.000 $1.000 $0.810 $1.000
666 6207 REFL PAV MRK TY II (Y) 4" (SLD) LF 273.000 $0.500 $0.500 $1.000 $1.000 $1.000 $0.810 $1.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 2,100.000 $0.500 $0.600 $1.250 $1.350 $1.000 $1.340 $1.000
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 310.000 $0.500 $0.600 $1.250 $1.000 $1.000 $1.680 $1.000
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 273.000 $0.500 $0.600 $2.250 $1.000 $1.000 $1.680 $1.000
672 6009 REFL PAV MRKR TY II-A-A EA 19.000 $4.500 $6.300 $10.500 $25.000 $6.000 $13.430 $11.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 1,076.000 $0.500 $0.500 $0.500 $0.850 $1.000 $0.670 $1.000
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 75.000 $1.000 $2.100 $1.000 $2.000 $2.000 $1.480 $1.000
677 6005 ELIM EXT PAV MRK & MRKS (12") LF 6,083.000 $1.500 $2.800 $1.000 $1.550 $3.000 $1.680 $1.000
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 1,374.000 $3.500 $10.500 $2.250 $3.000 $5.000 $3.360 $3.000
677 6008 ELIM EXT PAV MRK & MRKS (ARROW) EA 2.000 $64.000 $157.500 $52.000 $75.000 $50.000 $80.560 $66.000
677 6038 ELIM EXT PAV MRK & MRKRS(PLOWABLE RPMS) EA 16.000 $1.500 $3.200 $52.000 $2.000 $2.000 $1.340 $1.000
678 6001 PAV SURF PREP FOR MRK (4") LF 2,683.000 $0.500 $0.200 $0.100 $0.100 $0.500 $0.050 $0.040
678 6004 PAV SURF PREP FOR MRK (8") LF 75.000 $0.500 $1.100 $0.200 $0.200 $0.500 $0.110 $0.090
678 6006 PAV SURF PREP FOR MRK (12") LF 370.000 $0.500 $0.300 $0.350 $0.200 $0.500 $0.160 $0.130
678 6008 PAV SURF PREP FOR MRK (24") LF 8,588.000 $1.000 $0.400 $0.750 $0.450 $0.500 $0.320 $0.260
682 6018 PED SIG SEC (LED)(COUNTDOWN) EA 2.000 $755.000 $787.500 $1,200.000 $1,100.000 $1,000.000 $1,342.580 $825.000
684 6007 TRF SIG CBL (TY A)(12 AWG)(2 CONDR) LF 415.000 $2.000 $3.200 $2.000 $2.500 $2.000 $26.850 $3.000
684 6031 TRF SIG CBL (TY A)(14 AWG)(5 CONDR) LF 405.000 $3.500 $4.200 $2.000 $2.500 $5.000 $24.170 $4.000
688 6002 PED DETECT PUSH BUTTON (STANDARD) EA 4.000 $700.000 $367.500 $900.000 $950.000 $600.000 $1,006.940 $385.000
690 6030 REMOVAL OF PEDESTRIAN PUSH BUTTONS EA 2.000 $75.000 $183.800 $500.000 $500.000 $500.000 $335.650 $193.000
1004 6001 TREE PROTECTION EA 16.000 $535.000 $525.000 $70.000 $200.000 $600.000 $533.440 $165.000
3076 6036 D-GR HMA TY-D SAC-A PG64-22 TON 39.000 $152.000 $210.000 $140.000 $280.000 $300.000 $221.710 $440.000
6049 6001 LONG CHANNEL MOUNT CURB SYS (INSTALL) LF 300.000 $66.000 $105.000 $50.000 $170.000 $100.000 $100.690 $83.000
6185 6005 TMA (MOBILE OPERATION) DAY 260.000 $330.000 $283.500 $850.000 $300.000 $300.000 $500.000 $110.000
Totals: $4,337,106.08 $4,496,853.15 $4,694,609.30 $4,724,808.70 $5,619,449.90 $5,684,853.47 $6,495,559.92