Show Job Controls
Bid Cobra

GALVESTON CS (0912-73-212)

Items: 50

County: GALVESTON
Length: N/A
Highway: CS
District: HOUSTON
Control Number: 0912-73-212
DBE Goal: N/A
Project: BR 1802(833)
Guaranty: N/A
Time: 112 WORKING DAYS
Engineer's Estimate: $429,836.83
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$429,836.83
1
$474,034.06
Over/Under Est: 10.28% $44,197.23
Over/Under Est: 11.74% $50,478.67
Amt Left: 1.33% $6,281.44
Over/Under Est: 25.23% $108,462.54
Amt Left: 13.56% $64,265.31
Delta: -12.07% -$57,983.87
Over/Under Est: 35.78% $153,799.52
Amt Left: 23.12% $109,602.29
Delta: -8.42% -$45,336.98
Over/Under Est: 39.12% $168,158.17
Amt Left: 26.15% $123,960.94
Delta: -2.46% -$14,358.65
Over/Under Est: 47.19% $202,834.14
Amt Left: 33.47% $158,636.91
Delta: -5.80% -$34,675.97

Bid Items & Bid Tabulations

50 Total 0 of 50
GALVESTON  |  CS  |  HOUSTON  |  0912-73-212  |  07/02/2021  |  $429,836.83  |  BR 1802(833)  |  REPLACE BRIDGE AND APPROACHES  |  112 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
ARANDA BROTHERS CONSTRUCTION CO., INC.
JOHN REED AND COMPANY, LLC
ISI CONTRACTING, INC.
EARTH BUILDERS, L.P.
MILLIS DEVELOPMENT AND CONSTRUCTION, LLC
PREPARING ROW
STA 3.600 $2,800.000 $701.170 $3,000.000 $2,500.000 $5,000.000 $7,500.000 $5,428.200
EXCAVATION (ROADWAY)
CY 373.000 $7.500 $7.970 $12.000 $25.000 $34.000 $25.000 $23.440
EXCAVATION (CHANNEL)
CY 120.000 $10.500 $10.520 $13.500 $30.000 $50.000 $25.000 $37.060
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 868.000 $8.500 $15.000 $15.500 $30.000 $35.000 $25.000 $22.350
BLOCK SODDING
SY 1,041.000 $3.200 $8.740 $4.500 $3.500 $6.000 $8.000 $7.090
STRAW OR HAY MULCH
SY 1,041.000 $0.190 $1.210 $0.500 $1.000 $1.100 $3.500 $1.360
BROADCAST SEED (TEMP) (WARM)
SY 521.000 $0.140 $2.760 $0.500 $0.500 $2.000 $3.500 $2.450
DRILL SEED (TEMP)(WARM OR COOL)
SY 521.000 $0.100 $5.000 $0.500 $3.000 $2.000 $3.500 $2.450
FERTILIZER
AC 0.100 $650.000 $10,000.000 $1,500.000 $2,000.000 $2,050.000 $5,000.000 $2,463.400
VEGETATIVE WATERING
MG 26.000 $17.000 $60.120 $35.000 $50.000 $13.000 $150.000 $58.320
D-GR HMA(SQ) TY-B PG64-22
TON 298.000 $10.500 $204.000 $115.000 $120.000 $135.000 $250.000 $144.970
TACK COAT
GAL 41.000 $4.000 $12.630 $15.000 $5.000 $3.000 $20.000 $3.270
CEM STABIL BKFL
CY 27.000 $60.000 $100.000 $60.000 $60.000 $46.000 $120.000 $61.590
DRILL SHAFT (30 IN)
LF 252.000 $150.000 $179.000 $225.000 $295.000 $320.000 $260.000 $256.150
CL C CONC (ABUT)
CY 25.200 $839.000 $674.420 $975.000 $1,600.000 $1,120.000 $1,400.000 $1,209.900
REINF CONC SLAB (SLAB BEAM)
SF 1,570.000 $14.000 $18.000 $13.700 $15.000 $22.500 $24.000 $20.710
APPROACH SLAB
CY 39.000 $450.000 $450.000 $455.000 $500.000 $780.000 $650.000 $547.180
PRESTR CONC BOX BEAM (4B20)
LF 238.000 $250.000 $232.000 $245.000 $250.000 $210.000 $220.000 $263.780
PRESTR CONC BOX BEAM (5B20)
LF 119.000 $250.000 $264.000 $245.000 $250.000 $210.000 $220.000 $383.680
RIPRAP (STONE PROTECTION)(12 IN)
CY 128.000 $89.000 $146.000 $205.000 $110.000 $110.000 $170.000 $249.610
RIPRAP (MOW STRIP)(4 IN)
CY 13.000 $450.000 $400.000 $675.000 $500.000 $750.000 $500.000 $531.920
RAIL (TY T223)
LF 152.000 $120.000 $99.630 $90.000 $140.000 $93.000 $110.000 $156.960
ARMOR JOINT
LF 44.000 $85.000 $92.290 $140.000 $58.000 $105.000 $90.000 $82.840
RC PIPE (CL III)(30 IN)
LF 47.000 $85.000 $125.000 $85.000 $100.000 $100.000 $150.000 $117.720
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $2,500.000 $5,000.000 $2,650.000 $2,100.000 $2,705.000 $3,000.000 $6,223.900
REMOV STR (PIPE)
LF 44.000 $17.500 $10.000 $10.000 $10.000 $21.000 $20.000 $18.530
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $18,000.000 $25,000.000 $25,000.000 $46,000.000 $27,000.000 $20,000.000 $36,297.000
MOBILIZATION
LS 1.000 $43,000.000 $47,000.000 $45,000.000 $50,000.000 $58,000.000 $55,000.000 $80,878.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $631.000 $1,600.000 $1,400.000 $3,500.000 $1,000.000 $1,754.900
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $30.000 $18.080 $30.000 $40.000 $35.000 $55.000 $45.240
ROCK FILTER DAMS (REMOVE)
LF 60.000 $10.000 $13.030 $5.000 $8.000 $10.000 $10.000 $10.900
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $25.000 $28.970 $25.000 $20.000 $25.000 $40.000 $23.440
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $10.000 $10.020 $5.000 $5.000 $7.500 $10.000 $6.540
CONSTRUCTION PERIMETER FENCE
LF 106.000 $2.600 $11.160 $4.000 $5.000 $1.500 $8.000 $1.910
TEMP SEDMT CONT FENCE (INSTALL)
LF 557.000 $2.500 $4.070 $5.000 $5.000 $4.000 $4.500 $1.910
TEMP SEDMT CONT FENCE (REMOVE)
LF 557.000 $0.700 $1.400 $2.000 $2.000 $2.500 $1.000 $0.820
DRIVEWAYS (ACP)
SY 38.000 $45.000 $126.000 $30.000 $60.000 $56.000 $65.000 $64.860
MTL W-BEAM GD FEN (TIM POST)
LF 87.500 $20.000 $14.420 $35.000 $25.810 $27.500 $28.000 $33.250
MTL BEAM GD FEN TRANS (TL2)
EA 3.000 $1,200.000 $420.700 $1,775.000 $1,364.000 $1,450.000 $1,400.000 $1,765.800
SHORT RADIUS
LF 9.000 $30.000 $140.230 $60.000 $105.000 $112.000 $55.000 $136.250
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $1,200.000 $1,262.090 $1,500.000 $1,291.000 $1,375.000 $800.000 $1,678.600
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,400.000 $420.700 $3,050.000 $2,734.000 $2,905.000 $3,000.000 $3,542.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $450.000 $1,071.000 $550.000 $612.000 $650.000 $650.000 $793.520
REMOVE SM RD SN SUP&AM
EA 2.000 $85.000 $100.000 $150.000 $100.000 $106.000 $150.000 $129.710
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $22.000 $15.000 $50.000 $20.000 $21.250 $10.000 $26.160
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 10.000 $22.000 $18.000 $65.000 $120.000 $127.000 $50.000 $155.870
REFL PAV MRK TY II (W) 6" (SLD)
LF 720.000 $0.150 $1.580 $5.000 $1.250 $1.350 $2.000 $1.640
REFL PAV MRK TY II (Y) 6" (SLD)
LF 720.000 $0.150 $1.580 $5.000 $1.250 $1.350 $2.000 $1.640
REFL PAV MRKR TY II-A-A
EA 9.000 $3.500 $12.000 $85.000 $12.000 $13.000 $15.000 $15.810
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 210.000 $45.000 $108.000 $75.000 $35.000 $100.000 $85.000 $90.470
Totals: $429,836.830 $474,034.066 $480,315.500 $538,299.375 $583,636.350 $597,995.000 $632,670.975