PREPARING ROW
|
STA
|
6.300
|
$5,000.000
|
$9,000.000
|
$17,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
2,108.000
|
$6.000
|
$4.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
688.000
|
$15.000
|
$25.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
796.000
|
$20.000
|
$25.000
|
$25.000
|
|
|
BLOCK SODDING
|
SY
|
2,320.000
|
$8.000
|
$3.000
|
$6.000
|
|
|
FERTILIZER
|
AC
|
0.500
|
$850.000
|
$1,000.000
|
$700.000
|
|
|
VEGETATIVE WATERING
|
MG
|
58.000
|
$15.000
|
$20.000
|
$50.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
106.000
|
$65.000
|
$102.000
|
$120.000
|
|
|
CEMENT
|
TON
|
25.000
|
$140.000
|
$130.000
|
$180.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
1,394.000
|
$2.000
|
$3.000
|
$10.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
372.000
|
$130.000
|
$95.000
|
$95.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
159.000
|
$4.000
|
$6.000
|
$4.000
|
|
|
D-GR HMA(SQ) TY-C PG70-22
|
TON
|
189.000
|
$72.000
|
$140.000
|
$200.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
816.000
|
$98.000
|
$160.000
|
$100.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
558.000
|
$200.000
|
$250.000
|
$260.000
|
|
|
CL C CONC (ABUT)
|
CY
|
49.400
|
$1,200.000
|
$1,200.000
|
$1,700.000
|
|
|
CL C CONC (BENT)
|
CY
|
20.300
|
$1,500.000
|
$1,200.000
|
$2,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
18.800
|
$900.000
|
$1,200.000
|
$2,500.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
7,037.200
|
$15.000
|
$9.000
|
$20.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
978.700
|
$10.000
|
$8.000
|
$14.000
|
|
|
APPROACH SLAB
|
CY
|
210.300
|
$600.000
|
$500.000
|
$400.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
668.620
|
$220.000
|
$180.000
|
$160.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
826.640
|
$220.000
|
$180.000
|
$160.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
3.300
|
$500.000
|
$500.000
|
$750.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
523.000
|
$150.000
|
$120.000
|
$130.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
11.000
|
$600.000
|
$500.000
|
$1,200.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
182.000
|
$10.000
|
$15.000
|
$40.000
|
|
|
RAIL (TY T223)
|
LF
|
307.100
|
$125.000
|
$104.000
|
$130.000
|
|
|
RAIL (TY C223)
|
LF
|
134.500
|
$150.000
|
$115.000
|
$250.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
62.000
|
$100.000
|
$45.000
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
114.000
|
$70.000
|
$70.000
|
$85.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
5.000
|
$1,500.000
|
$425.000
|
$1,400.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,800.000
|
$5,000.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
54.000
|
$35.000
|
$10.000
|
$10.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
164.000
|
$60.000
|
$400.000
|
$300.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$20,000.000
|
$45,000.000
|
$20,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$112,664.720
|
$145,000.000
|
$129,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$6,400.000
|
$1,400.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
250.000
|
$50.000
|
$30.000
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
250.000
|
$20.000
|
$10.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
234.000
|
$34.000
|
$30.000
|
$45.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
234.000
|
$12.000
|
$10.000
|
$13.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,174.000
|
$5.000
|
$3.000
|
$1.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,174.000
|
$2.000
|
$1.000
|
$0.700
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
105.000
|
$4.100
|
$15.000
|
$25.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
662.000
|
$26.000
|
$25.000
|
$40.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
36.000
|
$65.000
|
$120.000
|
$110.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
42.000
|
$35.000
|
$60.000
|
$115.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
121.000
|
$50.000
|
$65.000
|
$85.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
162.500
|
$25.000
|
$21.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$1,500.000
|
$2,650.000
|
$1,600.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
1.000
|
$1,500.000
|
$1,000.000
|
$1,170.000
|
|
|
SHORT RADIUS
|
LF
|
24.000
|
$51.000
|
$36.000
|
$31.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$1,500.000
|
$1,000.000
|
$735.000
|
|
|
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
|
EA
|
1.000
|
$1,800.000
|
$2,650.000
|
$1,575.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$4.000
|
$3.000
|
$2.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$267.000
|
$75.000
|
$170.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,400.000
|
$2,450.000
|
$5,400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$548.000
|
$600.000
|
$575.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$277.000
|
$50.000
|
$51.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
14.000
|
$50.000
|
$50.000
|
$88.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
12.000
|
$26.000
|
$50.000
|
$93.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
14.000
|
$40.000
|
$9.000
|
$12.000
|
|
|
INSTL OM ASSM (OM-3L)(FLX)SRF
|
EA
|
4.000
|
$200.000
|
$250.000
|
$138.000
|
|
|
INSTL OM ASSM (OM-3R)(FLX)SRF
|
EA
|
4.000
|
$200.000
|
$250.000
|
$138.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,109.000
|
$1.400
|
$0.450
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
670.000
|
$0.400
|
$0.450
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
90.000
|
$1.000
|
$0.450
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
19.000
|
$5.000
|
$25.000
|
$6.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
56.000
|
$25.000
|
$30.000
|
$70.000
|
|
Totals: |
$1,519,233.020
|
$1,514,086.650
|
$1,781,135.800
|